[See MahaRERA order no. 5 of 2018) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (site supervisor's certificate) To The Date:31/03/2018 M/S Shree Sai Sakar Builders & Developers 4/11/47 opp. Z.P. Office Aurangpura, Aurangabad Maharashtra Quality Assurance Certificate (Certificate no 001 for the year ending 2018) Subject : Certificate for quality of materials used and quality of Construction and workmanship for the Work of Situated on the Plot bearing No 17/ Gut No-47 P demarcated by its boundaries (latitude and longitude of the end Points) Road to the North plot NO16A And 16B in South Plot No-19 to the East Road to the West at ltkheda Aurangabad taluka Aurangabad District Aurangabad . SHRISAI having MahaRERA Registration Number P51500005773 being developed by M/S Shree Sai Sakar Builders & Developers Sir, I/ We PRASAD APHALE have undertaken an assignment of supervision of this real estate project. Our Responsibility: - I/We are responsible for carrying out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in- situ or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. 1. Input Materials, Fixtures and Fittings I/We hereby certify that all Construction mater"ial · F"ixt ures and F1ttmgs . . ·th Electrical. Sanitary fittings etc and amenities to be prov,"d ed bY t h e Promotew,· thregard • to the . flooring ' and the Apartment as are as per specifications mention d . A rm e said ProJect, building e m greement of Sale. For . those items, . . where no specifications have been men t·,oned •m agreement f I h . Fixtures and Fittings used conform to the relevant BIS Standards . o_ ~a e. t e materials. industry standards. I IS National Bu1ldmg codes or as per 2. Workmanship ·ty h - I/we hereby . certify that work has bee n came· d out under our supervision We further cert, t at ~o~kmanship and quality is satisfactory and up to the mark and the wo~k has been acceptable w1thm the permissible limits of deviations as per relevant code of practice. 3. Structural engineer: - Promoters has engaged structural engineer Mr. PRASAD APHALE having Licenses no. E-229-96 having cell no. 9822531290 The structural design of buildings in this project has been done under his supervision The formwork and concrete mix design has been done as per IS 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 4. Preservation of records: - Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. s. Please specify materials or any other item of work which were not conforming to the specifications as mentioned in the Agreement for sale: N-A Yours Faithfully, Signature of Engineer (Site Supervisor} Name: PRASAD APHALE ~ ense no.(if any)E-229-96 rl°9 Ph no.9822531290 P\ace :AURANGABAD. p APHALE B.E. (Civil), M.E. (Struct.) Agreed and Accepted by: Regd. No.: DDMCB/Rf2021/APU0 1035 Signature of Promoter: Name: M/S Shree Sai Sakar Builders & Developers Date: