p L] RBAN AIEI R Annexufe A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE \ (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date.- 17.07.2024 To, Matoshree Builders & Developers, Chhatrapati Sambhaji Nagar Subject: Certificate of Percentage of Completion of Construction Work of GARDEN GITY having MahaRERA Registration Number P51500018921 being Developed by Matoshree Builders & Developers. Sir, | / We have uhdertaken assignment as Architect Licensed Surveyor of Certifying Percentage of / Completion of Construction Work of GARDEN CITY having MahaREM Registration Number P51500018921 being Developed by Matoshree Builders & Developers. Based on the Site Inspection, with respect to the Layout / each BuildingMjng of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildinglWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. . TABLE.A Layout / Building / Wing Number GARDEN CITY Row House No 01 to 05 (to be prepared separatety for each LayouUBuildingMing of Project) S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Gertificate) (1) (21 (3) Excavation 0% a Basements (if anv) NA 3. Podiums (if anv) NA 4. Plinth 00% e Row House No 06 to 13 Row House No 14 to 21 Tasks / ActivitY Tercelrtage of lctual Work Done S. No. (As on date of the Certificate) (3) (1) a Excavation 2. .NA 0o/o 3. Podiums (if any) NA 11 Plinth 00% 5. Stilt Floor 00% 6. Slab of Super Structure 009/o 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 000/o within Flats / Premises 8. Sanitary Fiftings within Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead 00Vo and Underground Water Tanks 10. External Plumbing & External plaster, Elevation, Compjetion of 00% Tenaces, with water:proofing of the Building / Wino 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equiprnent's as per CFO NoC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finiqhing to Entrance Lobby/s, Plinth protectjon, paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activity l2to House No 22 S. No. Tasks / Activity. Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) ,1 Excavation lVo 2. Basements (if any) NA 3. Podiums (if any) NA ^ Plinth 00% 5. Stilt Flqor 00Vo 6. Slab of Super Structure 000/" 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 00% -wifhin FlAt\ / Prornicac 8. Sanitary Fittings within Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0070 and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 000/o Terraoes, with waterproofing of the Buildinq / Wino 11. 00o/o 0 Row House No 28 to 34 Row House No 35 to 41 I NoC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of .Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project to of other Row House No 42 to 49 S. No. Tasks / Activity Percenlage ofActual Work Done (As on date of the Certificate) (1 (2) (3) 1. Excavation 0o/o 2. Basements (if any) NA 3. Poiliums (if any) NA 4 Plinth 00% 5. Stilt Floor 00% 6. Slab of SuDer Structure 00% 7. Internal Walls, lnternal Plaster, Floorings, Doors, windows 00% within Flats / Premises e Sanitary Fittings within Flats / Premises 000/o 9. 00% and Undefground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00% lqlqces, with waterproofjng of the Buildinq /Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment's as per CFO NoC, Elechical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CM N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Afeas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreement of Sale, Any other Activitv Row House No 50 to 57 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0o/o 2. Basements (if any) NA 3. Podiums (if any) NA Plinth 000/o 5. Stilt Floor 00% 6. Slab of Suoer Structure 000/0 7. Internal Walls, Internal PIaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitary Fittings within Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead 00% 0 and Underqround Water Tanks '10. .External Plumbing & External Plaster, Elevation, Completion of 00% Terraces, with waterproofinq of the Building / Wing 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipmentls as per CFo NoC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NoC, Finishing to Entrance Lobby/s, Plinth Protectioh, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity House No 58 to 64 Tasks / Activi$ Percentage of Actual Work Done (As on date of the Gertificate) fl) (21 (3) 1. Exeavation 0% 2. Basements (if any) NA 3. Podiums (if anv) NA /1 Plinth 00% 5. Stilt Floor 00% o. Slab of SuDer Structure 00% 7. 00% within Flats / Premises 8. Sanitarv Fittinqs within Flats / Premises 00Yo 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead 00% and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, completion of 007q TerIaces. with wateroroofinq of the Buildinq / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to,Aqreement of Sale, Any other Activity Row House No 65 to 72 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Gertifichte) (1) (21 (3) Excavation 0% Basements (if anri) NA Podiums (if any) NA A 00% Plinth Stilt Floor O0Vo c 6. Slab of Super Structure 00% -& 7. l.nternal Walls, Internal Plaster, Floorings, Doors, windows 00% within Flats / Premises L Sanitary Fittin0s within Flats / Premises 000k 9. Staircases, Lift Wells & Lobbies at each Floor Level 0verhead 00Vo and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 000/o Terraces, with waterproofinq of the Buiidinq / Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0070 Equipment's as per CFo NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CM NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/vving, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aoreement of Sale, Any other Activitv I Row House No 73 to 78 S. No. Tasks / Activity Percenta!e of Actual Work Done (As on date of the Cedificate) (1) (21 {3) 1. Excavation 0Vo .) Basements (if anv) NA 3. Podiums (if anv) NA 4. Plinth 0070 5. Stiit Floor 0090 6 Slab of Super Structure 00% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitary Fittin0s within Flats / Premjses 0070 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead 00% and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00o/o Terraces, with waterproofing of the Buildinq / Winq ? 11. Installation of Lifts, Water Purnps, Fire Fighting Fittings and ! 00% Equipment's as per CForNoC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildinEMing, Compound Wall and all other requirements as may be required_ to complete Project as per specifications to Aoreement of Sale, Any other Activitv Row House No 79 to 84 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) I Excavation 0o/o Basements (if anv) NA 'Podiums (if any) NA 4. Plinth 00% 5. Stilt Floor 00% 6 Slab of Super Structure 00Vo 7. Internal Walls, Internal PIaster, Floorings, Doors, windows 0070 within Flats / Premises d. Sanitarv Fittinos within Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 00% and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00% Terraces. with wateroroofinq of the Buildinq / Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0070 Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Envirbnment / CRZ N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingflVing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreement of Sale, Any other Activiw Row House No 85 to 90 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) Excavation 0o/o 2. Basements (if anv) NA Podiums (if anv) NA Plinth 00% Stilt Floor 00% o. Slab of Suoer Shucture 00% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 00% Within Flats / Premises 8. Sanitary Fittinqs within Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 00% and Underoround Water Tanks 10. External Plunibing & External Plaster, Elevation, Completion of 0070 Terraces, with waterproofinq of the Building / Wing 't1. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as oer specifications to Aqreemeni of Sale, Anv other Activitv a Row House No 9l to 96 S. No. Tasks / Activity Percentage ofActual Work Done (As on date of the Certificate) (1) (21 (3) 1. 'Excavatiori lVo 2. Basements (if any) NA J. Podiums (if any) NA ,1 Plinth 000 5. Stilt Floor 00%o 6. Slab 0f Suoer Structure 00% 7. Internal Walls, lnternal Plaster, Floorings, Doors, windows 000/o within Flats / Premises 8. Sanitary Fiftings within Flats / Premises 00% I Staircases, Lift Wells & Lobbies at each Floor Level Overhead 00% and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 000k Terraces, with waterproofino of the Buildinq / Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0070 Equipment's as per CFo NoC, Electrical Fittings, Mechanibal Equipment's, Compliance to conditions of Environment / CM NOC, Finishing to Enhance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreement of Sale, Any other Activitv Row House No 9Z to S. No. Tasks / Activity' Percentage ofActual Work Done (As on date of the Gertificate) (1) (21 (3) Excavation 0o/o 2. Basements (if any) NA 3. Podiums (if any) NA I Plinth 00% 5. Stilt Floor 00% 6. Slab of Suoer Structure 00% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitary Fittinqs within Flats / Piemrses 0070 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead 00Vo and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00% Terraces, with waterproofinq of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire fighting Fittings and 00o/o Equipment's as per CFO NoC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ a Row House No 103 to 108 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Gertificate) (1) (21 (3) 1. Excavation 0o/o 2. Basements (if anv) NA Podiums (if any) NA A Plinth 00% 5. Stilt Floor 00% 6. Slab of Super Structure 00% 7. Internal Walls, lnternal Plaster, Floorings, Doors, windows 00% wiihin Flats / Premises 8. Sanitary Fittings within Flats / Premises 00% q Staircases, Lift Wells & Lobbies at each Floor Level overhead 0070 and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 0070 Terraces. with waterproofinq bf the Building / Wing 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 000/o Equipment's aS per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as oer specifications to Agreement of Sale, Any other Activity Row House No 109 to 116 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Gertificate) (r) (21 (3) Excavation 0o/o 1 2. Basements (if any) NA Podiums (if any) NA A Plinth 0070 A Stilt Floor 00% b. Slab of Suoer Structure 00% 7. Internal Walls, lnternal Plaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitarv Fittinqs within Flats / Premiseq 0070 9. Staircases. Lift Wells & Lobbies at each Floor Level 0verhead 000/o 0 and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00% Terraces, with waterproofinq of the Buildinq / Winq 1't . Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipment's. as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Vving, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreement of Sale, Any other Activitv Row House No 1'17 to 124 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Ce(ificate) (1) (21 (3) 1 Excavation jVo 2. Babements (if anv) NA 3 Podiums (if anv) NA A Plinth 00% 4 Stilt Floor 00% 6 Slab of SuDer Structure 00% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 0070 within Flats / Premises 8. Sanitarv Fittinos within Flats / Premises 000/o 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0070 a and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, C0mpletion of 0070 Terraces, with wateroroofino of the Buildino / Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fiftings and 00% Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment i CM NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Vving, Compound Wall and all other requirements as may be required to complete Project as per soecifications to Aqreement of Sale, AnV other Activitv Ro\|t No 125 to t0 1132 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) Q) (3) i 1. Excavatiori 0o/o 2. Basements (if any) NA 3. Podiums (if any) NA A PIinth 00% 5. Stilt Floor 000/o a 6. Slab of Super Structure 0070 7 lnternal Walls, Internal Plaster, Floorings, Doors, windows 0070 within Flats / Premises 8. Sanitary Fittinqs within Flats / Premises 0070 0 Staircases, Lift Wells & Lobbies at each Floor Level 0verhead 0070 and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00% Terraces, with waterproofino of the Buildinq / Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipment's as per CFo NoC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appdrtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreement of Sale, Any other Activitv Row No 133 to 140 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) fi) (21 (3) 1 Excavation OYo Basements (if anv) NA Podiums (if anv) NA Plinth 0070 E Stilt Floor 00% 6. Slab of Super Structure 00% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 00% within Flats / Premises 8. Sanitary Fittinqs withjn Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 00% and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 00o/o Terraces, with waterproofinq of the Buildinq / Winq 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 000/o Equipment's as per CFo NoC, Elechical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Buildingruing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreement of Sale, Any other Activitv Row House No 141 to S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) QI (3) e 1 ExCavation 0o/o 2, Basements (if any) NA 3. Podiums (if any NA Plinth 00Vo 5. Stilt Floor 009/o 6. Slab of Super Structure 000/o 7. Internai Walls, Internal Plaster, Floorings, Doors, windows 000h within Flats / Premises 8. Sanitary Fittings within Flats / Premises 0070 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 000/o and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 0070 Terraces, with waterproofing of the Buildinq / Winq 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment's as per CFo NoC, Electrical Fittings, Mechanical Equipment's; Compliance to conditions cjf Environment i CRZ NoC, Finishing to Entrance Lobby/s, Plinth Protection, paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activitv Row House No 149 to 156 S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) ? (1) (21 (3) Excavation lVo 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 000/a 5. Stilt Floor 00Yo Slab of Super Structure 00Vo 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 0070 within .Flats / Premises 8; Sanitary Fittings within Flats / Premises 00% Staircases, Lift Wells & Lobbies at each Floor Level overhead 0070 and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 000/o Terraces, with waterproofing of the Buildino / Wino 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 00% Equipment's as per CFO N0C, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ I N0C, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activitv a TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number S. No. Common Areas & Facilities Proposed Percentage of actual Work Done Details (Yes / N0) (As on date of Certificate) (1) QI (3) AI {5) 1 Internal Roads & Footpaths Yes 000/o Water Supplv Yes 0070 3. Sewerage (Chamber, Lines, Septic Yes 00% Tank, STP) i Landscapinq & Tree Plantinq Yes 00% 5. Street Liqhtinq Yes 009/o 6. / Rain Water Water Conservation Yes 00o/o Harvestinq 7. Fire Protection & Fire Safety No 00% requirements 8. Electrical Meter Room, Sub-Station, Yes 00% Receivino Station Overall Project Completed- 00% Yours faithfully, Reg. no - CA/2013/59544 Date: 17 .07 .2024