/ FORM I I Regulation 3) ARCIDTECT'S CERTIFICATE (To be submiued m the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Building/\Ving wise) • Date: 25.07.17 To The Mis Pratk Bulldeon, Plot No. 01, pushpgiri Apartment, Shiva]! Nagar road, gurkheda parisar, Aurnngabad. Maharasbtra. •• ubjcct: Certificate of Percentage of Completion of Construction Work of "BHASKAR VASTITPURTI APPARTMENT-02" Building's AB , CO & All TYPE ROW BOUSEof the Project iRERA Registration '{umber! situated on the Plot bearing~litmitaGut nn- I 47,Plot no-02, demarcated by its boundaries (latitude and longitude of the end points) Open space & plot no-Otto the North, Remniniug land gut no.-147 of mr. Malvc to the Soutb,Remaining land gut no.-147 of rnr. Mnlvc to the East, 09.00 M.\\. Road to the \Vest of Division Aurangab:ul village ~lltmitll raluka Aurangnb:1d District Aurangabad Pl~ 431010 udmeasuring Plot Area = ~405.34 sq.mts.&Proposrd Built-up Area= 6147.38 sq.mt, area being developed b)' Pratk Buildcon. Sir, I Dhananjay B. Doifode have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the AB , CD & All TYPE RO\Y HOUSE of the Building I Phase or the Project situated on the plo: bearing Salam Gut no.-147 , Final Plot no- 02. of Oil ision Aurangabad village Mitmita taluka Aurnng:ibad District Aur:111gab11d Pl 43 IOIOadmeasuring Plot Are11 = 4405.34sq.mts.& Built-up Area= 61~7.38 sq.mt. area being developed by MIS Pratk Buildcon. I. following technical professionals are appointed b) Owner I Promoter :- (I) hri. Dhananjay B. Doifode.as L.S. I Architect; (ii) Shri. Abbay Patil. as Structural Consul tam. Based on Site Inspection, with respect to each of the Building/\\ling or the aforesaid Real Estill Project, I certify that as on the date of this certificate. the Percentage of Work done for each o the building/Wing of the Real Estate Project as registered vide number -under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building AB.CD& AB Type Row house and Overall Percentage of work done withrespect to each Building/Wing is detailed in the Table B. Table A Building's AB & CD • Percentage of work done Sr. No Tasks /Acthity Excavation 100% I Plinth 100% 2 '.) 01 Still Floor 75% 6 number of Slabs of Super Structure 100 o/o 4 50% s Internal walb. Internal Plaster, Floorings within Flats/Premises, Doors and \Vindnws to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises. Electrical Fittings within the Flat/Premises Staircases. Lifts Wells and Lobbies at each .is% 8 Floor level connecting Staircases and Li fls, Overhead and Underground Water Tanks The external plumbing and external plaster. 60 o/o 9. elevation. completion of'terraces with waterproofing of the Building'\Ving. 10 Installation oflifts, water pumps. Fire Fighting Fillings 00 °/o and bquipment as per CFO NOC. Electrical linings to Common Areas, electro. mechanical equipment, Compliance to conditions of environment 1CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Buildingl\Ving. Compound \Vall and all other req uirements as may be required to Obtain Occupation /Completion Ccnificate Table A AB TYPE RO\V HOUSE Percentage of work done Sr. No Tasks /Acth~ty Excavation 100% 1 2 Plinth 100% '~. 00 Stilt Floor N.A. 4. 02number of Slabs of Super Structure 100% 5. Internal walls, Internal Plaster, Floorings within Flats/Premises, 50% Doors and Windows to each of the Flat/Premises Sanitary Fittings within ihe Flat/Premises, 10% 6. Electrical Fittings within the Flat/l'remises Staircases. and Lobbies at each 45% 7 Floor level connecting Staircases and . Overhead Water Tanks. The external plumbing and external plaster. 60% 8. elevation. completion of terraces with waterproofing of the Building/Wing. TAHLE·B (Internal & External Development Works in Respect of'the entire Registered Phase) • S.00 Common areas and Facilities, Proposed Percentage of Del ails Amenities (Yes/No) Work done I. Internal Roads & Foothpaths YES 00% Concrete road. 2. Water Supply YES 50 o/o 13} borewell&well. 3. Sewarage (chamber. YES 00% Septic lank. lines, Septic Tank, STP) 4. Storm \Va1cr Drains N.A. N.J\. N.A. s. Landscaping & Tree YES 00% Open space. Planting 6. Street Lighting YES 00% Along the road. 7. Community Buildings N.A. N.A. N.A. 8. Trcaunem and disposal NA. N.A. N.A. • of sewage and sullage water 9. Solid Waste management N.A. N.A. N.A. & Disposal 10. Rainwater harvesting YES 00% To the borcwell. 11. Energy management N.A. N.A. N.A. 12. Fire protection and lire YES. 00% AS per Rule. safely requirements 13. Electrical meter room. YE~. 30% Dp provided. 14. Others (Option Lo Add more) ARCHITcC't Mr. Ohananiav ~Rg~\lodo a J.l\Cli.ll.,. c·~rio13"0tlt 4 Ga~~: nn1~1;1:~~\::;;n~aba6 1 Yours FailhfuUy AR. Dl li\NA}JJA Y B. DOIFODE. (License No· Ci\110 I 3160839) •