R.S. JADHAV ARCHITECT A.306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA, STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD . 431005 INDIA CONTACT: +91.240 - 2983017, M.: 9370591198, 7s88534485 e-mail : lbandassociatel @gmail.com ,.3.A55 c]EIATE ARCHITECT INTERIOR DESIGNER & VALUER lsee Regulation 3l ARCH ITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE07.04.2022 To M/s. Vikas Developers, Shri Dnyanesh Arcade,CTS No.203 10/4, Samarth Nagar,Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of SAI SAI SPARSH, having MahaRERA Registration Number P51500006453 being developed by Vikas Developers I R.S.Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of SAI SPARSH having MahaRERA Registration Number P51500015484. being developed by Vikas Developers Based on Site inspection. with respect to Layout / each of the of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A Layout / Building Wing Number_ (To be prepared separately for each Layout building/Wing of The P ect) Sr Tasks / Activity Percentage of Actual Work Done No (2) (As on date of this (1) Certificate) (3) t. Excavation 100% 2. Basement's (if any) t00% 3. Podiums (if any) 4. Plinth t00% 5. Stilt Floor 10Oo/o 6. Slabs of Super Structure 100% 7 lnternalwalls, lnternal Plaster, Floorings, l) doors and windows 100% within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases. lifts' Wells and Lobbies at each Floor level Overhead LOO% and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion L00o/o \,. of terraces with waterproofing of the Building/wing. l\ ':* $x { ,-| .4;r !l - .'1">:'." ril: 11 lnstallation of Lifts water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ 100% NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B common Areas (lnternal and External Development works) in respect of the Registered phase/project Number Sr Common areas and facilities Propose Percentage of Actual Details No (21 d Work Done (1) (Yes/No (4) (s) ) (3) t lnternal Roads & Footpaths NO NA NA 2. Water Su YES 700% WORK COMPLETED 3. Sewerage (Chamber, lines, YES 700% WORK COMPLETED c Tan sTP). 4 Storm Water Drains NO NA 5. Landsca & Tree Planti YES 700% WORK COMPLETED 6. Street Lighting YES 100% WORK COMPLETED 7 Community Build NO NA 8 Treatment and disposal of NO NA and sulla water. 9 Solid Waste management & NO NA Di al 10 Water conservation / Rain water YES 700y WORK COMPLETED 1_1_ En ma ment. NO NA t2 fire protection and lire Safety NO NA NA irements 13 Electrical meter room, sub- NO NA NA station, receiving station. t4 Others on to Add more ,J""t t/ Your's Fa P\ Signature & Architect (License No. .............) Agreed and Accepted by: Signature of Promoter Name: Date: