R.S. JADHAV ARCHITECT A.306. CITIUS, SPACE OLYMPIA, NEAR GARKHEOA, STADIUM STTTGRNI CHOWK. GARKHEDA, AURANGABAD . 4 3 1 OO5 INDIA CONTACT : +91.240 - 2983017, M.: 9370591198, 7588534485 e-mail : jbandassociatel @gmail.com J.3.AssffiffilATE ARCHITECT INTERIOR DESIGNER & VALUER FORM 1 [see Regulation 3l (ro be submitted at the time or *I:U::,%:q:[[TIJ,:illo withdrawar or Money rrom Designated Account) ". To DATE 10.04.2022 M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.ZO3I:O 4, / Samarth Nagar,Aurangabad. Subject: certificate of percentage of completion of construction work of sAI SHRADDHA PARK BUILDING A", having Maha RERA Registration Number P51500016468 being developed by Vikas Devetopers I R's'Jadhav have undertaken assignment as Architect /Licensed surveyor of certifying percentage of Completion of Construction work of sAt SHRADDHA PARK BUILDING A r,rrine MahaRERA Registration Number E!5000r!g!68. being deveroped by Vikas Deveropers Based on site inspection. with respect to Layout / each of the of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate Project under Maha nrnn is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABTE-A Layout / Building Wing Number_ (To be prepared separately for each Layout building/Wing of The Sr Tasks / Activity Percentage of Actual Done No (21 (As on date of this (1) Certificate) 1. Excavation 100% 2 Basement's 100% 3. Podiums 4. Plinth 100% 5. Stilt Floor 100% 6 Slabs of er Structure 100% 7 nterna walls, lnterna Plaster, FI oorings, r) doors and windows 100% withi n 8 San within the 100% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead 100% and U nd Water Tanks 10 Extern plu mbing and extern plaster elevati OD, completion 100% of terraces with of the Bu itd 71. lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmentlcRz toj% NOC. Finishing to entrance lobby/s" plinth protection, paving of areas appurtenant to BuildinglWing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Propose Percentage of Actual Details No (2) d Work Done {1) (Yes/No (4) (s) ) (3) t lnternal Roads & Footpaths NO NA NA 2 Water Supply YES 700% WORK COMPLETED 3. Sewerage (Chamber, lines, YES 700% WORK COMPLETED Septic Tank, STP). 4. Storm Water Drains NO NA 5. Landscaping & Tree Planting YES 100% WORK COMPLETED 6. Street Lighting YES 700% WORK COMPLETED 7 Community Buildings NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 100% WORK COMPLETED harvesting 77 Energy management. NO NA 72 fire protection and lire Safety NO NA NA requirements 13 Electrical meter room, sub- NO NA NA station, receiving station. 74 Other..(O-ption to Add more) by; t".:', Signature of P \, Name:VIKAS l(,} Date: