R.S. JADHAV ARCHITECT A.306, CITIUS, 'd SPACE OLYMPIA, NEAR GARKHEDA' STADIUM JieinNi ciiarux, cARKHEDA, AURANGABAD' 43 00s N D coNilci : +91.2a0 - 2983017 M.: 9370591198, 1 7588534485 I IA J.3.AsSc,E IATE ARCHITECT INTERIOR DESIGNER & VALUER e-mail : jbandassociatel @gmail com FORM 1 fisee Regulation 3l ARCHITECT'S GERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 10.07.2024 To M/s. Vikas DeveloPers, Shri Dnyanesh Arcade,CTS No.203tO I 4' Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI APOORWAI" having MahaRERA Registration Number P51500022303 being developed by Vikas Developers I R.S.JADHAV have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI APO0RWAI having MahaRERA Registration Number P51500022303. being developed by Vikas Developers Based on Site inspection. with respect to Layout / each of the of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Numbe r_(To be prepared separately for each Layout building/Wing of The Sr Tasks / Activity Percentage of Actual Work Done (2) (As on date of this No (1) Certificate) (3) t. Excavation L00% 2. Basement's (if any) too% 3. Podiums (if any) 4. P LO0% 5 stilt 700% 6 Slabs of Super Structure 100% 7. wal ls, lnternal Plaster, Floorings, l) doors and windows L00% within 8 Sanitary Fittings within the L00% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead L00% and Unde nd Water Tanks 10 External plumbing and external plaster, elevation, completion 100% of terraces with waterProofing of the Building/wing. 11. lnsta llat ion of t-ifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 7OO"l" NOC. Finishing to entrance lobbyls" plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered phase/project Number Sr Common areas and facilities Propose Percentage of Actual Details No (2) d Work Done (1) (Yes/No (4) (s) ) (3) 1. lnternal Roads & Footpaths NO 0% NA 2. Water Supply YES 700% NOT YET STARTED 3. Sewerage (Chamber, lines, YES 700% DRAINAGE LINE & CHAMBER Septic Tank, STP). ONLY attached to Municipal Corporation Disposal 4. Storm Water Drains NO NA 5 Landscaping & Tree Planting YES 700% Not Yet Started 5 Street Lighting YES 100% Not Yet Started 7 Community Buildings NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 100% NOT YET STARTED harvesting 77 Energy management. NO NA t2 fire protection and Iire Safety NO NA requirements 13 Electrical meter room, sub- NO NA ij station, receiving station. 74 Others (Option to Add more) tor n%,tR+ainfi, .s610 Agreed and Accepted by Signature of Name: Date: