R.S. JADHAV ARCHITECT cIc, A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA, STADIUM SUTEINNI CHOWK, GARKHEDA, AURANGABAD' 431005 COf.rfnCr : +91 .240 - 2983017' M.: e-mait : jbandassociatel @gmail.com 9370591'198, INDIA 7588534485 J:$A55oE IATE ARCHITECT INTERTOR DESIGNER & VALUER FORM 1 [See Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 10.10.2024 To M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.2031O / 4, Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI SHRADDHA PARK BUILDING A" , having Maha RERA Registration Number P51500016468 being developed by Vikas Developers I R.S.Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI SHRADDHA PARK BUILDING A having MahaRERA Registration Number P51500016458. Being developed by Vikas Developers Based on Site inspection. with respect to Layout / each of the of the aforesaid Real Estate Project' I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Number-(To be prepared separately for each Layout building/Wing of The P Sr Tasks / Activity Percentage of Actual Work Done No (21 (As on date of this (1) Certificaie) (3) t. Excavation 100% ) Basement's (if any) t00% 3. Podiums if 4. Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 700% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and windows n0% within Flats/Premises 8 San Fittin within the L00% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead 700% and Underground Water Tanks 10 External plumbing and external plaster, elevation, com pletion 100% of terraces with waterProofing of the Building/wing. tt lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 100% NOC. Finishing to entrance lobbyls. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to compiete project as per specifications in agneement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered phase/project Number Sr Common areas and facilities Propose Percentage of Actual Details No (21 d Work Done (1) (Yes/No (4) (s) ) (3) 1. lnternal Roads & Footpaths NO NA NA 2 Water Supply YES 700% WORK COMPLETED 3 Sewerage (Chamber, lines, YES 700% WORK COMPLETED Septic Tank, STP). 4. Storm Water Drains NO NA 5 Landscaping & Tree Planting YES 700% WORK COMPLETED 6 Street Lighting YES 700% WORK COMPLETED 7 Community Buildings NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 700% WORK COMPLETED harvesting 17 Energy management. NO NA 72 fire protection and lire Safety NO NA NA requirements 13 Electrical meter room, sub- NO NA NA station, receiving station. t4 jqfu;fj-option to Add more) ect by: x Signature of Promoter Name: Date: I "/-<)