G.B.G & ASSOGTATES Architectural Planner Designer Engineer Flat No. 06,siddhivinayak Apartment, 15 Jaivishwabharti colony, Aurangabad. Date 08i01/2018 To, [M/S HARSIDDHI BUILDER'SI PIOtNO. 02, SHIVGIRI HOUSING SOCIETY, HARSOOL, AURANGABAD. Subjeet : Certificate of Percentage of Cornpletion of Construction Work of Al to A11 & A12 to M2 TYPE Building(s) of the Project t l situated Harsool taluka Aurangabad on Gut No 2fi13 demarcated by its boundaries (latitude and longitude of the end points) 19 55'29.3" to the North 19.9247939 to the South 75 2A'49.1" to the E,asl 75.3469594 to the West of Division village Harsool taluka Aurangabad District Aurangabad PIN 431008 admeasuring 1600.00 sq.mts. area Being developed by [M/S HARSIDDIII BUILDER'S] Ref l Sir, I S. S. BHALEKAR have undertaken assignment of certif,ying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being A1 to A11 & Al.2 to A22 TYPE Building(s/ situated on the plot bearing GUT NO.210/3 of Division Village IIARSOOL Ta luka AURANGABAD District ALIRANAGAB PIN 431008 admeasuring 1600'00 sq'mts' area being developed by lnrUs HARSIDDHI BUILDER'SI 1. Followingtechnical professionals are appointed by Owner / Promoter :- (i) M/s/Shri/Smt. C.B.C. ASSOCIATES L.S. / Architect ; (ii) IWs /Shri I Smt. ABFIAY S. PATIL Structural Consutrtant (iiz) IWs /Shri / Smt. MEP Consultant (iv) M/s /Shri / Smt. C- B. CHAPKE Site Supervisor 2. We have estimated the cost of the completionto obtain Occupation Certiftcate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s)of the project. Our estirnated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developerand Consultants and the Scheduleof items and quantity for the entire work as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. ;mt riU-:Z-O 3. We estimate Total Estimated Cost of completion of the building(s) of the afbresaid project under reference as Rs. ( Total of Table A and B). The estimated Total Cost of prcject is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estirnated Cost Incurred till date is calculated at Rs. (Total of Table A and B)_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Cornpletion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from (planning Authority) is estimated at Rs. ( Total of Table A and B). 6. I certifythat the Costof the Civil, MEP and allied work for the aforesaidProjectas completed on the date of this certificate is as given in Table A and B below: Taerr A Building /Wing bearing Number- or called (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts (1) (2) (3) 1 Total Estirnated cost of the building/wing Rs. as on date of Registration is 2 Cost incurred as on Rs. (based on the Estimated cost ) 3 Work done in Percentage % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. as on not included in the Estimated Cost (Annexure A) Test,e B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No. Particulars Amounts (1) (2) (3) Total Estimated cost of the Internal and Extemal Rs. 3,30,00000i- Development Works inc luding amenities and Facilities in the layout as on f 0/01/2018 date of Registration is Cost incurred as on l0l0l./201,8 (based on the Estimated cost). Rs. 33,000001- Work done in Percentage (as Percentage of the estimated cost). lOo/o Balance Cost to be Incurred (Based on Estimated Cost). Rs. 2,97,OOOOOA Cost Incurred on Additional /Extra Items as on not included in the Estimated Cost (Annexure A). Rs. * Note : B.E. (Oivilt ReE NCI.AM0tr3&4,04 1. The scope ofwork is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantrty Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carr5, out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost)