FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- BuildinglWing wise) Date: 28/07/2017 To Parthraaj Developers Pvt. Ltd. Ajinkya Bungalow, Bhagya Nagar, Jalna Subject: Certificate of Percentage of Completion of Construction Work of Building(s) --- Wing(s) of Indradhanu A, [to be registered in RERA] situated on the Plot bearing Plot No. 454 & 455, demarcated by its boundaries (latitude and longitude of the end points) 19° 50' 44.54" North and 75° 15' 22.91" East to the North - Plot no .456, South - Plot No. 443 to 445, East - Plot No. 453, West - Plot No. 439 to 441, SECTOR-G.C.I,CIDCO WALUJ MAHANGAR-1, taluka Aurangabad District Aurangabad PIN 431002 admeasuring 1573.00 sq.mts. area being developed by Parthraaj Developers Pvt. Ltd. Sir, We Samil Architects have undertaken assignment as Architect ILicensed Surveyor of certifying Percentage of Completion of Construction Work of the A buildings of the Project, situated on the Plot bearing Plot No. 454 & 455, SECTOR-G.C.I,CIDCO WALUJ MAHANGAR-1, taluka Aurangabad District Aurangabad PIN 431136 admeasuring 1573.00 sq.mts. area being developed by Parthraaj Developers Pvt. Ltd. 1. Following technical professionals are appointed by Owner I Promoter :- i. Mlsl SAMIL ARCHITECTS (Ar. Sameer Ausekar) (Reg. No CA - 95/19301), Aurangabad as L.S. I Architect; ii. M/s CORE CONSULTANTS (Er. Rajesh Vargantwar), Aurangabad as Structural Consultant. iii. M/s/ SAMIL INTERIORS ( Er. Milind Wadekar) (Reg. No 152/92)" Aurangabad as Consulting Engineer. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each 0 the building/Wing of the Real Estate Project as registered vide number [ to be registered in RERA]-under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building A and Overall Percentage of work done with respect to each Building is detailed in the Table B. Table A Building A to be prepared separately for each Building /Wing of the Project) Residential APARTMENT Building Percentage of Sr. No Tasks IActivity work done 1 Excavation 100 % 2 1 Number of Plinth 100 % 3 o Number of Basement Floor 0% 4 1 Number of Stilt Floor 100% 5 7 Number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, 6 100 % Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises, Electrical Fittings within 7 100 % the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each 100 % The external plumbing and external plaster, elevation, completion of 9 100 % terraces with waterproofing, of the BuildinglWing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 10 environment /CRZ NOC, Finishing to entrance lobby/s, plinth 100 % protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. No. Common areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done 1. Internal Roads No 0% Only Paved surface & Footpaths in Tremix Concrete No Foot Paths 2. Water Supply Yes 50% Through Bore well & CIDCO Supply 3. Sewerage (chamber, lines, Septic Yes 100% Chambers, Tank, STP) Drainage lines Septic Tank. No STP 4. Storm Water Drains No 0% 5. Landscaping & Tree Planting Yes 0% As per drawings of Consultants 6. Aggregate Area Of Recreational No 0% --- open Space 7. Street Lighting No 0% As per drawings of Consultants 8. Community Buildings No 0% 9. Treatment and disposal Yes 100% Septic Tank to be of sewage and sullage water provided 10.. Solid Waste management No 0% & Disposal 11. Water conservation, Rain Yes 100% As per drawings of water harvesting Consultants 12. Energy management No 0% 13. Fire protection and fire safety Yes 100% As per drawings of requirements Consultants 14. Electrical meter room, sub-station, receiving station Yes 20% As per drawings of Consultants 15. Others Compound Wall & Entrance Gate Yes 100% As per drawings of Consultants