N.G. Karkhane (USA) B.E. (Hons.)(Pilani), M.Tech., (llT, Mum), F.l.E., F.l.V., MISSE, MWWA, MACI + Consulting Civil Engineerl' Structural Designer .1. Government Registered Propert! Valuer (CAT l-474) (o)024a-2452305 (n) 2485153 .3. Structural Auditor, {' Chartered Engineer (F-11017-15) (M)9823028081 'MOGRA' Rana Nagar, opp. HotelAtithi, Jalna Road, Aurangabad - 431003. E-mail : ngkarkhane@gmail.com FORM-2 [. See Regulation 3l ENGINEER'S CERTIFICATE Project and for withdrawal of MoneY from (To be submitted at the time of Registration of Ongoing Designated. account - Protect Wise) Date:11.10.2024 To Vikas DeveloPers crs No.20310/4 Shri Dnyanesh Arcade, Samarth Nagar, Aurangabad subject: certificate of cost [incurred for Development of sAl APQQRWAI having MahaRERA by VTKAS DEVELOPERS Registration Number p51500022303 being developed Sir of certifying Estimated cost for having SAI I N.G.Karkhane have undertaken assignment MahRERA Registration Number P51500022303 being developed by vikas ApooRWAI DeveloPers works required for completion of the 2. We have estimated the cost of civil, MEP and allied & external works of the project as per specific apartments and proportionate completion of internal cost calculations are based on the available actions mentioned in attachment of sale. our estimated by the Developer / Consultants. The Schedule made available to us for the project under reference calculated by Quantity surveyor* appointed by of items and quantity required for the entire work as Developer Engineer. The assumption to the cost of material' Labour and other inputs mad by given us to ascertain / confirm the above analysls deveroper. and the site inspection carried out by to us. 3. We estimate Total Estimated cost of' completion of the aforesaid project under reference at Rs.2,47,!3,040/- (Total of Table A and B) at the time of Registration' The estimated Total Cost of of the project is with references to the Civil, MUP and Allied works required for completion external works' As per specifications apartments and Proportionate complication of internal mentioned in agreement of sale and For the purpose of obtaining occupation certificate wine(s) r Layout / Plotted Development from the being /completion certificate for the Building(s) / aforesaid project is being implemented' the planning Authority under whose jurisdiction ihe 4. The Estimated cost lncurred till date is calculated alRs' 2,47 ,!3'040 (Total of Table A and B) the basis of input materials/services used and amount of Estimated cost incurred is calculated on the unit cost of this items' 5' The Balance cost of completion of the civil, MEp and Allied works for completion of the apartments and Completion of internal & external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.ol- {Total of Tabie A and B) 6' I certify that the cost of the civil, MEP and allied work for the apartments and proportionate and internal & External works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table A and B) below: TABTE-A Building lWingl Layout / plotted Development bearing Number_ or called_ (To be prepared separately for each building /wing / layout /Rlotted oevel opment of the Real Estate Sr.no Pa rticula rs Amount in Rs.) 1. Total estimated Cost of th e Building/Wing / Layout / Hotted Rs.2,47,L3,040/- as on date of stration is 2 Cost I n cu rred as on date of' certifica te 30. 09 .2024 Rs.2,47 3 Work done in as Pe of the estimated LOO% 4 Bal a n ce Cost to be I ncu rred* * Based on ErSt imate d Cost) Rs. 4l- 5 Cost lncurred on Additional /Extra items not included in the NIL Estimated Cost (Table 30,09.2024 TABLE.B lnternal & External Develo ,tttgtt Works in of the stered Phase Sr Pa rticula rs Amount (in Rs.) No L Total Estimated Cost of the lnternal and External Development NIt Works includi amenities and Facilities in 2 Cost incurred as on date of certificate NIL 3 Work done in Perce (as Perce of the estimated cost) NIt 4 Balance Cost to be incurred** d on Estimated Ntr 5 Cost lncurred on Additional /Extra items not included in the Ntt Estimated Cost ble Yil* r$ tr A).fii, {!1i.tt ignatt"r r* rf i.:rq i n r.l*r Agreed and Accepted by: Signature of f,ry\h Name: $ Note 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (-) Quantity survey can be done by office of Engineer or can be done by an independent euantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer; who is responsible for the quantity calculated should be mentioned at the place marked (") 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1,) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this an estimated cost, any deviation in quantity required for development of the Real Estate project will result in amendment of the cost incurred to be incurred. 5. All components of work with specifications are indicative and not exhaustive 6' Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted ttems considered in Cost (which were not part of the original Estimate of Total Cost) Sr.no Particulars Amount (ln Rs.) 1 2 1;