M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com FORM-2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 25.01.2025 To The Econ Developers Pune Subject: Certificate of Cost Incurred for Development of Shivar Project for Construction of 21 building(s) MahaRERA Registration Number- - P51500005733 situated on the Plot bearing C.N. No/CTS No./Survey no./ Final Gut no. 240/Part demarcated by its boundaries ( latitude and longitude of the end points) 19° 48’36.7” N 75°28’41.0”E to the North1_to the South 19° 48’31.3” N 75°28’43.1”E to the East 19° 48’35.7” N 75°28’44.5”E to the West 19° 48’33.2” N 75°28’38.2”E of division Aurangabad, Village Apatgaon, Taluka Aurangabad, Dist. Aurangabad, PIN – 431001 Admeasuring (9100 +9200) = 18300 sq.mtr area being developed by Econ Developers, Pune. Ref: MahaRERA Registration Number - P51500005733 Sir, I/ We Sandeep Godambe have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being 21 Building(s) situated on the plot bearing C.N. No/CTS No./Survey no./ Final Gut no 240/Part of division Aurangabad, Village Apatgaon, Taluka Aurangabad, Dist. Aurangabad, PIN – 431001 Admeasuring (9100 +9200) = 18300 sq.mtr area being developed by Econ Developers, Pune. M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri Prashant Pardeshi as L.S. / Architect ; (ii) Shri Ravindra Bansode as Structural Consultant (iii) Shri Prashant Pardeshi as MEP Consultant (iv) Shri Prashant Pardeshi as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Prashant Pardeshi quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 45942200/- ( Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Town planning/ Any other concern regional authorities Aurangabad being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 28858000/-(Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Town planning/ Any other concern regional authorities Aurangabad is estimated at approx.. Rs .17084000/- ( Total of Table A and B). M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABLE A Building or wing bearing no. E 1 & E 2. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 2740400 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 0 /- (based on the Estimated cost ) 3 Work done in Percentage 0 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 2740400 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no K1 – K 12. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 6028000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 6028000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. C. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 12000000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on 25.01.2025 Rs. 0 /- (based on the Estimated cost ) 3 Work done in Percentage 0 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 12000000 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. E 3 & E 4. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 2740400 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 0 /- (based on the Estimated cost ) 3 Work done in Percentage 0 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 2740400 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. J 1 & J 2. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 2103400 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 0 /- (based on the Estimated cost ) 3 Work done in Percentage 0 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 2103400 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. K 13, K 14, K 27 – K 30. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 3014000/- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 3014000/- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. K 15 – K 26. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 6028000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 6028000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. K 67 – K 70. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 2000000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 2000000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. G 1 & G 2. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 421000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 421000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. K 75 – K 84, F, D. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 6867000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 5867000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 1000000 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE A Building or wing bearing no. K 71 – K 74. (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 2000000 /- as on 25.01.2025 date of Registration is 2 Cost incurred as on25.01.2025 Rs. 2000000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 as on 25.01.2025 not included in the Estimated Cost (Annexure A) M/s. SANDEEP GODAMBE Engineers & Govt. Regd Contractor. Sr.No.116/6/1, Samarth Colony, Pashan Sus Road, Pune-411021. Ph. – 9021151151 . E-mail - sandeep.godambe@yahoo.com TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amount 1 Total Estimated cost of the Internal and External Rs. 3500000 /- Development Works including amenities and Facilities in the layout as on 25.01.2025 date of Registration is 2 Cost incurred as on 25.01.2025 Rs. 3500000 /- (based on the Estimated cost ) 3 Work done in Percentage 100 % (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 0 /- as on 25.01.2025 not included in the Estimated Cost (Annexure A)