Arch. Ganesh Mharolkar SPACE CA/2001/27254 203,2nd floor, Shankar Plaza, SahakarNagar Chowk, Architects Interior Designers Opp Bank of Baroda,Dargah Road, Chh.Sambhaji Nagar. 431005. Ph: 0240 2970299 Cell: 94231 49144. EMail: spacear203@gmail.com. FORM 1[See Regulations 3] ARCHITECT'S CETIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of money from Designed Account- Building/ Wing wise) Date: To, MIS Shriraj Labh Developer. Labh Chambers, Station Road, Aurangabad. Subject: Certificate of Percentage of Completion of Construction work of Residential Building of the project "Shriraj - Labh SURYATEJ RESIDENCY" (RERA Regulation Number: NEW APPLICATION) situated on plot Gut no. 107(P), Mitmita, Aurangabad demarcated by its boundaries North: Existing Nalah. South: NH 211 60.00 mwide Nashik Aurangabad Road. East: Existing Nalah. West: 9.00 M. wide Common Road. Division AURANGABAD, Village AURANGABAD, taluka AURANGABAD, District AURANGABAD, Pin 431001, admeasuring 3646.23 Sq. Mtrs. Area being developed by M/s. Shriraj Labh Developer. Sir, | Ganesh Mharolkar have undertaken assignment as an Architect of Certifying Percentage of Completion of Construction Work of the Residential Buildings of the of the project "Shriraj -Labh SURYATEJ RESIDENCY" of Division AURANGABAD, Village AURANGABAD, taluka AURANGABAD, District AURANGABAD, Pin 431005, admeasuring 3646.23 Sq. Mtrs. Area being developed by Mis. Shriraj Labl1 Developer. 1. Following technical professionals are appointed by Owner/ Promoter: () Shri GANESH MHAROLKAR as an Architect; (ü) Shri Rajesh B. Vargantwar as Structural Consultant. (ii) Shri as Plumbing Consultant. (iv) Shri Sukhdeo as site supervisor. Based on Site Inspection, with respect to each of the Building/ Wing of the aforesaid Real Estate project, Icertify that as on the date of this certificate, the Percentage of work done for each of the building/ Wing of the Real Estate Project as registered vide number NEW PROJECT APPLICATION under RERA is as per table Aherein below. The percentage of the work executed with respect to each of the major activity of the Building and Overall Percentage of work done with respect to each Building/ Wing is detailed in the Table B. Yours faithfully GANESH MHAROLKAR Ganesh Mharolkar Architect ARCHITECT (CA2001/27254) CA/2001/27254 TABLE A Building "A (Residential / Commercial) 01 Building (To be prepared separately for each Building/ Wing of the Project) Sr. No. Tasks/ Activity Percentage of Work Done 1. Excavation 100 2. 1Number of Plinth 100 3 0 Number of Podiums NA 4 1Stilt Floor 100 5 05 Numbers of Slabs of Super Structures. 100 6 Internal Walls, Internal Plaster, Floorings within Flats/ 100 Premises, Doors and Windows to each of the Flat/ Premises 7. Sanitary Fittings within the Flat Premises, 100 Electrical Fittings within the Flat/ Premises 8 Staircase, Lifts Wells and Lobbies at each Floor level 100 Connecting Staircase and Lifts, Overhead and Underground Water Tanks 9 The External Plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the building/ wing, 10. Installation of lifts, water pumps, fire Fighting Fitings and 100 Equipment as per CFP NOC, Electrical fittings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment/ CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ VWing, Compound wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate. TABLE A Building '®" (Residential) 01Building (To be prepared separately for each Building/ Wing of the Project) Sr. No. Tasks/ Activity Percentage of Work Done 1 Excavation 100 2 1Number of Plinth 100 3 0 Number of Podiums NA 4 1 Stilt Floor 100 5 04 Numbers of Slabs of Super Structures. 100 6. Internal Walls, Internal Plaster, Floorings within Flats/ 100 Premises, Doors and Windows to each of the Flat/ Premises 7 Sanitary Fittings within the Flat/ Premises, 100 Electrical Fittings within the Flat/ Premises 8 Staircase, Lifts Wells and Lobbies at each Floor level 100 connecting Staircase and Lifts, Overhead and Underground Water Tanks 9 The External Plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the building l wing, 10. Installation of lifts, water pumps, fire Fighting Fittings and 100 Equipment as per CFP NOC, Electrical fitings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment/ CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ Wing, Compound wall and allother requirements as may be required to Obtain Occupation/ Completion Certificate. TABLE A Building "C (Residential) 01 Building (To be prepared separately for each Building/ Wing of the Project) Sr. No. Tasks/ Activity Percentage of Work Done 1 Excavation 100 2 1 Number of Plinth 100 3 0Number of Podiums NA 4 1 Stilt Floor 100 5 04 Numbers of Slabs of Super Structures. 