R.S. JADHAV ARCHITECT ,C-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA, s Jicintl r -ciowK, cARKHEDA, STADIUTI RURnNSRaRD-' 43 1 005 INDIA coHinci +91.240- 2983017' M.: 9370591198, 7588534485 J.3.A55c,EI ATE ARCHITECT INTERIOR DESIG NER & VALUER e-mail : jbandassociatel @gmail com FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 12.10.2024 To M/s. Vikas DeveloPers, Shri Dnyanesh Arcade,CTS No.Z0310/4, Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI APOORWAI" having MahaRERA Registration Number P515OOO223O3 being developed by Vikas Developers I R.S.JADHAV have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI APOORWAI having MahaRERA Registration Number P51500022303. being developed by Vikas Developers Based on Site inspection. with respect to Layout / each of the of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABTE-A Layout / Building Wing Number_ (To be prepared separately for each Layout building/Wing of The Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) (3) 7. Excavation !o0% 2 Basement's (if any) 100% 3. Podiums (if anv) 4. Plinth 100% 5. Floor 700% 6. Slabs of Super Structure L00% 7 lnternal walls, lnternal Plaster, Floorings, l) doors and windows 100% within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 700% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead L00% and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion L00% of terraces with waterproofing of the Building/wing. 11_ lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRz too% NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Propose Percentage of Actual Details No (2) d Work Done (1) (Yes/No (4) (s) ) (3) 7. lnternal Roads & Footpaths NO 0o/o NA 2. Water Supply YES 100% NOT YET STARTED 3. Sewerage (Chamber, lines, YES 700% DRAINAGE LINE & CHAMBER Septic Tank, STP). ONLY attached to Municipal Corporation Disposal 4. Storm Water Drains NO NA 5. Landscaping & Tree Planting YES 700% Not Yet Started 6. Street Lighting YES 700% Not Yet Started 7 Community Buildinss NO NA 8 Treatment and disposal of NO NA sewage and sullage water, 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES t00% NOT YET STARTED harvesting 7L Energy management. NO NA 72 fire protection and lire Safety NO NA requirements 1.* 13 Electrical meter room, sub- NO NA station, receiving station. 14 Others (Option to Add more) a tPs . c r s a rlodrt6tHtfr ft rys'':co (Liolnse Nd. CAJ9sr.r)5610 Agreed and Accepted by: Signature of Pro ' Name: f Date: i 4: