.{ ,h6 ENGINEER'S CERTIFICATE [)ate: 30 I 0312018 To Devanshi Builders And Land Developers, Shop NO 12, Padampura Circle, Aurangabad .431001 Subject : Certificate of Cost incurred for Development of Silver Park C -'l'ype Building arrcl to be registered in RERA situated on Plot no 03 .Gut no. 5211 (ParI ) Wadgaon Kholhati . Walui , Cidco , Mahanagar -1 , Aurangabad. Demarcated by its boundaries. (latitude and longitude of the end points ) North - 18 mts wide Cidco main road. South - Gut no 47 (part) of village Wadgaon Kholathi. Ilast - Plot no 02. West - Plot no 04. adnieasuring43l.095 Sq. Mts. Area Bearing developed by M/s Devanshi Builders and Land Developers. On Gut no.5211 (Part ) Wadgaon Kholathi . Walu.j , Cidco. Mahanagar -l Aurangabad. admeasuring 431.095 Sq. Mts. Area Bearing developed by M/s Devanshi Builders and L,and Developers Sir, I/We A.S.Patil have undertaken assignment of certifying Estimated Clost lbr the Sub.iect Rcal Estate Project proposed to be registered under RERA being Silver Park c -T'ype Building and situate on Plot no 03 ,Gut no. 5211 (Parr ) Wadgaon Kholathi . Waluj . Cidco " Mahanagar -l Aurangabad admeasuring 1029.561 sq.mt. area being developed by M/s Kamakshi Ruilders and [,and Developers. 4. F'ol lowing technical professionals are appointed by Owner/Promoter : - x) Mr. Mr, R.S. Jadhav ( .lB Associates Aurangabad)"as [..s./ Architcct. xi) Mr. Mr. A.S.Patil Aurangabad as structural consultant, xii) Mr. Vithal A . Dongre. Aurangabad as Site Superviser.s have estimated the cost of the completion to obtain Occupation certit'icatel Completion ificate, of the Civil, MEP and Allied Works, of the Buildings of the Project. OLrr ted cost Calculations are based on the Drawinss/Plans made available to us fbr the proiect under reference by the Developer and consultants and the schedule o items and Quantity for the entire work as calculated by --- euantity Survivor* appointed by Developer/ Engineer, and the assumption of the cost for material, labour and other inputs ma de by developer, and the site inspection carried out by us 3'we estimate total Estimated cost of completion of the c -Type building of the aforesaid project under reference as Rs.75.362 ( seventy Five Lakh Thirty six Thousand Two Hundred Only. ) The estimated Total cost of project is with reference to the civil, MEp and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building(S) from the cIDCo, being the planning Authority under whose jurisdiction the aforesaid project is being implemented . 4'The Estimated cost Incurred till date is calculated for c -Type Building till date is calculated at Rs' 78'02 Lah'h (Rs Seventy Eight Lakh And Two Thousand only) amount of Estimated cost incuned is calculated on the base of amount of total Estimated cost. the amount of Estimated cost incurred is calculated on the base of amount oftotal Estimated cost. 5'The Balance cost of completion of the civil, MEP and Ailied works of the c -Type Building of the subject project to obtain occupation certificate/completion certificate from cIDCo, (planning Authority) is estimated at Rs 2.658 Lakh (Rs. Two Lakh And Six Hundred Fiftv Eight) 6' I certify that the cost of the civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B Below. Table A ((C" - Building bearing FIat no. 0l to 10 and Shop 01 to 04 (to be prepared separately for each Buildine of the Real Estate project) Total Estimated cost of tn Rs 75.362 Lakh Registration is Cost incurr"O ur o Work done in Percentage 1as Balance cost to be incuned@ Cost Incurred on Additi not included in the estimate cost (Annexure_A) TABLE _B "C'( - Building bearing Flat no. 0l to l0 and Shop 01 to 04 (to be prepared separately for each Buildine of the Real Estate project) Total Estimated cost of the i Rs. 18.225lakh works including amenities and facirities in the rayout as on on 3l/12/2017 date of Registration is Cost incu*ed as on 3ll12l2 Rs 15.58 Work done in Percentage 1a Balance cost to be incuned@ Cost Incurred on Additio included in the estimate cost (Annexure-A) /6Fryh ffl |{ E77.eD u,:rro. \"9 l'it A \r.roiro. zsorri _i' (?,"*W + Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate, 2, (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible forthe quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred, 5, All components of work with specifications are indicative and not exhaustive, Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost) Yours F'aithfully Signature of Engineer ABfIAY PATIL s. E. ( c[Vtuhe$ d,(Fa?/ssfr re s],