1 Ar. Ganesh Mharolkar CAfZ001/272S4 Architects • Interior Oesi.gne.rs 203, 2nd Roar, Shankar Plaza. Sahakar Naga-rChowk, Opp: Bankof Baroda, Oargah Road. Aurangabacl- 431 005 Ph.: 0·240-2346644, 2970299 Cell:9423'149144 E-mail: spacearabd@ginaiLcom FORM 1 [See Regulations 3] ARCHITECTS CETIFIGATE (To besubrnntec at the lime of Registration of Ongoing Project and for withdrawal of money from Designed Account- Building! Wing wise) Date: 25.0T.2017 To, MIS Amrut Developers. Labh Chambers, Station Road, Aurangabad. Subject Certificate of Percentage of Completion of Construction work of Residential cum Commercial Building of the project "Amrut Sai Jai's Ekdant" (RERA Regulation Number: NEW APPLICATION) situated on the Land Cts No. 14813, Pannalalnagar, Aurangabad demarcated by its boundaries North: 15.00 wide D,P. road South.:RESERVATION OF MCA & PROPERTY BELONGING SHRI SURESH MUTHA East: 24.00 m. wide D.P. road West: PROPERTY BELONGING SHRI SURESH MUTHA. Division AURANGABAD, Village AURANGABAO, faluka AURANGABAD, District AURANGABAD, Pin 431001, admeasuring 1782.74 Sq. Mtrs. Area being developed by Mis. Amrut Developers. Sir, I Ganesh Mharolkar have undertaken assignment as an Architect of Certifying Percentage of Completion of Construction Work of the Residential cum Commercial, Building of the project "Amrut Sai Jai's Ekdant" of Division AURANGABAD, Village AURANGABAD, taluka AURANGABAD, District AURANGABAD, Pin 431005, admeasuring 2568.18 Sq. Mtrs. Area being developed by Mis. Amrut Develo ers. ganesli ?tlfuzro~. ARCHITECT cA12001/27254 1. Following technical professionals are appointed by Ownerl Promoter- (i) Shri GANESH MHAROLKAR as an Architect; (Ii) Shri Anil Datar as Structural Consultant. (iii) Shri Raju Waghmare as Plumbing Consultant. (iv) Shri Ravindra Hivale as Site Supervisor. Based on Site .Inspection with respect to each of the Buildingl Wing of the aforesaid Real I Estate project, I certify that as on the date of this certificate, the Percentage of work done for each of the building/ Wing of the Real Estate Project as reg.istered vide number NEW PROJECT APPLICATION under RERA is as per table A herein below. The percentage of the work executed with respect to eaoh of the major activity of the Building and Overall Percentage of work done with respect to each Buildingl Wing is detailed in the Table B. ~Ik. qanes~~ ARCHITECT CAj2001j27254 TABLE A 0·1Building (To be prepared separately for each Building/Wing of the Proj_ect) Sr. No. Tasks/ Activity Percentage of Work Done 1. Excavation 100 2. 1 Number of Plinth 100 3. o Number of Podiums NA 4. 1 Basement Floor 100 5. 7 Numbers of Slabs of SUQerstructures. 1'0'0 6. Internal Walls, Internal Plaster, Floorings within Flats/ 1'00 Premises, Doors and Windows to each at-the FlaU Premises 7. Sanitary Fittings within the Fl'atl Premises, 1'00 Electri.cal Fittit}gs' Within the Flat! Premises 8. Staircase, Ufts Wells and Lobbies at each Floor level 1'0'0 connecting Staircase and Lifts, Overhead and 'Underground Water Tanks 9. The External Plumbing and external plaster, elevation, 1'00 cornplefion of terraces with waterproofing of the building I winJl, 10. Installation of lifts, water pumps, fire Fighting Fittings and 7'0 I Equipment as per CFP NOC, Electrical fittings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment! CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ Wing, Compound wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate. ~ qanesli 'MfiarolliJz., ARCHITECT CA/2001/27254 Internal and External Development W or ks in the respeet 0f the enrIre Regis . tere d Phase Sr Common Areas and Facilities I Proposed Percentage of Details Amenities (Yesl No) Work Done 1 Internal Road & Footpaths NO 00 NA 2 Water SUPJ)ly YES 100 COMPLETED 3 Sewerage (Chamber, Lines, Septic YES 100 COMPLETED Tank, STP) 4 Storm Water Drains NO 00 NA 5 I Landscaping & Tree Planting YES 70 IN PROGRESS 6 Street Lighting NO 00 NA 7 Community Buildincs NO NA NA 8 Treatment and disposal of sewage NO NA NA and .sullage water 9 Solid Waste Management & NO NA NA Disposal 10 Water conservation, Rain Water YES 100 COMPLETED harvesting 11 Energy Management NO NA NA 12 Fire protection and fire safety YES 70 IN requirements PROGRESS 13 Electrical meter room, sub-station, YES 60 IN receiving station PROGRESS 14 Others (Option to Add more) Yours faithfully ~I~- GANESH MHAROLKAR qanesli 9dliaro{~l Architect ARCHITECT (CAl2001127254) CA/2001/27254