N.G. Karkhane B.E. (Hons.)(Pilani), M.Tech., (lll Mum), F.l.E., F.l.V., MISSE, MWWA, MACI (USA) .t Consulting Civil Engineer {'Structural Designer (ol0240-245230s r'. Government Registered Propert! Valuer (CAT l-474) (p) 2485153 * Structural Auditor, * Chartered Engineer (F- 11017-15) (M)9823028081 'MOGRA' Rana Nagar, Opp. Hotel Atithi, Jalna Road, Aurangabad - 431003. E-mai t : ngkarlilffile@gmail.com [. See Regulation 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated. account - Protect Wise) Date:09.01.2023 To - Vikas DeveloPers crs No.20310/4 Shri Dnyanesh Arcade, Samarth Nagar, Aurangabad SPARSH having MahaRERA Registration subject: certificate of cost [incurred for Development of sAl NumberP51500016434beingdevelopedbyVIKASDEVELoPERS Sir Estimated cost for having sAl SPARSH I N.G.Karkhane have undertaken assignment of certifying MahRERA Registration Number P51500016484 being developed by Vikas Developers required for completion of the 2. We have estimated the cost of civil, MEP and allied works external works of the project as per specific apartments and proportionate completion of internal & cost calculations are based on the available actions mentioned in attachment of sale. our estimated made available to us for the project under reference by the Developer / consultants' The schedule by Quantity surveyor* appointed by of items and quantity required for the entire work as calculated material. Labour and other inputs mad by Developer Engineer. The assumption to the cost of developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of' completion of the aforesaid project under reference at Rs.25148350/- (Total of Table A and B) at the time of Registration' The estimated Total cost of of the project is with references to the civil, MUP and Allied works required for completion external works' As per specifications apartments and Proportionate complication of internal purpose of obtaining occupation certificate mentioned in agreement of sale and For the wine(s) r Layout / Plotted Development from the being /completion certificate for the Building(s) / project is being implemented' the planning Authority under whose jurisdictionihe aforesaid 4. The Estimated cost lncurred till date is calculated at Rs. 25148350 (Totalof Table A and B)the amount of Estimated cost incurred is calculated on the basis of input materials/services used and unit cost of this items. MEP and Allied works for completion of the 5. The Balance cost of completion of the civil, works, as per specifications mentioned in apartments and completion of internal & external Rs.o/- (Total of Table A and B) agreement of sale, of the Project is estimated at 6' I certify that the cost of the civil, MEP and allied work for the apartments and proportionate and internal & External works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table A and B) below: TABLE.A Bui lding /Wing/ Layout / plotted Developme nt bearing Number_ or called_ (To be prepared separately for each building /Wing / layout/plotted Development offie Real Estate Pro Sr.no Pa rticu la rs Amount (in Rs 1, Total estimated Cost of the Building/Wing Layout ptotted / / Rs.2,51,48350/- Development as on date of Registration is 2 Cost lncurred AS o n date of' certifi c a te 3 t/ L2/2 2 Rs.2,51,48,35 o/- 3 Work done in perce (as Percenta of the estimated cost L00% 4 Ba la nce Cost to b e n c u rred ,. * (Ba SC d o n Estima ted Cost Rs.35,59,652/- 5 Cost lncurred on Additional /Extra items not included in the NIL Estimated Cost ble -C 31.12.2022 TABLE-B lnternal & External Develo ment Works in ect of the istered Phase Sr Particula rs Amount (in Rs.) No 1 Tota Esti m ate d Cost of th e n te rn a I a n d Exte rna Deve lopmen t Nrt W,o rks n c ludi m e n iti es a n d Facil ities in 2 Cost rn cu rred as o n d te of certifi cate NIL 3 Work done in (as Perce of the estimated Ntt 4 Ba a nce Co st to be nc u rred * Based on Est ima ted Co ,t( Ntt 5 Cost lncurred on Additional Extra items not included in / the Ntt Estimated Cost le !y :{i t r;rt: t.l i ti.': t:.:ti' ):: : 1r'. \ t t'.;::t- f Agreed and Accepted by: Signature of Promoter Name Date Note 1 The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2'(-) Quantity survey can be done by office of Engineer or can be done by an independent euantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (") 3'(**) Balance Cost to be incurred (a) may vary from Difference between Total estimated Cost (L) and Actual Cost incurred (2) due to deviation in quantity required escalation / of cost etc. As this an estimated cost, any deviation in quantity required for development of the Real Estate project will result in amendment of the cost incurred to be incurred. 5. All components of work with specifications are indicative and not exhaustive 6' Please specify if there are any deviations qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE.C List of Extra/Additional/ Deleted ltems considered in Cost (which were not part of the original Estimate of Total Cost) Sr.no Pa rticula rs Amount ln Rs. t 2