Amrish Joshi And Associates • Architect OFF :- Shop No. 52, Gr. FI. Reg. No. CA-95/18650 Jai Tower Padampura, • Approved Valuer Rly. stn. Road, Aurangabad . Regd. No. F-20882 Off. : 0240-2352555 FORM 1 [see Regulation 3] Date : ~, 0 ~'POtr ARCHITECT'S CERTIFICATE TO, MIS TOWN CONSTRUCTION THRU ITS PARTNER SHRI RADHESHYAM DNYANBARAO DAVHALE Subject: Certificate of Percentage of Completion of Construction Work of COMMERCIAL & RESIDENTIAL APARTMENT "TOWN IMPERIA" Building IPhase of the Project [RERA Registration Number] Situated On The Plot .No.76,94a,95 Gut No 14/P At Village Kanchanwadi Tq & Dist Aurangabad. Demarcated By Its Boundaries (Latitude And Longitude Of The End Points)14.00m To The North 37.55.M To The South 38.50.Mto The East 41.25.M.,On The West Of Gut.No 14/P Village Kanchanwadi Taluka Aurangabad District Aurangabad PIN-431005 Admeasuring 955.85 Sq.Mts. Area Being Developed By MIS TOWN CONSTRUCTION THRU ITS PARTNER SHRI RADHESHYAM DNYANBARAO DAVHALE Sir, 1/ AR.AMRISH JOSHI have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the APARTMENT Building / Phase of the Project, situated on the plot bearing C.N. No/CTS No.!Survey no.! Final Plot no76,94A,95 of Division KANCHANWADI village AURANGABAD taluka AURANGABAD District AURANGABAD PIN-431005 admeasuring 995.85 sq.mts. area being developed by MIS TOWN CONSTRUCTION THRU ITS PARTNER SHRI RADHESHYAM DNYANBARAO DAVHALE 1. Following technical professionals are appointed by Owner / Promoter :- i)1M/s/Shri/Smt AMRISH JOSHI as L.S. / Architect; (ii) MIs /Shri A.S.PATIL as Structural Consultant. (iii) MIs /Shri I P.C SHELKE as Site Supervisor Based on Site Inspection, with respect to each of the BuildinglWing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each 0 the buildinglWing of the Real Estate Project as registered vide number _______ -under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building Wing and Overall Percentage of work done with respect to each BuildinglWing is detailed in the Table B. Table A Building "TOWN IMPERIA" Sr. Tasks IActivity Percentage No of work done 1 Excavation 100% 2 ONE number of Basement(s) and ONE Number of Plinth 100% 3 o number of Podiums NIL 4 1 NUMBER OF Stilt Floor 100% 5 6 NOS.number of Slabs of Super Structure 100% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 85% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 40% Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 40% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of 30% terraces with waterproofing of the BuildinglWing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 25% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, pavingof areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to Obtain 11 Overall Percentage of work done Occupation /Completion Certificate 78% TABLE-B Internal & External Development Works in Respect of the entire Registered Phase s.no Common areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done 1. Internal Roads & Foothpaths --NA-- -NA- --NA-- 2. Water Supply YES 100% BOREWELL 3. Sewarage (chamber, YES 25% MUNICIPAL lines, Septic Tank, STP) DRAINAGE LINE 4. Storm Water Drains ---NA--- ---NA-- -NA--- 5. Landscaping & Tree ---NA---- ---NA-- --NA---- Planting --NA-- -NA- --NA-- 6. Street Lighting -NA-- . --NA-- -NA- 7. Community Buildings -NA-- --NA-- -NA--- 8, Treatment and disposal ---NA--- ---NA-- --NA---- of sewage and sullage water 9. Solid Waste management -NA--- ---NA-- --NA-- & Disposal 10. Water conservation, Rain YES 25% WORK IN water harvesting PROGRESSS 11. Energy management ---NA-- --NA-- ---NA--- 12. Fire protection and fire --NA-- -NA-- ---NA--- safety requirements -NA- --NA-- -NA-- 13. Electrical meter room, YES 25% WORK IN sub-station, receiving station PROGRESSS 14. Others ( Option to Add more) Yours Faithfully ARAMRISH JOSHI ARCHITECT AMRISH JOSHI CAJ95/18650