PRADEEP V. MOTE * OFFICE (BE CIVIL M.TECH.(STRU.) SHANKARA RESIDENCY Reg. No. DDMMCB/R/2021/APL/O1141 PLOT NO. 215/216, SHOP NO. 05, * R.C.C. CONSULTANT ULKANAGARI, GARKHEDA, * STRUCTURAL ENGINEER AURANGABAD. * CONSULTING ENGINEER Mo. No. 9422213027, 8855844438. FORM-2 [. See Regulation 31 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of On going Project and for withdrawal of Money from Designated. account - Protect Wise) Date: 24/05/2023 To TIRUPATI BUILDCON Subject: Certificate of Cost [incurred for Development of SAl NAKSHATRA for Construction of 12 Flats Situated on Plot bearing A64, GUT NO 32/2, BRIJWADI, UTTARA NAGARI, AURANGABAD having MahaRERARegistration Number P51500006317 being developed by TIRUPATI BUILDCON. Sir I/we .undertaken assignment of certifying Estimated Cost for having MahRERARegistrationNumberP51500006317(only applicable after project Registration being developed by TIRUPATIBUILDCON 2. We have estimated the cost of Civil, MEP and allied workS required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in attachment of sale. Our estimated cost calculations are based on the available made available tous for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity surveyor* appointed by Developer Engineer. the assumption to the cost of material. labour and other inputs mad by developer. and the site inspection carried out by us toascertain / confirm the above an alysis given to us. 3. We estimate Total Estimated Cost of' completion of the aforesaid project under reference at Rs 10211500/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of Project is with references to the Civil, MUP and Allied works required for completion of the apartments and Proportionate complication of internal externalworks. As per specifications mentioned in agree ment of sale and For the purpose of obtaining occupation certificate /completion certificate for the Building(s)/Wing(s) r Layout / Plotted Development from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4.The Estimated Cost Incurred till date is calculated at Rs. 10211500 (Total of Table Aand B) the: amount of Estimated Cost incurred is calculated on the basis of input materials/servies usgd and unit cost of this items. PRADEEP \. MOTE Regd.No. MCB/R/2018/APL/CO137 Structural Engineer Plot No.212&216, Shankara Residency, Ulkanagari, Garthada, Aurangabad.Mob.9422213027 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completicon of the apartments and Completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs. O/- (Total of Table Aand B) 6. Icertify that the Cost of the Civil, MEP and allied work for the apartments and proportionate and internal &External works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table Aand B) below: TABLE-A 12 Flats called as SAI NAKSHATRA(To be prepared separately for each building /Wing / layout /Plotted Development of the Real Estate Project) Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building/Wing/ Layout / Plotted 10211500/ Development as on date of Registration is 2 Cost increed as on date of certificate 10211500/ 3 Work done in Percentage (as Percentage of the estimated cost) 100% 4 Balance Cost to be incurred** (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-B Internal&External Development Works in Respect of the Registered Phase Sr Particulars Amount (in Rs.) No 1 Total Estimated Cost of the Internal and External Development 10211500 Works including amenities and Facilities in 2 Cost incurred as on date of certificate 10211500 3 Work done in Percentage (as Percentage of the estimated cost) 100 4 Balance Cost to be incurred** (Based on Estimated Cost) Cost Incurred on Additional /Extra items not included in the Estimated Cost (Table -C) Yours Faithfully, Agreed and Accepted by: TIRUPATIBUILDCON PRADEEP V. MOTE Regd.No. MCB/R/2018/APL/00137 Structural Engineer PARTNERS Plot No.212&216, Shankara Residency, Ulkanagari, Garkheda, Aurangabad.Mob.9422213027 Name:MRMAHADEO MORALE Date: Note: Real Estate Project as per drawings approved from 1 The scope of work is to complete Registered of sale. time to time and as per specifications mentioned in agreement Engineer or can be done by an independent Quantity 2. (-) Quantity surveycan be done by office of can be relied upon by the Engineer. In case of Surveyor. whose certificate of quantity calculated Developer, the name has to be mentioned at the independent quantity surveyor being appointed bycalculated by office of Engineer, the name of the being place marked (") and in case quantity are tioned Engineer, who is responsible for the guantity calculated should be men person in the office of at the place marked (") estimated Cost (1) may vary from Difference between Total 3. (**) Balance Cost to be incurred (4) etc. As this an in quantity required / escalation of cost and Actual Cost incurred (2) due to deviaticon Proje:ct will required for development of the Real Estate estimated cost, any deviation in quantity to be incurred. result in amendment of the cost incurred specifications are indicative and not exhaustive 5. All components of work with qualifications. Example: Any deviations in input material 6. Please specify if there are any deviations used from specifications in agreement of sale. TABLE-C in Cost List of Extra/Additional/ Deleted Items considered the original Estimate of Total Cost) (which were not part of Particulars Amount (In Rs.) Sr.no NA 1 2 NA PRADEEP V. MOTE Regd.No. MCB/R/2018/APL/00137 Structural Engineer Plot No.212&216, Shankara Residency, Ulkanagari, Garkheda, Aurangabad.Mob.9422213027