MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government of Maharashtra Undertaking) Office of The Executive Engineer MIDC Civil Dn. Aurangabad E-mail:eeaurangabad@midcindia.org./Web:www.midcindia.org(0240-2342188/FAX-0240-2342186. Commencement Certificate No.DB/SPA/ A-04887 of 2020, Office of the Executive Engineer, MIDC Civil Division, Aurangabad Date: - 03.01.2020 To, M/S Shri Arch Developers Plot No.P-15 Shendra Five star Industrial Area Sub :- 1] Commencement Certificate Ref :-1] Online application vide SWC/110/521/20190821/652982 2] Provisional Fire NOC No.DFO/ABD/D-91817 Dtd.02.12.2019 Dear Sir, With reference to your Online application No SWC/110/521/20190821/652982 for grant to sanction of commencement certificate to carry out development work of Commercial + Residential and Building Permit under Section 45 of MR & T.P. Act, 1966 to erect a Residential building on Plot No. P-15 of Commercial Zone situated in Shendra Five Star Industrial Area, the commencement / Building Permit is granted subject to the following conditions:- 1) You had submitted plans and drawings for Parking of Ground Floor for the plot area of 5000.00 Sqm, at present this office has approved plans for total upto date 1556.70 Sqm. of built up area for Residential Building This office has approved 2 No. of drawing details of which are mentioned on the accompanying statement. 2) No new building or part thereof shall be occupied or allowed to be occupied or used or permitted to be used by any person until occupancy permission has been granted. 3) The Commencement Certificate/ Building Permit shall remain valid for a period of one year commencing from the date of its issue. 4) This permission does not entitle you to develop the land which does not vest in you. 5) Minimum two trees in plots 200sq.m and such number of trees at the rate of one tree per 100 sq . m for plots more than 200 sq. m in area shall be planted and protected. In case of Group housing, minimum two trees per tenement shall be planted and protected 6) Mixed use permission is granted as per proportion as 60 % Commercial and 40% Residential use. 7) You should be obtain further approval of Commercial Use ,as per proportional of mix use of plot. 8) Since you have paid following EE I) Development charges.Rs.128272/- R.No.GL20293929 Dt.09.09.2019,& GL20504363 Dt. 02.01.2020 II) Scrutiny fees, Rs. 12400/- R.No. GL20293929 Dt.09.09.2019,& GL20504363 Dt. 02.01.2020 iii) labour Cess, Rs.351927/- R.No. GL20293929 Dt.09.09.2019,& GL20504363 Dt. 02.01.2020 Thanking you, Your’s faithfully, BHUSHAN Digitally signed by BHUSHAN BHASKARRAO HARSHE DN: c=IN, o=MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION, ou=ENGINEERING, BHASKARRA 2.5.4.20=0997f1cd3ce3365ac7b9e60b6422f6375e15 d21de5baa254fe5051ee547ea7c9, postalCode=431001, st=MAHARASHTRA, serialNumber=ba552fffc07b5e399e0ead37ffbe8276 O HARSHE 7ad8758136433a854dee8b00a6fb341a, cn=BHUSHAN BHASKARRAO HARSHE Date: 2020.01.03 17:16:21 +05'30' Executive Engineer(SPA) MIDC Civil Division Aurangabad DA:- 1. One Statement showing details of drawings and built up area approved. 2. Copy of approved drawings/plans. 1. Accompanying statement. No. DB/SPA/ A-04887 of 2020, dated:- 03.01.2020, Commencement issued by the Office of the Executive Engineer, MIDC Civil Division ,Aurangabad ,Addressed to :- M/S Shri Arch Developers, Plot No.P-15, in MIDC Shendra Five Star Industrial Area. Aurangabad Sr. Name of Particulars Built up Area No Architect . BCC Plan Ground First Floor to Excess Total Approval Floor Seventh Floor Balcony area In sqm sqm. in sqm 1. Yogesh Present 1.Residential Parking 1st Floor - 221.43 0.96 222.39 Zawar Approval Building 2nd Floor - 221.43 0.96 222.39 Reg.No.CA/ 3rd Floor - 221.43 0.96 222.39 98/23394 4th Floor - 221.43 0.96 222.39 5th Floor - 221.43 0.96 222.39 6th Floor - 221.43 0.96 222.39 7th Floor - 221.43 0.96 222.39 2. Total Built Up Area 00.00 1550.01 6.70 1556.70 Note :- Mixed Use Permission is granted as per Circular No.MIDC/CP/C-20310 Date.16.07.2019 . You should be maintain minimum 40% F.S.I.as per MIDC Circulars REMARKS.:- 1.Plot Area . :- 5000.00 m2 . 2.Upto date Ground Coverage in M2 :- Parking 2. F.S.I. in Ground coverage :- 0.00< 0.50 3.Total Built up area in m2 :- 1556.70 m2.(Residential) (Commercial -60% and Residential-40%) 4.Total F.S.I consumed. :- 0.37< 1.00 5.U.G.Water Tank:- 35.78 M2 Digitally signed by BHUSHAN BHASKARRAO HARSHE BHUSHAN DN: c=IN, o=MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION, ou=ENGINEERING, 2.5.4.20=0997f1cd3ce3365ac7b9e60b642 BHASKARR 2f6375e15d21de5baa254fe5051ee547ea7 c9, postalCode=431001, st=MAHARASHTRA, AO HARSHE serialNumber=ba552fffc07b5e399e0ead3 7ffbe82767ad8758136433a854dee8b00a6 fb341a, cn=BHUSHAN BHASKARRAO HARSHE Date: 2020.01.03 17:16:04 +05'30' Executive Engineer(SPA) MIDC Civil Division Aurangabad