CORE CONSULTANTS Structural Consultants & Chartered Engineers Plot No. 206, Office No.9 & 10, 3rd Floor, ' Krishna Arcade', Opp.Shri Krishna Hospital, Samarth Nagar, Aurangabad. 431 DOL Ph.: 0240 6602529. Email: vargantwar@gmail.com FORM 2 [See Regulations 3J ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project Wise) Date: 30.07.2017 To, MIS. Amrut Developers Subject: Certificate of Cost Incurred for Development of "Amrut Developers", for Construction of 17 Flats ina Building and 8 Row Houses of "Amrut Sai Kalpavruksh Ph- I", Project situated on land Plotno. 65 to 68, Gut No.111, Tisgaon. AURANGABADdemarcated by its boundaries: North: Plot No.64 South : Plot No.69 East : Plot No. 74,75,76,77 West : 7.00Mtrs wide road of Division - AURANGABAD, Viliage-Aurangabad,Taluka - AURANGABAD, District. - AURANGABAD, Pin - 431001, admeasuring 1500.00 Sq. Mtrs., Areabeing developed by MIS. Amrut Developers, REF: RERA Registration Number APPLIED. 1 RAJESH~AN1'NAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 Sir, We M/s. Core Consultants, have undertaken assignment of certifying Estimated Cost for the Subject, Real Estate Project proposed to be registered under RERA, being Construction of a Building of "Amrut Sai Kalpavruksh Ph -I", Project situated on land Plot no. 65 to 68, Gut No.111, Tisgaon, AURANGABAD of Division AURANGABAD ,village- Aurangabd, Taluka and District - Aurangabad, Pin - 431001, admeasuring 1481.83Sq.Mtrs. Area being developed by M/SAmrut Developers. 1. Following technical professionals are appointed by Owner/ Promoter:- (i) Shri. Ganesh Mharolkar as L.S./ Architect; (ii) M/ s. Core Consultants as Structural Consultants. (iii) Shri. Ganesh Mharolkar as MEP Consultant (iv) M/ s. Core Consultants as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil MEP and Allied Works, of the Buildings(s) of this project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by 2 RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 M/S. Core Consultants quantity Surveyor, appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 3,21,00,000/-. (Total Built Up Area - 1481.83 Sq. Mtrs.). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building(s) form the AMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 2,75,00,000/-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/ Completion Certificate from Aurangabad Municipal Corporation is estimated at Rs. 46,00,000/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below. 3 RAJESH~NTWAR STRUCT~~~~SULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 TABELA 1. Building (to be prepared separately for each building/ wing of the Real Estate Project) Sr. No. Particulars Amount 1. Total Estimated cost of the building Rs. 3,21,00,000/- 2. Cost Incurred as on 30.07.2017 (Based on Rs. 2,75,00,000/- the Estimated Cost) 3. Work Done in Percentage 85.67 % I I (as percentage of the estimated cost) 4. Balance Cost to be Incurred Rs. 46,00,000/- (Based on Estimated Cost) 5. Cost Incurred on AdditionaIj Extra Items Rs.OO/- as on 30.07.2017 not included in the Estimated Cost (Annexure-A) RAJESH VARGANTW AR STRUCTURAL CONSULTANT & CHARTERED ENGINEER 4 REGN. No. AM 80095/6 • TABEL B (to be prepared separately for each building / wing of the Real Estate Project) Sr. No. Particulars Amounts 1. Total Estimated cost of the Internal and Rs.OO/- External Development works including amenities and Facilities in the layout as on 30.07.2017. Date of Registration is applied Cost Incurred as on 30.07.2017 2. Cost Incurred as on 30.07.2017 (based on Rs.OO/- the Estimated Cost) Work done in percentage 0% 3. (as percentage of the estimated cost) Rs.OO/- Cost Incurred on Additional/ Extra Items as on 30.07.2017 not included in the estimated cost (Annexure-A) Yours faithfully For, RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 5 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (8) and in case quantity are being calculated by officer of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure-A List of Extra/ Additional Items executed with cost (which were not part of the original Estimate of Total Cost) RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80090/6 6 CORE CONSULTANTS Structural Consultants & Chartered Engineers Plot No. 206, Office No.9 & 10, 3rd Floor, ' Krishna Arcade', Opp.Shri Krishna Hospital, Samarth Nagar, Aurangabad. 