N.G. Karkhane B.E. (Hons.)(Pilani), M.Tech., (lll Mum), F.l.E., F.l.V., MISSE, MVlrUrA, MACI (USA) .3. Consult ing Civil Engineerl' Structural Designer .!. Government Registered Propert! Valuer (CAT l-474) (o) 0240-2452305 (p) 2485153 * Structural Auditor, '!' Chartered Engineer (F-11017-15) (M)9823028081 'MOGRA' Rana Nagar, Opp. Hotel Atitf$R#fna Road, Aurangabad - 431003. E -m a i I : n g k+rl*effi,@$rngi l.com ENG!NEER'S CERTIFICATE (To be submitted at the tirne of Registration of Ongoing Project and for withdrawal of Money from Designated. account - Proteet Wise) Date: 10.04.2023 To Vikas Developers - cTS NO.20310/4 Shri Dnyanesh Arcade, Samarth Nagar, Aurangabad Subject: certificate of cost [incurred for Development of sAt SHRADDHA PARK BUtLtDtNG A having MahaRERA Registration Number P51500015468 being developed by VTKAS DEVELOpERS Sir I N.G.Karkhane have undertaken assignment of certifying Estimated Cost for having SAt SHRADDHA PARK BUIIIDING A MahRERA Registration Number P51500016468 being developed by Vikas Developers 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specific actions mentioned in attachment of sale. Our estimated cost calculations are based on the available made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity surveyor* appointed by Developer Engineer, The assumption to the cost of material. Labour and other inputs mad by developer. And the site inspection carried out by us to ascertain / confirm the above analysis given to us. a 3. We estimate Total Estimated Cost of' completion of the aforesaid project under reference at Rs.2,52,03,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of Project is with references to the Civil, MUP and Allied works required for completion of the apartments and Proportionate complication of internal external works. As per specifications mentioned in agreement of sale and For the purpose of obtaining occupation certificate /completion certificate for the Building(s) / Wing(s) r Layout / Plotted Development from the being the Planning Authority'under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred tilldate is calculated at Rs.2,62,03,000/- (Totalof Table A and B)the amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of this items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and Completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs.2,62,03,000/- (Total of Table A and B) 5. N certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate and internal & External works, as per specifications mentioned in agreernent of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table A and B) below: TABTE-A Building lWine/ Layout / Plotted Development bearing Number or called_ (To be prepared separately for each building /Wing / layout /Plotted Devel opment of the Real Estate P Sr.no Particulars Amount (in Rs.) L Total estimated Cost of the Building/Wing / Layout / Plotted Rs.2,62,03,000/- Development as on date of Registration is 2 Cost lncurred as on date of' certificate 31.03.2023 Rs.2,62,03,000/- 3 Work done in Percentage (as Percentage of the estimated cost) 100% 4 Balance Cost to be incurred** (Based on Estimated Cost) Rs.4,01,,097 /- 5 Cost lncurred on Additional/Extra items not included in the NIL Estimated Cost (Table -C) 31.03.2023 TABTE-B lnternal & External Deve ent inR of the red Phase Sr Particulars Amount (in Rs.) No 1 Total Estimated Cost of the lnternaland External Development N!L Works including amenities and Facilities in 2 Cost incurred as on date of certificate NIL 3 Work done in Percentage (as Percentage of the estimated cost) NIL 4 Balance Cost to be incurred** (Based on Estimated Cost) NIL 5 Cost lncurred on Additional /Extra items not included in the N!L Estimated Cost (Table -C) 1:r,:. f:ir:? ignature of i:r:qtnner Agreed and Accepted by: Signature of Promoter Name: VIKAS L.CHAUDHARY Date: (] Note 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in c'ase quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (") 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred to be incurred, 5. Allcomponents of work with specifications are indicative and not exhaustive 6. Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE.C List of Extra/Additional/ Deleted ltems considered in Cost (which were not part of the original Estimate of Total Cost) Sr.no Particulars Amount (ln Rs.) 1 2