R.S. JADHAV ARCHITECT A-j06 clrlus, SPACE OLYMPIA' NEAR GILKIIED| sTADluM - 431005 INDIA cHowK, cmriH?di nunnHcnano7588534485 J.3.A55c,E IATE :tsi{Y[}] :iil;;ii "'irc,RNl :iesidlr M sszosgttga nnlurrcr INTERIoR DESIGNEIR & VALUER J--nair joandassocratel @gmarl com FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFICATE and for withdrawal of Monev from (To be submitted at the time of n"g'*tt"ti* "t P":tf:::,i,i,lect DATE',10.04.2024 To M/s. Vikas DeveloPers, Shri Dnyanesh Arcade,CTS No'203LO I 4, Samarth Nagar,Aurangabad' subject: certificate of Percentage of completion of construction work of SAI APOORWAI" developed by Vikas having MahaRERA Registration Number P515OOO223O3 being Developers Surveyor of certifying Percentage of I R.S.JADHAV have undertaken assignment as Architect /Licensed Number Completion of Construction work of sAl APOORWAI having MahaRERA Registration P515OOO223O3' being developed by Vikas Developers Based on site inspection. with respect to Layout / each of the of the aforesaid Real Estate Project' I of work done for each of the certify that as on the date of this certificate, the Percentage RERA is as per Table A herein below' building/wing of the Real Estate Project under Maha phase is detailed percentage of the work executed with respect to each of the activity of the entire in Table t ,ABLE'A of The Layout / Building wing Numbe r--(To be prepared separately for each Layout building/wing Tasks / Activity Percentage of Actual Work Done Sr (As on date of this No l2l (1) L, Excavation 100% 2. Basem ifa 3. Podiums L00% 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Structu re windows 100% 7 lnternal walls, lnterna I Plaster, Floorings, l) doors and within ta}% 8 Sanita within the L00% 9 Staircases. Wells and Lobbies at each Floor level Overhead and und Water Tanks LOO% 10 ExternalPlumbi ng and externa plaster, elevation, completion of terraces with of the Bu !l t7 Installation of Lifts water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 100% NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development works) in respect of the Registered phase/project Number Sr Common areas and facilities Propose Percentage of Actual Details No (2) d Work Done (1) (Yes/No (4) (s) ) (3) 7. lnternal Roads & Footpaths NO 0% NA 2 Water Supply YES 100% NOT YET STARTED 3. Sewerage (Chamber, lines, YES 700% DRAINAGE LINE & CHAMBER Septic Tank, STP). ONLY attached to Municipal oration Disposal 4. Storm Water Drains NO NA 5. Landscaping & Tree Planting YES 70lYo Not Yet Started 6. Street Lighting YES 100% Not Yet Started 7 Community Buildinss NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 100% NOT YET STARTED harvesting 77 Energy management. NO NA 72 fire protection and lire Safety NO NA requirements 13 Electrical meter room, sub- NO NA station, receiving station. t4 Otherl(Option to Add more) . , ,r. . . r' r,i i aS! i- rirdr,-i Your's Faithfully, g_ /W.)g'rrp.tKata Ar c i$pSh*rffi H# ilrt lpffct ( Li ;"fi 98 hff Y' grJe3l s 6 1 o Agreed and Accepted by: Signatu N i^,i, Date: I 1