Ar. Ganesh Mharolkar CAl2001/27254 203, 2nd Floor, Shankar Plaza, Sahakar Nagar Chowk, Architects • Interior Designers Opp, Bankof Baroda,DargahRoad, Aurangabad- 431 005 Ph.: 0240-2346644, 2970299 Cell:9423149144 E-mail; space'arabd@gmaiLcom FORM 1 [See Regulations 3] ARCHITECT'S CETIFICATE (To be submitted at the time of Registration of Ongoing Prolect and for withdrawal of money from Designed Account- Building! Wing wise) Date: 25..07.2017 To, MIS Amrut Developers. Labh Chambers, Station Road, Aurangabad. Subject Certificate of Percentage of Completion of Construction work of Residential Building of the project "Amrut Kalpawriksha i (RERA Regulation Number: NEW II APPLICATION) situated on plot nos. 65,66,67}6B, Gut no. 110-112,Waluj, ALirangabad demarcated by its boundaries North: plot no. 64 South: plot n.o.69 East: plot nos. 74,75}6,77 West 7.00 M. wide Road. Division AURANGABAo., ViliageAURANGABAD" taluka AURANGABAD, Olstrict AURANGABAD, Pin 431001, admeasuring 1500.00 Sq. M{rs. Area being developed by MIs. Amrut Developers. Sir, I Ganesh Mharolkar have undertaken assignment as an Architect of Certifying Percentage of Completion of Construction Work of the Residential Buildings of the ot the project "Amrut Kalpawriksha.i" of Division AURANGABAD, Village.AURANGABAD, taluka AURANGABAD , District AURANGABAD, Pin 431005, admeasuring 1481~83Sq. Mtrs. Area beIng developedby MIs. AmrutDevelopers. ~ ~l~ qanesli 9dliaro~aT ARCHITECT CAl 200 1/27254 1. Following technical professionals are appointed by Ownerl Promoter:- (i) Shri GANESH MHAROLKAR as an Architect; (ii) Shri Raiesh B. Vargantwar as Structural Consultant. (HI) Shri S.M. Gunjal as Plumbing Consultant. (iV) Shri Sunil Jadhav as site supervisor. Based on Site Inspection, with respect to each of the Building! Wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the Percentage of work done for each of the building/ Wing of the Real Estate Project as registered vide number NEW PROJECT APPLICATION under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building and Overall Percentage of work done with respect to each Building/ Wing is detailed in the Table B. ~~-, - qanesn 9rt.liaro£iJzr ARCHITECT CAj2001j27254 TABLE A 01 Building (To be prepared separately for each Building! Win_g_ofthe Project) Sr. No. Tasks/ Activity Percentage, of Work Done 1. Excavation 100 2. 1 Number of Plinth 100 3. o Number of Podiums NA 4. 1 Stilt Floor 1'00 5. 04 Numbers of Slabs of Super Structures. 100 6. Internal Walls, Internal Plaster, Floorings within Flatsl 70 Premises, Doors and W'indows to each of the Flat! Premises 7. Sanitary Fittings within the Flat! Premises, 70 Electrical Fittir}9_swithin the Flat! Premises 8. Staircase, Lifts Wells and Lobbies at each Fioor level 90 connecting Staircase and Lifts, Overhead and , Underground Water Tanks 9. The External Plumbing and external plaster, elevation, 100 completion of terraces with waterproofing (i)f the buildin.gI wir}g, 10. Installation of lifts, water pumps, fire Fighting Fittings and 90 Equipment as per CFP NOe, Electrical fittings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment! CRZ NOC, Finishing to entrance lobby, Plinth Protecti:on, pavin-gof areas appurtenant to BUllding/ Wing, Compound wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate. ganesli 9tlliaro{fta7 ARCHITECT CA/2001/27254 4 TABLE B Internal and External Development Works in the respect of the entire Regi·stered Phase Sr Common Areas and Facilities Proposed Percentage of Details Amenities (Yesl No) Work Done 1 Internal Road & Footpaths NO 00 NA 2 Water Supply YES 100 COMPLETED 3 Sewerage (Chamber, Lines, Septic YES 90 IN Tank, STP) PROGRESS 4 Storm Water Drains NO 00 NA 5 Landscaping & Tree Planting YES 80 IN PROGRESS 6 Street Lighting NO 00 NA 7 Community Buildings NO NA NA 8 Treatment and disposal of sewage NO NA NA and sullage water 9 Solid Waste Management &. NO NA NA Disposal 10 Water conservation, Rain Water YES 60 IN harvesting PROGRESS 11 Energy Management NO NA NA 12 Fir~ protection and fire safety NO. 'NA NA requirements 13 Electrical meter room, sub-station, NO NA NA receiving stanon 14 Others (Option to Add more) Yours faithfully ~l~ - - GANESH MHAROLKAR Architect qanesli !Mliaro{k_a ARCHITECT .