FORM 1 [see Regulation 3] ARCH ITECT.S CERTI FICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of wise) Money from Designated Account- Building/Wing Date: cA\ro \ryo t: To NirmalPrem Constructions, 35A, SanjaY Housing SocietY, Opp, SankalP Mangal KarYalaY, Osmanpura, Aurangabad. of Construction work of Building of Subject: Certificate of Percentage of completion Registration Number] situated on the ,,Drishtee Pride" [to be registered in MahaRERA demarcated by its boundaries to Plot No.L2, Gut No.11.3, Nakshatrawadi, Aurangabad the North - Land Gut No'112 I Part' South - 9 Mtr Wide Road' East - Plot No.13 of the same LaYout' West - Plot No'12 of the same Layout' Aurangabad of Division Aurangabad viilage Nakshatrawadi taruka Aurangabad District ptN 43100L admeasuring 366.018 Sq.Mtr. Area being developed by NirmalPrem Constructions. Sir, surveyor of I Ar. Saurabh Mirkute undertaken assignment as Architect /Licensed work of the Buildings Project' certifying Percentage of completion of Construction Aurangabad District Aurangabad situated on Plot No.l-2, Gut No.113, Nakshatrawadi, ptN 431001-. Admeasuring 366.018 Sq.Mtr' Area being developed by NirmalPrem Constructions. by owner / Promoter:- 1. Following technical professionals are appointed (Reg No'cA/2017186766\ as L'S' / (i) M/s. Mirkute & Associates (Ar.Saurabh Mitkute) Architect (ii)Shri.PradeepV.Mote(RegNo.615l2oL6)asStructuralConsultant. iiiil vrl, lshri lSmt..'..'..... "" as MEP consultant As Site Supervisor (iv) Shri/ Smt........ ffim Based on site lnspection, with respect to of the Building of the aforesaid Real Estate as on the date of this certificate, the Percentage of work done Project ,l certify that building of the Real Estate Project as registered vide number [to be Registered in RERAI under MahaRERA is as per table A herein below. of the activity of the entire The percentage of the work executed with respect to each building is detailed in Table B' Table A Building /wlng of the Building /wing Number (to be prepared separately for each Project) Percentage of Work done Excavation L Number of Plinth 0 Number of Podiums L Number of Stilt Floor 4 Number of Slabs of Super Structure ffilaster, Floorings within flats/Premises, Doors and windows to each of !!91]!t /lrernrsg! ffiilat/premises, Electrical Fittings within the Flat/Premises st.,r.r*, Lil,t *"lls and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water ffind External Plaster, Elevation, completion of terraces with waterproofing of tgq!1! ffir pumps, Fire fighting Fittings and equipment as per CFO NOC, Electrical Fittings to Common areas' electro, mechanical equipment, Compliance to conditions of plinth environment /CRZ NOC, Finishing to entrance lobby/s, protection, paving of areas appurtenant to Building/Wing' Compound Wall and all requirements as may be required to ation / ComPletion Certificate- ffi Table B phase. lnternal and External Development Works in Respect of the entire registered Sr. Common Areas and Facilities, Proposed Percentage Details No Amenities (Yes/No) of Work done t00% Through Bore Well t Water SuPPIY Yes 0% Chamber, Lines. 2 Sewerage ( chamber, lines) Yes As Per Drawing of Water conservation, Rain Yes 0% 3 Consultant water Harvesting 4 Others (option to add more) ffi