MANOJ KALA AND ASSOCIATES Interiors & Architect FORM 1 (see Regulation 31 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 3111 ono 17 To, CITY SHARTEE TECHNO HERITAGE LLP BLOCK NO. 101 TO 104, SAl TRADE CENTRE RAILWAY STATION ROAD, NEAR RTO AURANGABAD- 431001 Subject: Certificate of Percentage of Completion of Construction Work. of C type Building of the Project Ninnan Bharti City Centre [NOT YET REGISTERED) situated 00, as No.17849/4, Sillekbana, Samarth Nagar, Aurangabad demarcated by its boundaries (latitude and longitude of the end points) To the North - Land of Law College CTS 17846 To the South - 24 MTR Wide Road, Sawarbr Marg. To the East - Part of CTS No.17849 To the West - CTS No.17849-3 Mosque Of Division Aurangabad, CTS No. 11849/4, Sillekbana, Samartb Nagar, Aurangabad admeasuring 1935.03 BHARTEE TECH..~O HERITAGE LLP Altius 8-301-302, 3ni Floor, Space Olympia, Sutgimi Chowk, Garkheda, Aurangabad - 431009 MANOJ KALA AND ASSOCIATES rnteriors & Architect Sir, I MANOJ KALA Proprietor of MANOJ KALA & ASSOCIATES have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the of the Project comprising C type Building, of the Project Nirrnan Bharti City Centre Building, situated on the, CTS No.17849/4, Sillekhana, Samarth Nagar, Aurangabad admeasuring 1935.03 Sq.mts. Comprising Nirman Bharti City Centre Building are being developed by Promoter CITY BHARTEE TECHNO HERITAGE LLP 1. Following technical professionals are appointed by Owner / Promoter:- (i) MA..l\iOJ KALA of MAN OJ KALA & ASSOCIATES as L.S. I Architect; (ii) NG KHARKHANE as Structural Consultant (iii) Chandrakant Sakhare as Site supervisor Based on Site Inspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for comprising C type Building of the Real Estate Project -. Nirman Bharti City Centre Building as registered vide number NOT YET REGISTERED under Maha RERA is as per table "A" herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Altius 8-301-302, 3M Floor, Space Olympia. Sutgimi Chowk, Garkheda, Aurangabad - 431009 MANOJ KALA AND ASSOCIATES Interiors & Architect Table A Ninnan Bharti aty Centre ~ C - Type Building CTS No. 17849/4, Sillekhana, Samarth Nagar, Aurangabad ['·---8. No. ---r------·--.·-·-·.·---··-T-. a-s-ks-·-/-Activj~;---'----·-'·-··------·-·-·-·-·'··-··-·-'·-·-·-··~-P-er-ce-n;;;~-~·fW-·-o-rk'---···- I ~-------- I 1 Excavation 100010 L 2 X Number of Basement(s) and Plinth j 100% ~---------+---------------------------------------------j I i :=== ! 3 X Number of Podiums 0% jl~_ _4 I ! 5 - ~ti~~_:_ :__~ __ X number of Slabs of Super Structure =t=_'~-== ! 100% i : Internal 'W-alls,Internal Plaster, Floorings within Flats i Premises, 100% , 6 i Doors and Windows to each of the Flat I Premise r-·_ _-.-.---- - ....... - _-_._----_.-------{ , i 7 I Sanitary Fittings within the Flat i Premises, Electrical FIttings .j...............•. , ..•.---, -. '.'--- .."'-.~--------~------.-- _- • -._ ....•-.--""." •.- ----~~--.----- •• ~.•. -----.•. ,- •.•-••-••-•.•~-- --•.------------~-. ---- ..•--....••• -_. ••..•· I 20% ! " with the Flat! Premises I I 8 Staircases, Lift Wells and Lobbies i Staircases and Lifts, Overhead and Under-ground Water Tanks I at each Floor Level connecting t 70% I I ; r----------·----·_- --t·Th(:;atWtal plurnb{~i~-w~fextemaIplaster~-ej~8boncompiet{~;~---"t-·-· t 9 i of terraces with water-proofing of the Building /Wing i 1 I Installation of lifts, water pumps, Fire Fighting Fittings and I Equipments as per CFO NOC, Electrical fittings to Common I Areas, electro mechanical equipment, Compliance to conditions I of environment / CRZ NOC, Finishing to entrance lobby/s, plinth 10 i protection, paving of area appurtenant to Building / Wing, 80% j Compound Wall and all other requirements as may be required to ! Obtain Occupation / Completion Certificate ! ! Overall Percentage of Completion of the work done for the entire ~---:---------+-----------------~ 80% 11 Building I Wing Altius B-301~302, 3rdFloor, Space Olympia. Sutgirni Chowk, Garkheda. Aurangabad - 431009 MANOJ KALA AND ASSOCIATES Interiors & Architect TABLE-B Internal & External Development Works in Respect of tbe entire Registered Phase Nirman Bharti City Centre - C - Type Building CTS No. 17849/4, Sillekhana, Samarth Nagar, Aurangabad [-. Common Areas and Facilities, Amenities----"----r-propose;rT-Percentage ofT"-- """""-"'----Oetails---- I I ! Completion ' i Internal Roads and Footpath Yes 100% RCC Road ! i Water Supply Yes 0% By Borewell II i Sewerage (Chamber, Line, Septic, Tank, STP) i Yes J OOCiG Chamber Line No STP II _... - 'I ..-r+ " ........ "...... ... · ·t:, _. i ---··.-.. ·-···--..i······ ~ - --- ,,- . j Storm Water Drains i NO 0% i 1 i NA 1 ~ -""- '" ,,-------""-- ..-.------...L__._------T-'"-"'"'-.-.-.--- ..____J_------.- .. -.---"" ! Landscaping & Tree Planting ! Yes 50% Tree Plantation Ar. ound Tht I I Building I Street Lighting Yes O%! ---L~ Street''''''L~igh~' -t - I Community Buildings [ Treatment and Disposal of Sewage and Sullage NO 0% NA ! Water : Solid Waste Management and Disposal NO 0% NA j I Water Conversation, Rain Water Harvesting Yes 80% i Work In Progress ! Energy Management NO O%! NA ; Fire Protection and Fire Safety Req-u-=-ir-e-m-e-n-ts---+--Y=-=-es--4---2=-0'l:-::Vc-'-o--'1 FIRE HYDREN=-=rr=-.--- ! I PROVISION OF OVER I HEAD TANK (WIP) -+- ; 20'l'O I 315 KVTRANSFOR.,\1ER . ~ - - -: ::_: t {W~ ...• :: - -- - -- NO , '---.------,,..---,~"""7="""<::----------L---_-L--------'- __ -_-.. --__ -- Architect Reg. No.CA/96J19S91 Altius 8-301-302, 31"d Floor, Space Olympia, Sutgimi Chowk, Garkheda, Aurangabad - 431009