R.S. JADHAV ARCHITECT A-306, ClTlUS, SPACE OLYMPIA, NEAR GARKHEDA; STADIUII 'duieiCnl crrbwx, GARKHEDA, AURANGABAD - 43100s lNDlA CoHinCi : +91.240 ' 2983017' M.: 9370591198, 7588534485 J.3.A55 ARCHITECT INTERIOR DESIGNER & VALUER IATE e-mail : jbandassociatel @gmail.com FORM 1 [See Regulation 3l ARCHITECT'S CERTIFIGATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 10.O7.2024 To M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.ZO3LO / 4, Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI SHRADDHA PARK BUILDING A" , having Maha RERA Registration Number P51500016458 being developed by Vikas Developers I R,S.Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI SHRADDHA PARK BUILDING A having MahaRERA Registration Number P51500016458. Being developed by Vikas Developers Based on Site inspection. with respect to Layout / each of the of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below' percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Number_ (To be prepared separately for each Layout building/Wing of The Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) (3) 7. Excavation 700% 2 Ba S anv) 100% 3. Podiums (if any) 4. Plinth L00% TOOo/o 5. Stilt Floor 6, Slabs of Super Structure L00% 7 lnternal walls, lnternal Plaster, Floorings, l) doors and windows t00% within Flats/Premises 8 Sanitary Fittings within the Flat/Prem tses t00% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead t00% and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion 100% of terraces with waterProofing of the Building/wing. 1_L lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ LOo% NOC. Finishing to entrance lobbyls. plinth protection, paving of areas appurtenant to BuildinglWing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Saie. Any other activities. TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Propose Percentage of Actual Details No (2) d Work Done (1) (Yes/No (4) (s) ) (3) 7. lnternal Roads & Footpaths NO NA NA 2. Water Supply YES 700% WORK COMPLETED 3. Sewerage (Chamber, lines, YES 100% WORK COMPLETED Septic Tank, STP). 4, Storm Water Drains NO NA 5. Landscaping & Tree Planting YES 100% WORK COMPLETED 6. Street Lighting YES 700% WORK COMPLETED 7 Community Buildines NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 700% WORK COMPLETED harvesting 77 Energy management. NO NA 72 fire protection and lire Safety NO NA NA requirements 13 Electrical meter room, sub- NO NA NA station, receiving station. t4 Pttt{6{E:!isn to Add more) You llv, :::' k Agreed an ed by: fl Signature of Promoter \ i, / Name: Date: