FORM-2 ENG INEERS CERTIFICATE D.te : ll5eptember 2017 ADARSH CONSTRUCTION, Kalpana Plaza, Plot No.258, Office No.01, N-1, CIOCO, Subject:Certificate of Cost Incurred for Development of"RlDDH|SlDDH| PLAZA" for construction of Residential cum Commercial Building of the project situated on the Plot No.216, Sr.No.23124, N-4, CIDCO, New Aurangabad, demarcated by its boundaries (atitude and ongitude of the end points) Plot no.217 to the North, Deiotified land to the, 18.00 [,4tr.w]de road to the East, Plot No.229 to the Wen of taluka Aurangabad Distfict Maharashtra PIN-431003 admeasurjng 552.50 5q.[,ltf. area being developed by "ADARSH CONSTRUCTION" Ref MahaRERA Registyration Number 5ir, l, alikhan Ayubkhan Pathan have undertaken assignment of Certifying Estimated Cost for the subject Real Estate Project proposed to be registered !nder MahaRERA, beins Pot No.216, 5r.No.23124, N-4, CIDCO, New Aurancabad, District Maharashtra PIN 431003, admeasuring 662.50 Sq.mtr.area belng developed by "ADARSH CONSTRUCTION". 01. Following tech n ica I profession ak are appo nted by Promoterl {i) shri.Ar, Narendra sahujias Afchitect {ii) shri.shrinivas Karanjikar as structural consultant {iii) Shri.Alikha n Ayubkh.n Pathan as Qua ntity 5u rveyor 02. We have estimated the cost of the completion to obtain Occupancy Cedificate/Completion Certiflcate, of the Civi, MEP and alled works, of the Building of the project. Our Estimated cost calc!lations :re based on the Drawings/plans rnade available to us for the project under refereice by the Developer and consu tants and the Schedule of items and quantity for the entire work as calcu ated by Alikhan Pathan quantity Surveyor appointed by Developer, and the assumption of the cost of materiaj, labour and other inputs made by d"ve'oppr, did rhe !re r. pe'rro d r.dourb/ |. ..02.. 03. We estimate Totat Estimated Cost of comptetion of the buitding of the aforcsaid project under reference as Rs. 1,91,00,000/- {Totat ofTable A & B). The estinated Totalcost ofproject is with reference to the civil, MEp aid aIied works requh€d to be completed for the purpose of obtainins occupancy Certificate Completion Cedificate for the buitding from the Aurangabad Municip;l / corporation being the p/anning Authorjry under whose jurisdiction the aforesaid Project i5 being implemented. 04. The Estimated Cost lncurred tit/date is calcutated at Rs.1,91,00,000/ (Total Table A & B). Ihe amount of Estimated Cost tncutreo 6 calculated on the base amou nt of Tota I Estim.ted cost. 05. The Balance cost of Completion of the Civil, MEp Building of the subject project to obtain occupancy (Planning Rs. 1,91.00.000/- (Tot.tofrabte A & Bj. 06. I Ce ify that the Cost of the Civit, lvlEP and allied Project as completed on the date of this TABLE PRO'|ECI - "RIDDHI 5IDDHI PLAZA" Total Estimated Cost ot the Building as on 1,91,00,000/- cost incured as on (based on the Estimated cost) Worl done jn pe(enrage {as percentage; the estimated cos0 B.lance Cosr to be Incured (Based on Estimated Cosr) Additional / Extra ttems as included in the Estimated cost (annexure A) ..03,. TASLE - B PROIECT - "RIDOHI SIDDHI PIAZA' reSistered phase of the RealEstate Project) 5r.No. 01. Total Estimated cost oof the Internal and r.9I,00,000/- External Development Works including amenities and Facilities lthe layout as on date ofthe Registration is 02. - Cost incured a5 on (based on the Estimated 03. Work done in Percentage (as Perc€ntage of the estimated cost) 04, Balance Costto be Incurred (Based on Estimated cost) 05. Cost Incutred on Additional/ Extra ltems as on not included in the Enimated Cost | 613 f6L-63) PANIAN AA. C|vll Ertln or