'i R.S. JADHAV ARCHITECT trro A.306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA, STADIUM SUTGIRNI CHOWK. GARKHEDA, AURANGABAD . 431 OO5 INDIA CONTACT: +91.240 - 2983017, M.: 9370591198, 7588534485 e-mail : jbandassociatel @gmail.com J.3.A55trEIATE ARCHITECT TNTERIOR DESIGNER & VALUER FORM 1 [see Regulation 3l ARCHITECT'S CERTIF!CATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 1 1.04.2023 To M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.203 10/4, Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI SHRADDHA PARK BUILDING A" , having Maha RERA Registration Number P51500015468 being developed by Vikas Developers I R.S.Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI SHRADDHA PARK BUILDING A having MahaRERA Registration Number P51500015458. being developed by Vikas Developers Based on Site inspection. with respect to Layqut / each of the of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABTE-A Layout / euilding Wing Numbe (To be prepared separately for each Layout building/Wing of The P Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (r) Certificate) (3) t. Excavation L00% 2. Basement's (if any) LOj% 3. Podiums (lf any) 4. Plinth t00% 5. Stilt Floor t00% 6. Slabs of Super Structure 700% 7 lnternal walls, lnternal Plaster, Floorings, l) doors and windows t00% within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead 100% and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion 100% of terraces with waterproofing of the Building/wing. tt lnstallation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 100% NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as pen specifications in agreement of Sale. Any other activities. TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Propose Percentage of Actual Details No (2) d Work Done (1) (Yes/No (4) (s) ) (3) t lnternal Roads & Footpaths NO NA NA 2 Water Supply YES 700% WORK COMPLETED 3 Sewerage (Chamber, lines, YES 700% WORK COMPLETED Septic Tank, STP). 4 Storm Water Drains NO NA 5 Landscaping & Tree Planting YES 100% WORK COMPLETED 6 Street Lighting YES too% WORK COMPLETED 7 Community Buildings NO NA 8 Treatment and disposal of NO NA sewage and sullage water. 9 Solid Waste management & NO NA Disposal 10 Water conservation / Rain water YES 700% WORK COMPLETED harvesting t7 Energy management. NO NA t2 fire protection and lire Safety NO NA NA requirements 13 Electrical meter room, sub- NO NA NA station, receiving station. 74 Oth ers (O pJiran"tq,rACLd more) Your's Fait i ,',, t '' l.' ' , sie (License Agreed and Signature of Promoter Name: \ \ () * tt Date: iI