I t l FORM.2A ISee MahaRERA order no. of Z}lgl ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (site supervisor,s certificate) (To be uploaded quarterly) To, The Vikas Developers, CTS. No.2O3LO/4, Shri Dnyanesh Arcade, Samarth Nagar, Aurangabad Qualitv Assu rance Certificate (certificate no sA,rpponwayoslor the quarter ending 30.06.202{) Subject : Certificate for quality bf materials used and quality of Construction and workmanship for the Work of 1No, of Building of the project SAI APoORWAI situated on the Plot bearing Final Plot no PLor ruo.2oo crs rrrb. 1sg6tzz, demarcated by its boundaries (latitucle and longitude of the endpoints) pLoT N0 17g to the North 30 FEET WIDE ROAD to the South PLOT NO.199 to t'he East 30 FEET WIDE ROAD to the west of of oir11s1q1*Aurangabad village nuranganad taluka Rurangauad District Aurangabad PIN 431005 admeasuring 4+s.00 *q.,itru. area being deviloped by by l\{/s. Vikas Developers (prop. Vikas Laiman Chaudhary) [Promoter's Name: Vikas Laxman Chaudhary] Reference: IVIahaRERA Registration Number- p515ooo 22go3 Sir, I Siddheshwar Zadage have undertaken an assignment of supervision of this real estate project. f . Our Responsibility: - To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of-*or1'anA 1. Material Testinq :- l/we, have applied following mandatory checks on the basic materials, used in the construction. i. Cement- It has been tested for its fineness, soundness, setting^tiTle, compressive strength etc. as per ts code 3s35:1986 or as per other rerevanr rs7asfi{Bc;il;;;as per industry standards and its resurts are within the permissinte iimits. ii. Coarse aggregate - It has been tested, for deleterious materials, clay lumps, crushing value, impact value per ls 2$u 1986 or as per other as relevant rs/gs/NBd code or as per industry and its results are within the permissible standards limits iii. Bricksi blocks - They have been tested for water absorption, crushing strength etc. as per ls 5454:1g7g or as per other relevant ls/8s/NBC code or m pu,. iriustry standards and its results within permissible limits. are iv. Concrete/Ready-m ix Concrete- It has been tested for compressive strength for various periods as per 15 456.2a00 and ls 1 199 or as per other relevant ls/BS/NEc roa"r, results are within permissible limits. ,, per industry standards and its v. Steel for concrete- It has been tested as per ls 2062:20 11 or..as per other relevant |S/BS/NBC per industry standards for tensile strength, code or as *iongriion and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials other materials like sand, crushed.land, floor tiles, sanitary fittings etc' (List out all itemsj ,fixtures and {fittings, pipes and ls/BSiNBC code or as per standards laid ,r*o in-ir',iu project conform to relevant down Lv fl',L industry for a particular material. 2. Workrnanship:- ll we hereby certify that work has been carried out under our supervision. certify that workmansh.ip a.nd quarity is. satisfa;i;d;;'rp to the mark and thewe further work has within tlre $ermilsibte timirs Jr J"rirtions 3l-T,#t-ptable is t";;;"rnt code of 3" Electrical Materials and workmanship: _ works of all the electrical wiring/connections/lift installationlother electrical installations have been carried out under Juthorizedlregiitere*eiJctricat has been maintained' The materials used engineer and its records ionform to the relevant l.s/ B.si National Building codes or as per industry stinAarOs. 4. Structural engineer: - Promoters has engaged structural engineer Mr. Vikas L.chaudhary having Licenses no. E.126191 having office no(0240)2329620 . ceil no gg2zCIz42g1 The structural design of buildings in this project has been done under his supervision. He has checked the soil report before laying F'CC for foundation in consultation with soil consultant. The formwork and concrete mix design has been done as per Is 10262:200g or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETy have been kept on record. 5. Preservation of records: * Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law 6' Please specify materials or any other item of works which were not conforming to the standard specifications and which were not rejected. Niil Yours Faithfully, $ignature of Engineer (Site Supervisori Name:Siddheshwar Jadage Phone no.7767800192