100 6 Internal Walls, Internal Plaster, Floorings within Flats/ 100 Premises, Doors and Windows to each of the Flat/ Premises Sanitary Fittings within the Flat/ Premises, 100 Electrical Fittings within the Flat/ Premises 8 Staircase, Lifts Wells and Lobbies at each Floor level 100 connecting Staircase and Lifts,Overhead and Underground Water Tanks 9. The External Plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the building / wing, 10 Installation of lifts, water pumps, fire Fighting Fittings and 100 Equipment as per CFP NOC, Electrical fitings to Common Areas,Electro, Mechanical equipment, Compliance to conditions of environment/ CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ Wing, Compound wall and allother requirements as may be required to Obtain Occupation/ Completion Certificate. lam TABLE A Building "D" (Residential) 01 Building (To be prepared separately for each Building/ Wing of the Project) Sr. No. Tasks/ Activity Percentage of Work Done 1. Excavation 100 2 1Number of Plinth 100 3 0 Number of Podiums NA 4 1Stilt Floor 100 5 04 Numbers of Slabs of Super Structures. 100 6 Internal Walls, Internal Plaster, Floorings within Flats/ 100 Premises, Doors and Windows to each of the Flat/ Premises Sanitary Fittings within the Flat/ Premises, 100 Electrical Fittings within the Flat/ Premises 8 Staircase, Lifts Wells and Lobbies at each Floor level 100 Connecting Staircase and Lifts, Overhead and Underground Water Tanks 9. The External Plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the building / wing, 10 Installation of lifts, water pumps, fire Fighting Fittings and 100 Equipment as per CFP NOC, Electrical fitings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ Wing, Compound wal and all other requirements as may be required to Obtain Occupation/ Completion Certificate. TABLE A Building "E (Residential) 01 Building (To be prepared separately for each Building/ Wing of the Project) Sr. No. Tasks/ Activity Percentage of Work Done 1 Excavation 100 2 1Number of Plinth 100 3 0 Number of Podiums NA 4 1Stilt Floor 100 5 04 Numbers of Slabs of Super Structures. 100 6 Internal Walls, Internal Plaster, Floorings within Flats/ 100 Premises, Doors and Windows to each of the Flat/ Premises 7. Sanitary Fittings within the Flat/ Premises, 100 Electrical Fitings within the Flat/ Premises 8 Staircase, Lifts Wells and Lobbies at each Floor level 100 connecting Staircase and Lifts, Overhead and Underground Water Tanks 9. The External Plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the building / wing. 10. Installation of lifts, water pumps, fire Fighting Fittings and 100 Equipment as per CFP NOC, Electrical fittings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ Wing, Compound wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate. TABLE B Internal and External Development Works in the respect of the entire Registered Phase Sr Common Areas and Facilities Proposed Percentage of Details Amenities (Yes/ No) Work Done 1 Internal Road &Footpaths NO 00 NA 2 Water Supply YES 100 3 Sewerage (Chamber, Lines, Septic YES 100 Tank, STP) 4 Storm Water Drains NO 00 NA 5 Landscaping &Tree Planting YES 100 6 Street Lighting NO 00 NA 7 Community Buildings NO NA NA 8 Treatment and disposal of sewage NO NA NA and sullage water Solid Waste Management &DisposalNO NA NA 10 Water conservation, Rain Water YES 100 harvesting 11 Energy Management NO NA NA 12 Fire protection and fire safety NO NA NA requirements 13 Electrical meter room, sub-station, NO NA NA receiving station 14 Others (Option to Addmore) Yours faithfully GANESH MHAROLKAR Ganesh Mharolkar Architect ARCHITECT (CA2001/27254) CA/2001/27254