R.S. JADHAV ARCHITECT J.3. AS sffiffiIATE A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA, STADIUM SUTGIRNI CHOWK, GARKHE DA, AURANGABAD.- 431 OO5 INDIA CONTACT: +91.240 - 2983017, M.: 9370591198, 7588534485 e-mail : jbandassociatel @gmail.com ARCHITECT INTERIOR DESIGNER & VALUER FORM 1 lsee Regulation 3l (ro be submitted at the time "t *T,:,il#:I;:qffiTtJIJ:l::, ror withdrawar or Money rrom Designated Account) DATE 1 1.04.2022 To M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.203 10/4, Samarth Nagar,Aurangabad. Subject: certificate of Percentage of completion of construction work of sAI ApooRWAI" having MahaRERA Registration Number P51500022303 being developed by Vikas Developers I R'S'JADHAV have undertaken assignment as Architect /Licensed surveyor of certifying percentage of completion of construction work of sAl APooRWAI having MahaRERA Registration Number P51500022303. being developed by Vikas Developers Based on Site inspection. with respect to Layout / each of the of the aforesaid Real Estate project. certify that as on the date of this certificate, the percentage I of work done for each of the building/wing of the Real Estate Project under Maha RERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Numbe (To be prepared separately for each Layout building/Wing of The Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) 1.. Excavation 100% 2 Basement's if 100% 3. Podiums a 4. Plinth 100% 5 Stilt Floor 100% 5 Slabs of Su Structu re 100% 7 Internal walls, lnternal pl aster, Floorings, l) doors and windows 9s% within remises 8 Sanita Fitti within the Fl ises 95o/o 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead 100% and Un nd Water Tanks 10 Externa p lu m b ing a nd externa p laste r, elevation, com p letio n 100% of terraces with wate n8 of e B U ildi lt lnstallation of Lifts. water pumps, Fire Fitting Fittings a nd Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 90% NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities' TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Common areas and facilities Propose Percentage of Actual Details Sr No (2) d Work Done (1) (Yes/No (4) (s) ) (3) 7 lnternal Roads & Footpaths NO 0% NA 2. Water Supply YES 0% NOT YET STARTED 3. Sewerage (Chamber, lines, YES 100% DRAINAGE LINE & CHAMBER Septic Tank, STP). ONLY attached to MuniciPal Corporation Disposal 4 Storm Water Drains NO NA 5 Landscaping & Tree P!C!!!E_ YES 50% Not Yet Started 6. Street Lighting YES 100% Not Yet Started 7 Commu Build NO NA 8 Treatment and disPosal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA 10 Water conservation / Rain water YES 50% NOT YET STARTED harvesting 1.1. Energv management. NO NA t2 fire protection and lire SafetY NO NA irements 13 Electrical meter room, sub- NO NA station, receiving station. it t4 Others (Option ) r's Fa &N (License No Agreed and Accepted Signature of Promoter Name: Date: