Form 1 ARCHITECT'S CERTI FICATE (To be submitted at the time withdrawal Money from Designated Account- Building/Wing wise) Date: 3Ut2l20t9 To,TheABConstro Jubilee Park, Bhadkal Gate, Aurangabad. Maharashtra Subject: Certificate of Completion of Construction Work of pERVEZ MANJIL Building, the Building of the project situated on the Plot No.14 CTS no. 11352, VIp Road lubilee Park, Aurangabad, demarcated by its boundaries East : plot No 21 West: 20 Ft Wide Road South : Plot No 13 North: Plot No. 15, Situated at S T Colony of Division Aurangabad village Aurangabad Taluka & District Aurangabad plN, 431001 admeasuring 335.8 sq.mts. Plot Area being developed by A B Constro, RERA Registration No. P51500018870 Sir, I Shaikh Sohel Ahmed have undertaken assignment as Architect of certifying completion of construction work of PERVEZ MANJIL Building, the Building of the project situated on the Plot No.14 crs no. tt352, vlp Road Jubilee park, Aurangabad, demarcated by its boundaries East : Plot No 21 West: 20 Ft Wide Road South : Plot No 13 North: Plot No. 15, Situated at S T Colony of Division Aurangabad village Aurangabad Taluka & District Aurangabad PIN, 431001 admeasuring 335,g sq.mts. Plot Area being developed by A B Constro, RERA Registration No. p515O0O1gg7o 2. Following technical professionals are appointed by Owner / promoter :- i) Mr. Shaikh Sohel Ahmed as L.S. / Architect : ii) Mr. Wahid Kadri Consultants as Structural Consultant. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the percentage of Work done for each of the Building / Wing of the Real Estate Project as registered vide number P51500018870 under RERA is as per table herein below, The percentage of the work executed with respect to each of the major activity of the Building, Overall percentage of work done with respect PERVEZ MANJIL is detailed in the Table A and B. (Till 30th December 2019) Table A (Prepared for the "Pervez Manjil") Sr No Task/Activity Percentaqe 1 Excavation 100 2 Number of Basement(s) and NA 3 Plinth 100 4 0 number of Podiums NA 5 Stilt Floor 100 6 4 number of Slabs of Super Structure 100 7 Internal walls 100 B The external walls 100 Common Areas, Compound Wall and all other requirements as may be required to Obtain Occupation 9 /Com pletion Certificate 100 TABLE. B Internal & Externa! Development Works in Respect of the entire Registered Phase Sr. Common areas and Propose Percentag Details No. Facilities, Amenities d e of Work (Yes/No) done 1. Internal Roads NA N.A & Footpaths 2. Water Supply Yes 100% Bore-well & Water Line From Municipal Corporation 3. Sewerage (chamber, Yes L00o/o Drainage Line till lines, Septic Tank , STp) Corporation Line 4. Storm Water Drains N/A 5. Landscaping & Tree N/A 6. Street Lighting N/A 7. Community Buildings N/n B, Treatment and disposal of N/A sewage water I 9. Solid Waste management N/A 10. Water conservation, Rain Yes 100 Rain Water water harvesting Harvesting will Completed As per Norms 11. Energy manaqement N/A t2. Fire protection and fire NA NA safety requirements 13. Electrical meter room, NA NA 14. Others ( Option to Add N/A more) Yours Faithfully Arch. Shaikh Sohel A