CORE CONSULTANTS Structural Consultants & Chartered Engineers Plot No. 206, Office No.9 & 10, 3rd Floor,' Krishna Arcade', Opp. Shri Krishna Hospital, Samarth Nagar, Aurangabad· 431001. Ph.: 0240 . 6602529. Email: vargantwar@gmail.com FORM 2 [See Regulations 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project Wise) Date:30.07.2017 To, M/S. Amrut Developers Subject: Certificate of Cost Incurred for Development of "Amrut Developers", for Construction of 18 Flats and 11 Shops in IBuildingof "Amrut Sai Jai's Ekdant", Project situated on land CTS No. 14813,Padampura, AURANGABAD demarcated by its boundaries: North: 15.00wide D.P. Road South: Sr No. 52, Land of Mr. Suresh Mutha East: 24.00Mtrs. wide D.P. Road West: Sr No. 52, Land of Mr. Suresh Mutha of Division - AURANGABAD, VilIage-Aurangabad,Taluka - AURANGABAD, District - AURANGABAD, Pin - 431001, admeasuring 2568.18Sq.Mtrs., Area being developed by MIS. Amrut DevelopersREF: RERA Registration Number APPLIED. 1 RAJ'SH~AR STRUcruRAL CONSULTANT & CHARTEREDENGINEER REGN. No. AM 80095/6 Sir, We M/ s. Core Consultants, have undertaken assignment of certifying Estimated Cost for the Subject, Real Estate Project proposed to be registered under RERA, being Construction of 1 Building of "Amrut Sai Jai's Ekdant", Project situated on land CTS no. 14813, Pannalalnagar, AURANGABAD of Division AURANGABAD, Village- Aurangabad, Taluka and District - Aurangabad, Pin - 431001, admeasuring 2568.18Sq. Mtrs. Area being developed by My s. Amrut Developers. 1. Following technical professionals are appointed by Owner/ Promoter.- (i) Shri. Ganesh Mharolkaras L.S./ Architect; (ii) Mr. Anil Datar as Structural Consultants. (iii)Shri.Ganesh Mharolkaras MEP Consultant (iv) M/ s. Core Consultants as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil MEP and Allied Works, of the Buildings(s) of this project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by RAJESH~AR 2 STRUCTURAL CONSULTANT & CHARTEREO ENGINEER REGN. No. AM 8()OQ'S:/I< Mj s. Core Consultants quantity Surveyor, appointed by Developerj Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.8,10,50,000j - (Total Built Up Area _ 2568.18Sq. Mtrs.). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificatej completion certificate for the building(s) form the AMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. j -. The The Estimated Cost Incurred till date is calculated at Rs. 6,05,00,000 amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificatej Completion Certificate from Aurangabad Municipal Corporation is estimated at Rs.2,05,50,000j -. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below. ~ 3 RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095(6 TABELA 1. Building (to be prepared separately for each building/ wing of the Real Estate Project) Sr. No. Particulars Amount 1. Total Estimated cost of the building Rs. 8,10,50,000/- 2. Cost Incurred as on 30.07.2017 (Based on Rs. 6,05,00,000/- the Estimated Cost) 3. Work Done in Percentage 74.65 % (as percentage of the estimated cost) 4. Balance Cost to be Incurred Rs. 2,05,50,000/- (Based on Estimated Cost) 5. Cost Incurred on Additionalj Extra Items Rs.OO/- as on 30.07.2017 not included in the Estimated Cost (Annexure-A) GANTWAR STRUCTURAL ONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 4 ;" ) < I ,~:- ".' ,', . TABELB (to be prepared separately for each building / wing of the Real Estate Project) Sr. No. Particulars Amounts 1. Total Estimated cost of the Internal and Rs.OO/- External Development works including amenities and Facilities in the layout as on I i 30.07.2017. Date of Registration is applied Cost Incurred as on 30.07.2017 ·2. Cost Incurred as on 30.07.2017 (based on Rs.OO/- the Estimated Cost) Work done in percentage 100% 3. (as percentage of the estimated cost) Rs.OO/- Cost Incurred on AdditionaIj Extra Items as on 30.07.2017 not included in the estimated cost (Annexure-A) Yours faithfully For, RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 5 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate! Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (8) and in case quantity are being calculated by officer of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred to be incurred. 5.All components of work with specifications are indicative and not exhaustive. Annexure-A List of Extra! Additional Items executed with cost (which were not part of the original Estimate of Total Cost) RAJE~ANTWAR STRUCTURAL CONSULTANT . & CHARTERED ENGINEER REGN. No. AM 80095/fi 6