431001. Ph.: 0240 . 6602529. Email: vargantwar@gmail.com FORM 2 [See Regulations 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project Wise) Date:30.07,2017 To, MIS. Amrut Developers Subject:Certificate of Cost Incurred for Development of "Amrut Developers", for Construction of 12 Flats ina Buildingand 8 Row Houses of "Amrut Sai Kalpavruksh Ph - II", Project situated on land Plot no, 69 to 71, Gut No.111,112 Tisgaon, AURANGABAD demarcated by its boundaries: North :Plot No.68 South :15.00 mtrs wide road East :Plot No. 72,73 police cowki West :7,00 Mtrs wide road of Division - AURANGABAD, Village-Aurangabad, Taluka - AURANGABAD, District - AURANGABAD, Pin - 431001, admeasuring 1245.62 Sq. Mtrs, Area being developed by MIS. Amrut Developers REF: RERA Registration Number APPLIED. ~ 1 RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 Sir, We M/ s. Core Consultants, have undertaken assignment of certifying Estimated Cost for the Subject, Real Estate Project proposed to be registered under RERA, being Construction of a Building of "Amrut Sai Kalpavruksh Ph - II", Project situated on land Plot no. 69 to 71, Gut No.l l l, Tisgaon, AURANGABAD of Division AURANGABAD .village- Aurangabd, Taluka and District _ Aurangabad, Pin - 431001, admeasuring 1241.51 Sq. Mtrs. Area being developed by M/S Amrut Developers. 1. Following technical professionals are appointed by Owner/ Promoter:- (i) Shri. Ganesh Mharolkar as L.S./ Architect; (ii) M/s. Core Consultants as Structural Consultants. (iii) Shri. Ganesh Mharolkar as MEP Consultant (iv) M/ s. Core Consultants as Quantity Surveyor. 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil MEP and Allied Works, of the Buildings(s) of this project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by ~ 2 RAJESH VARGANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 M/S. Core Consultants quantity Surveyor, appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 2,25,00,000/- (Total Built Up Area _ 1241.51 Sq. Mtrs.). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building(s) form the AMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 1,95,00,000/ -. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/ Completion Certificate from Aurangabad Municipal Corporation is estimated at Rs. 30,00,000/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below. 3 RAJES~ANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 TABELA 1. Building (to be prepared separately for each building/ wing of the Real Estate Project) Sr. No .. Particulars Amount 1. Total Estimated cost of the building Rs. 2,25,00,000/- 2. Cost Incurred as on 30.07.2017 (Based on Rs. 1,95,00,000/- the Estimated Cost) 3. Work Done in Percentage 86.67 % (as percentage of the estimated cost) 4. Balance Cost to be Incurred Rs.30,00,000/- . (Based on Estimated Cost) 5. Cost Incurred on Additionalj Extra Items Rs.OO/- as on 30.07.2017 not included in the Estimated Cost (Annexure-A) RAJE~GANTWAR STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 4 • TABELB (to be prepared separately for each building / wing of the Real Estate Project) Sr. No. Particulars Amounts 1. Total Estimated cost of the Internal and Rs.OO/- External Development works including amenities and Facilities in the layout as on 30.07.2017. Date of Registration is applied Cost Incurred as on 30.07.2017 2. Cost Incurred as on 30.07.2017 (based on Rs.OO/- the Estimated Cost) Work done in percentage 0% 3. (as percentage of the estimated cost) Rs.OO/- Cost Incurred on Additional! Extra Items as on 30.07.2017 not included in the estimated cost (Annexure-A) Yours faithfully For, STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 5 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/ Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (8) and in case quantity are being calculated by officer of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred to be incurred. 5.All components of work with specifications are indicative and not exhaustive. Annexure-A List of Extra/ Additional Items executed with cost (which were not part of the original Estimate of Total Cost) RAJESH VARGANTWAR . STRUCTURAL CONSULTANT & CHARTERED ENGINEER REGN. No. AM 80095/6 6