(CAl200 1/27254) CA/2001/27254 1 Ar. Ganesh Mharolkar CAl20Q1127254 Architects • Interior Designers 203, 2nd Floor, Shankar Rlaza, Sahakar Nagar Chowk. Opp. Bankof Baroda,Oargah Road, Aurangabad, 431 005 Ph.: 0240-2346644. 2970299 Cell:9423149144 E-mail: spacearabd@gmail.com FORM. 1 [See,Regulations 3] ARCHITECT'S CETIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of money from Designed Account- Building! Wing wise). Date: 25.07.2017 To, MIS Amrut Developers. Labh Chambers, Station Road, Aurangabad. Subject: Certificate of Percentage of Completion of Construction work of Residential Building of the project "Am rut Kalpawriksha ii n (HERA Regulation Number: NEW APPLICATION) situated on plot nos, 69,70,71 Gut no. 11.0-112,Waluj, Aurangabad demarcated by its boundaries North: plot no. 68 South: plot no. 15.0 m wide road East: plot nos, 72, 73i Police Chowki West 7.00 M. wide Road. Division AURANGABAD, Village AURANGABAD, taluka AURANGABAD, District AURANGABAD, Pin 431001, admeasuring 1245.62 Sq. Mtrs. Area being developed by Mis. Amrut Developers. Sir, I Ganesh Mharolkar have undertaken assignment as an Architect of Certifying Percentage of Completion of Construction Work of the Residential Buildings of the of the project "Amrut Kalpawriksha ii "of Division AU RANGABAD , Village AURANGABAD, taiuka AURAN~ABAD District AURANGABAD, Pin 43100'5, admea~u. I 1241.51 Sq. Mtrs. Area beIng developed by MIs. Amrut Developers. ~. llw _ <= ganes" ~fi4rofi.!zr ARCHITECT CAl 200 1/27254 1. Following technical professionals are appointed by Ownet/ Promoter- (i) Shri GANESH MHAROLKAR .as an Architect; (ii) Shri RaJesh B. Vargantwar as Structural Consultant. (iii) Shri S.M. Gunj:al as Plumbing Consultant, (iv) Shri Sunil Jadhav as site supervisor. Based on Site Inspection, with respect to each of the Building/ Wing of the aforesaid Real Estate project, I certify that as on the date of this cerfificate, the Percentage of work done for each of the building/ Wing of the' Real Estate Prolect as registered vide number NE:W PROJECT APPLICATION under RERA is as per table A herein below. The percentage of tHe work executed with respect to each of the major activity of the Building arid Overall Percentage of work done with respect to each Building/Wing is detailed in the Tabl-eB. ~I~~ qanesli !M.Jiaro~r ARCHITECT CA/2001/27254 TABLE A 01 Building (To be_Qrepared se_Qaralely for each Buildin_w Wing of the Project) Sr. No. Tasks/ Activity Percentage of Work Done 1. Excavation 100 2. 1 Number of Plinth 100 3. o Number of Podiums NA 4. 1 SUItFloor 100 5. 04 Numbers of Slabs of Super Structures. 100 6. Internal Walls, Internal Plaster, Floorings within Flats/ 100 Premises, Doors and Windows to each of the Flat! Premises 7. Sanitary Fittings within the Flat! Premises, 100 Electrical Fittings within the Flat! Premises 8. Staircase, Lifts Wells and Lobbies at each Floor I.evel 100 connecting Staircase and Lifts, Overhead and Underground Water Tanks 9. The External Plumbing. and external plaster, elevation, 100 completion of terraces with waterproofing of the building I wing, 10. Installation of lifts, water pumps, fire Fighting Fittings and 100 " Equipment as per CFP NOC, Electrical fittings to Common Areas, Electro, Mechanical equipment, Compliance to conditions of environment! CRZ NOC, Finishing to entrance lobby, Plinth Protection, paving of areas appurtenant to Building/ Wing" Compound wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate. qanesli 9dliaro~r ARCHITECT CA/200 1/27254 TABLE B . Internal and External Development Works in the respect of the entire Registered Phase Sr Common Areas and Facilities Proposed Percentage of Details Amenities (Yes! No) Work Done 1 Internal Road & Foo!Q_aths NO 00 NA I 2 Water Supply YES 100 COMPLETED 3 Sewerage (Chamber, Lines, Septic YES 100 COMPLETED TankL STP) 4 Storm Water Drains NO 00 NA 5 Landscaping & Tree Planting YES 80 IN PROGRESS 6 Street Lighting NO 00 NA 7 Communi!Y_Buildifl9_s NO NA NA 8 Treatment and disposal of sewage NO NA NA and sullage water 9 Solid Waste Management & NO NA NA ois_Q_osal 10 Water conservation, Rain Water YES 100 COMPLETED harvesting 11 ~ner_gyManagement NO NA NA 12 Fire protection and fire safety NO NA NA requirements 13 Electrical meter room, SUb-station, NO NA NA receivin_g_station 14 Others (Option to Add morel Yours faithfully ~h, GANESH MHAROLKAR (ja~n 9,tharoli.!Lr Architect ARCHITECT (CAl2001/27254 ) cA/2001/27254