SANJAY SITARAM NIMBALKAR N-S E-04-02 GULMPHAR COLONY,CIDCO 10 ,AURANGABAD PAN- AKOPN2284M ,MObile NO -9372233690 ---------------------------------------------------------------------------------- FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 29.1.2018 To The Directors Pride Ventures (I) Pvt Ltd Office No. 101 to 104 Sai Trade Centre Station Road Aurangabad 431001 Subject: Certificate of Cost Incurred for Development of [Pride Phonix) for Construction of 1. No. of Building "0" of the Project PRIDE PHOENIX BUILDING - "0" REGISTERNo- P51500000852] situated on Gut No. 736, behind Civil Hospital Jalna Road, Chikalthana, Aurangabad demarcated by its boundaries ( latitude and longitude of the end points) side margin to the North Mhada Plot & 9 Mtr. Road, to the South Side Margin and 24 Mtr.Road to the East Side Margin & Building Type C to the West of Division Aurangabad village Chikalthana taluka Aurangabad District Aurangabad PIN 431001 admeasuring 4495.67 sq.mts. for Building "D" and Open Space for "D" Building is 394.88 sq. mtrs Area and Club House Area 75.20 Sq. Mtr.being developed by Mis Pride Ventures (I) Pvt Ltd Sir, I Sanjay Sitaram Nimbalkar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under Maha RERA, being BUILDING PRIDE PHOENIX BUILDING - "D" situated on the plot bearing Gut No. 736 of Division Aurangabad village Chikalthana taluka Aurangabad District Aurangabad PIN 431001 admeasuring 4495.67 sq.mts. for Building "D" and Open Space for "D" Building is 394.88 sq. Area and Club House Area 75.20 Sq. Mtr.being developed by MIs Pride Ventures (I) Pvt Ltd Following technical professionals are appointed by Owner I Promoter:- i) MIs Nitin Bagdiya & Associates as Architect ii) MIs Core Consultant (Prop. Rajesh Wargantwar) as Structural Consultant iii) Shri Santosh Uttamrao Thorat as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the' Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Santosh Uttamrao Thorat Site Supervisor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 10,52,15,000.00 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.35,68,349.00 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completll:5nioNhe Civil;'MEP and Allied works of the Building(s) of the i subject project to obtain Occupation Certificate / Completion Certificate from Aurangabad Municipal Corporation (planning Authority) is estimated at Rs. 10,16,46,651.00 (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: SANJAY SITARAM NIMBALKAR N-5 E-04-02 G(J(.AA~liAR 'COLONY,aOCO 10 ,AURANGABAD PAN- AKOPN2284M ,Mobile NO -9372233690 ---------------------------------------------------------------------------------- TABLEA Pride Phoenix Building "0" Sr. No Particulars Amounts 1 Total Estimated cost of the building PRIDE PHOENIX - D as on Rs. 10,52,15,000.00 30.06.2017 is 2 Cost incurred as on 31.10.2017 (based on the Estimated cost) Rs.35,68,349.00 3 Work done in Percentage (as Percentage of the estimated cost) 3.39% 'II ".IID"; c t LI 4 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 10,16,46,651.00 5 Cost Incurred on Additional/Extra Items not included in the NIL Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. Particulars Amounts No 1 Total Estimated cost of the Internal and External NIL Development Works including amenities and Facilities in the layout as on 30.06.2017 is 2 Cost incurred as.on 30.06.2017(based on the Estimated cost) NIL 3 Work done in Percentage (as Percentage of the estimated cost) NIL 4' Balance Cost to be Incurred (Based on Estimated Cost) NIL 5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost NIL (Annexure A) Yours Faithfully Signature of Engineer Annexure A List of Extra/ Additional Items executed with Cost ..\\l!1'~ (Which were not parts of the original Estimate of Total Cost) r.?/ \~. NOT APPLICABL'E'BEINGCERTIFICATEIS FOR ESTIMATED COST .~~~"'~tk.a, s ~'.