Archipel Architects hl Architects, Plonners, lnterior Designers o"' o';i[:I;.HT s o bod li:;f i r;:.,l,'#n Ar.Kopil Guirothi REGULATIONS FORM I [see RegLrlation 3] ARCHITECT'S CER'|IFICATE (To be suhmitted at the time u,ithdrarval Monev f}om Desigrrated Account- Building/Wing wisc) Date: l9r03rl0l0 Bhagchand Suganchand Jain H No 3- l-3, Kamal Sugnad Niwas. Kahrakuwa, Aurangabad. Subject: Certificate of Completion of Construction Work of_ Project Mangal Kalash, Wing A and B the Building of the project situated on the Gut No. 267|p, Mitmita demarcated by its boundaries East : Nala West : Roatl South : Iand Gut No. 267 Part Mitmita North: Aurangabad Nasik Road, of Division Aurangabad village Mitmita Taluka & District Aurangabd PIN. 431007 admeasuring 1700 sq.mts. Plot area being developed by Bhagchand Suganchand Jain RIRA Registration No. P51500020624 Sir. I Abhay Jaipurkar have undertaken assignment as Architect /Licensed Surveyor of certifying Cornpletion of Construction Work Project Mangal Kalash, Wing A and B the Building of the project situated on the Gut No. 267ip, Mitmita demarcated by its boundaries East : Nala West : Road South : land Gut No. 267 Part llitmita \orth: Aurangabad \asik Road. of Division Aurangabad village Mitmita l'aluka & District Aurangabd PIN. 431007 admeasuring 1700 sq.mts. Plot area being developed by Bhagchand Suganchand Jain RERA Registration No. P51500020624 2. Following technical prof.essionals are appointed by Owner / Promoter :- i) Mr. Kapil Gujrathias L.S. / Architect : ii) M/s. lkon Consultant as StructuralConsultant Based on Site Inspection, with respect to each of the Building/Wing of the afbresaid Real l:stat Project, I certify that as on the date of this certificate. the Percentage of Work done lbr each of the building/Wing of the Real Estate Project as registered vide number P51500020624 Lrnder RERA is as per table herein below. The percentage of the work executed with respect to each of the major activity o1'thc Win-e A B and Overall Percentage of work done with respect Mangal Kalash Wing A and B is detailed in the Table A and B. Table A Wing A and B (to be prepared for the "Mangal Kalash") Sr. No Tasks iActivity Percentage ofwork done 1 Excavation 100 I llrnrbl'r rrl Bascnrertt(s ) and 100 3. Plinth 100 4 0 number of Podiums N-A 5 Stilt Floor 100 6 5 number of Slabs of Super Structure 100 7 Internal walls 100 8 The external walls 100 9. Common Areas. Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certitrcate 100 REGULATIONS TABLE- B Internal & Erternal Development \\'orks in Respect of the entire Registered Phase Sr. No. Cornmon areas and Facilities. Proposed Percentag Details Arnenities (Yes,No) e of Work 1 Internal Roads Yes 100% Internal Project & Footpaths Roads Only 2. Water Supply Yes 100% Bore-rvell J. Sewerage (chamber, lines, Yes 100% Connected to Senfin TanL STP'\ T)rainaoe I ine 4. Storm Water Drains N/A 5. Landscaping & Tree Plantation Yes 100 For Internal project 6. Street Lighting Yes 100% Internal Project 7. Community Buildings N/A 8. Treatrnent and disposal of N/A sewage water 9. Solid Waste management & N/A 10. Water conservation. Rain Yes 1 00% Rain Water water harvesting Harvesting Completed As per 11 Energy management N/A t2. Fire protection and fire NA NA safety requirements 13. Electrical meter room. NA NA 14. Others ( Option to Add rnore) N/A