"R.S. JADHAV ARCHITECT A.306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA, ;JiGiRNi aiirwk, emxxEDA" AURAI19AqAD-' 431 005 INDIA ;oi.li;[i Iiei jrd -2e83017, M.: e3705e11e8, 7588534485 STADIU]VI ,.3.A55c,E IATE ARCHITECT TNTERIOR DESIGNER & VALUER e-mail : jbandassociatel @gmail'com FORM 1 lsee Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 10.04.2023 To M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.20310/4, Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI APOORWAI" having MahaRERA Registration Number P51500022303 being developed by Vikas Developers I R.S.JADHAV have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI APOORWAI having MahaRERA Registration Number P51500022303. being developed by Vikas Developers Based on Site inspection. with respect to Layo-ut I each of the of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Numbe r_(To be prepared separately for each Layout building/Wing of The Sr Tasks / Activity Percentage of Actual Work Done (As on date of this No l2l (1) Certificate) (3) 7. Excavation L00% 2. Basement's ifa !oo% 3 Podi ifa 4. Plinth 100% 5 Stilt Floor LO9% 6. of Structure 100% 7 lnternal ls, lnternal Plaster, Floorings, l) doors and windows L00% within 8 Sanita within the L}a% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead to}% and nd Water Tanks 10 External plumbing and external plaster, e levation, completion 100% of terraces with waterproofing of the Build tL lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanicai equipment, compliance to conditions of environment/CRZ toj% NOC. Finishing to entrance lobbyls. plinth protection, paving of areas appurtenant to BuildinglWing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B common Areas (lnternal and External Development works) in respect of the Registered phase/project Number Sr Common areas and facilities Propose Percentage of Actual Details No l2l d Work Done (1) (Yes/No (4) (s) ) (3) 7. lnternal Roads & Footpaths NO 0% NA 2. Water YES 700% NOT YET STARTED 3. Sewerage (Chamber, lines, YES 100% DRAINAGE LINE & CHAMBER Septic Tank, STP). ONLY attached to Municipal 4. Storm Water Drains NO NA 5 & Tree Planti YES 100% Not Yet Started 6 Street Lighting YES 700% Not Yet Started 7 Community Buildings NO NA 8 Treatment and disposal of NO NA and su water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 700% NOT YET STARTED harvesti 7t Energy management. NO NA 72 fire protection and lire Safety NO NA rements 13 Electrical meter room, sub- NO NA station, receiving station. 74 Others (Option to-A{d more) i::r trlanisrr t( Your's hfully, utr (License No. .............) Agreed and Signature Name: Date: