Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir OsmanPura, Aurangabad. FORM 1[see Regulation 3] tl ARCHITECT'S CERTIFICATE rl (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:24/IO{2OI8 To M/s Devanand Narayanrao Kotgire (HUF) Disha Square Sutgirni Chowk, Garkheda Aurangabad 4310001 Subject: Certificate of Percentage of Completion of Construction Work of 3 No. of Building A1' A2, A3o B1 B2 of the Project DISHA KUNJABAI\ PHASE - I [Registration No. - P515000011081 situated on Gut No. 5212 part, Waluj Mahanagar - I, Wadgaon Kolhati' Aurangabad demarcated by its boundaries (latitude and longitude of the end points) To the North - 15 Mtr Wide DP Road To the South - Approach, Open Space & Building Cl To the East - 6 Mtr Approach & Part of Gut No. 52 To the West - Approach & Building Cl'C2 Of Division Aurangabad village Wadgaon Kolhati Waluj taluka Aurangabad District Aurangabad admeasuring 4885.22 sq.mts for Phase - 1 comprising Building Al A2, A3.-Bl B2 and Open Space for Approach & Building Cl, C2 is 493.37 sq. mtrs area being developed by Promoter lWs Devanand Narayanrao Kotgire GilIF) Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jatna Road, Aurangabad. Telefax: 0240 -245i616 Anand Building, Opp. Sant Eknath Rangmandir Osmanpura, Aurangabad. Sir, I Manish Kale Partner of AKW ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifring Percentage of Completion of Construction Work of the phase - I of the project comprising Al A2, 43, Bl 82 of the Project Disha Kunjaban, situated on the plot bearing Gut no Gut No' 52/2 part, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad admeasuring 4gg5.22 sq.mts. for Phase - 1 comprislng Building Al A2, ,A3, Bl B2 and Open Space for Approach & Buildin g C7, C2 is 493.37 sq' mtrs area being developed by Promoter IWs Devanand Narayarnao Kotgire GIIJF) 1. Following technical professionals are appointed by owner / promoter: - (i) AKW Associates as Architect; (ii) Core Consultants as Stmctural Consultant (iii) Shd Sachin Baburao Bagade as Site Supervisor Based on Site Inspection, with respect to each of Wing of the aforesaid Real Estate project, I certiS that as on the date of this certificate, the Percentage of Work done for phase - I comprising Building Al A2, 43, 81 82 of the Real Estate Project - Disha Kunjaban as registered vide number P51500001108 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. I !l Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir OsmanPura, Aurangabad. Table A DISHA KUNJABAN - PHASE l(Comprising Buitding Ll M, A3' B1 B2) S. No. Tasks / Activity Percentage of Work Excavation tOQo/o 7 X Number of Basement(s) and Plinth LOO% 2 X Number of Podiums NA 3 Stilt Floor LOO% 4 X number of Slabs of Super Structure 100% 5 Internal walls, tnternal Plaster, Floorings within Flats / 6 too% Premises, Doors and Windows to each of the Flat / Premise Sanitary Fittings within the Flat / Premises, Electrical 7 LOOTo Fittings with the Flat / Premises Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- too% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building LOO% / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to L0 98.5% entrance lobby/s, plinth protection, paving of area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the work done for the L7 98.25"' entire Building / Wing T T Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir Osmanpura, Aurangabad. TABLE-B Internal & External Development Works in Respect of the entire Registered phase DrsrrA KUNJABAII - PTTASE I (comprising Buildin g al M,A3, B1 B2) Common Areas and Facilities, Amenities Proposed Percentage of Details Completion Internal Roads and Footpath Yes LOO% RCC & Paver Blocks Water Supply Yes LOO% Cidco Water Connection Sewerage (Chamber, Line, Septic, Tank, STp) Yes roo% Chamber Line & Drainage Line Only Storm Water Drains NA Landscaping & Tree Planting Yes LOO% Regular Tree Plantation in Open Space Street Lighting Yes LOO% General Tube Lights Community Buildings NA Treatment and Disposal of Sewage and Sullage NA Water Solid Waste Management and Disposal NA Water Conversation, Rain Water Harvesting Yes LOO% Ground water recharge ofTerrace Water through Bore well Energy Management NA Fire Protection and Fire Safety Requirements NA Electrical Meter Room, Sub-station, Receiving Yes too% Completed Station Aggregate Area of Recreational Open Space Yes 98% Open Space Development is almost completed for the resistered Open Parking Yes 100% Completed Yours Faithfully ri For AKUV SSOC IATES Ar. MAI\-ISH V. KALE Ar luer Reg.No.CA -93/15610 Neg. No. cA/g3/15610 For AKW Associate"