N.G. Karkhane B.E. (Hons.)(Pilani), M.Tech., (llT, Mum), F.l.E., F.l.V., MISSE, MWWA, MACI (USA) {. Consulting Civil Engineer {.Structural Designer .i. Government Registered Propert! Valuer (CAT l-474) (o) 0240-2452305 ( p) 24851 53 .!. Structural Auditor, €. Chartered Engineer (F-11017-15) (M)9823028081 Rana Nagar, Opp. Hotel AtitSR{Aha Road, Aurangabad - 431003. E -m a i I : n g kqrfJraas(Bgrnri l. co m ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated. account - protect Wise) -'MOGRA' To Date:10.04.2022 Vikas Developers - cTS NO.20310/4 Shri Dnyanesh Arcade, Samarth Nagar, Aurangabad subject: certificate of cost [incurred for Development of sAt SHRADDHA PARK BUILID|NG A having MahaRERA Registration Number P51500016468 being developed by VTKAS DEVELopERS Sir I N.G.Karkhane have undertaken assignment of certifying Estimated Cost for having SAI SHRADDHA PARK BUILIDING A MahRERA Registration Number P515OOO164G8 being developed by Vikas Developers 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specific actions mentioned in attachment of sale. our estimated cost calculations are based on the available made available to us for the project under reference by the Developer Consultants. The / Schedule of items and quantity required for the entire work as calculated by euantity surveyor* appointed by Developer Engineer. The assumption to the cost of material. Labour and other inpuis mad by developer. And the site inspection carried out by us to ascertain confirm the above analysis given / to us. 3. We estimate Total Estimated Cost of' completion of the aforesaid project under reTerence at Rs.2,52,03,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of Project is with references to the Civil, MUP and Allied works required for completion of the apartments and Proportionate complication of internal external works. As per specifications mentioned in agreement of sale and For the purpose of obtaining occupation certificate /completion certificate for the Building(s) / wing(s) r Layout / plotted Development from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 2,62,03,OOol- (Total of Table A and B) the amount of Estimated cost incurred is calculated on the basis of input materials/services used and unit cost of this items. 5' The Balance cost of completion of the Civil, MEP and Allied works for completion of the apartments and Completion of internal & external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.2,G2,03,0001- (Total of Table A and B) 6' I certify that the cost of the civil, MEP and allied work for the apartments and proportionate and internal & External works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table A and B) below: TABLE-A Building /Wine/ Layout / plotted Development bearing Number_ or called_ (To be prepared separately for each building /wing / layout /plotted Devel opment of the Real Estate P Sr.no Particulars Amount (in Rs.) t Totalestimated Cost of the Building/Wing / Layout / plotted Rs.2,62,03,000/- ment as on date of IS 2 Cost lncurred as on date of,certificate 31.03.2 022 Rs.2,62,03,00O/- 3 Work done in as of the estimated cost) 100% 4 Bala nce Cost to be I ncu rred* :* ( Bas ed on Estimated Rs.4,OL,O97/- 5 Cost Incurred on Addit ional/Extra items not included in the NIL Estimated Cost le -C) 31.03.2022 TABLE.B lnternal & External Devel ent Works in of the red Phase Sr Particulars Amount (in Rs.) No 7 Total Estimated Cost of the lnternal and External Development NIL Works includin amenities and Facilities in 2 Cost incurred as on date of certifi cate NIL 3 Work done in as Pe of the estimated NIL 4 Bala nce Cost to be incurred * ,. Bas ed o n Est imate d Cost) Nlt 5 Cost lncurred on Additional/Extra items not included in the NIL Estimated Cost ble Y*rr$ iU " tr,,";. :1:t;iil iq*atr.:r* *f i:tq in iner Agreed and Accepted by: romoter (,(r fl Name ARY Ir,lote: 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (-) Quantity survey can be done by office of Engineer or can be done by an independent euantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer" ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (") 3. (**) Balance Cost to be incurred (a) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this an estimated cost, any deviation in quantity required for development of the Real Estate project will result in amendment of the cost incurred to be incurred. 5. All components of work with specifications are indicative and not exhaustive 6. Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted ttems considered in Cost (which were not part of the original Estimate of Total Cost) Sr.no Particulars Amount (ln Rs.) L 2