,R:,S. JADHAV ARCHITECT trIO E-306. CITIUS, SPACE OLYMPIA, Gu:rafri orbwx, cenixEon, ;ilfiiii NEAR GARKHEDA STADIUM runru{$aAo-- 431005 INDIA i :is] 2ai'-zssiol t-i' es705el e8' 7s88534485 1 J.3.A55EtrIATE nNLHTSCT TNTERIOR DESIGNER & VALUER *r"it, lO"nOassociatel @gmail'com FORM { [see Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account) DATE 13.04.2025 To M/s. Vikas DeveloPers, Shri Dnyanesh Arcade,CTS No.20310 I 4, Samarth Nagar,Aurangabad. subject: certificate of Percentage of completion of construction work of sAI SHRADDHA PARK-BUILDING A" , having Maha RERA Registration Number P51500016458 being developed by Vikas Developers Percentage of I R.s.Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying completion of construction work of sAl SHRADDHA PARK BUILDING A having MahaRERA Registration Number P51500016468. Being developed by vikas Developers Real Estate Project' I Based on Site inspection. with respect to Layout / each of the of the aforesaid certify that as on the date of this certificate, the Percentage of work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below' percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table ' ,ABIE-A Layout / Building Wing Numbe r-(To be prepared separately for each Layout building/Wing of The P Tasks / Activity Percentage of Actual Work Done Sr (2) (As on date of this No (1) Certificate) (3) t00% t. Excavation 100% 2. Basement's 3 ums 100% 4. Plinth 100% 5. Stilt Floor L00% 6. of re walls, lnterna I Plaster, Floorings, l) doors and windows t00% 7 lnternal within within the 700% 8 San 100% 9 Staircases. lifts'Wells and Lo,bbies at each Floor level Overhead and U nd Water Tanks L00% L0 External plumbing and external plaster, e levation, comPletion of terraces with ofthe Bui i? tt lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 100% NOC. Finishing to entrance lobbyls. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Propose Percentage of Actual Details No (21 d Work Done (1) (Yes/No (4) (s) ) (3) 1. lnternal Roads & Footpaths NO NA NA 2 Water SupplV YES 700% WORK COMPLETED 3 Sewerage (Chamber, lines, YES L00% WORK COMPLETED Septic Tank, STP). 4. Storm Water Drains NO NA 5 Landscaping & Tree Planting YES 700% WORK COMPLETED 6 Street Lighting YES 700% WORK COMPLETED 7 Community Buildings NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposai 10 Water conservation / Rain water YES 100% WORK COMPLETED harvesting 11 Energy management. NO NA 72 fire protection and lire Safety NO NA NA requirements 13 Electrical meter room, sub- NO NA NA * station, receiving station. t{; t4 Otherq (O0tion to Add more) F.i {,{ lr .............) Ag nd Accepted Signature of Promoter Name: Date: