SAKAR ASSOCIATES Opp. Z.P. Office, Beside Spice Veg Restaurant, Aurangpura, Aurangabad.l Ph. 0240- 2350900,9325524 l 6 l . ARCHITECT'S CERTIFICATE ( To be submitted at the r O f R • . st Account) rme eg, ratron of Ongoing Project and for Withdraw! of Money from Desginated To Date:14/01/2023 The MIS SHREE SAi SAKAR BUILDERS AND DEVELOPERS 4/11/47 opp. Z.P. Office Aurangpura, Aurangabad Maharashtra Subject: Certificate of Percentage of Completion of Construction work of 01 No of Building of the Project [MahaR~RA Registration Number] Situated on the Plot bearing No 17/ Gut No-47 p demarcated by its boundaries (latitude and longitude of the end Points) Road to the North plot N016A And 16B in South Plot No-19 to the East Road to the West at ltkheda Aurangabad taluka Aurangabad District Aurangabad . Admeasuring 422.97 sq.mts. area being developed by MIS SHREE SAi SAKAR BUILDERS AND DEVELOPERS Sir, I/We Sakar Associates have undertaken assignment as Architect/Licensed Surveyor of Certificate of Percentage of Completion of Construction work of 01 No of Building of the Project Situated on the Plot bearing No 17/ Gut No at ltkheda Aurangabad taluka Aurangabad District Aurangabad. Admeasuring 422.97 sq.mts. area being developed by MIS SHREE SAi SAKAR BUILDERS AND DEVELOPERS 1. Following technical Professionals are appointed by Owner/Promoter:- !. Shri. Kedar Pande LS. /Architect II. Shri. Prasad Aphale as structural Consultant Ill. Shri. Kedar Pande as MEP Consultant ii;\ , IV. Shri. Sanjay Santre as Site Supervisor i'). . . // Based ~ n site Inspection with respect to the Building of the aforesaid Real Estate Project, I Certify that as on the date of this Cerificate , the percentage of work Done for each of Building/Wing of the Real Estate Project as registered vide number P51500005773 under MahaRERA is as per table A herein below. The Percentage of the Work executed with respect to each of the activity of the entire Phase is details in Table B. I / ( / Sr.No. Tasks /Activity Percentage of Work done - 1 Excavation 100% 2 number of basements and plinth 1 100% 3 number of podiums N.A 4 Stilt Floor 0 5 number of Slabs of Super Structure 6 6 Internal Walls, Internal Plaster, Floorings 100% Within Flats/Premises, Doors and windows To each of the Flat/Premises 7 Sanitary Fittings Within the Flat/Premises Electrical Fittings within 100% the Flat/Premises 8 Staircases, Lift wells and Lobbies at each 100% Floor level Connecting Staircases and Lifts, Overhead and Underground Water Tanks .,.-~,. 9 The external Plumbing and external Plaster 100% Elevation, completion of terraces with water Proofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro Mechanical equipment Compliance to Conditions of environment /CRZ NOC, Finishing to entrance Lobby/s, Plinth Protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other Requirements as may be required to obtain Occupation/Completion Certificate. / TABLE-B Internal & external Development Works in Respect of the entire Registered Phase S.No Common areas and Facilities, Amenities Proposed Percentage of Details 1 Internal Roads & (Yes/No) Work done Foothpaths N.A N.A 2 N.A Water Supply 3 YES Sewarage(Chamber, 100% lines, YES Septic tank, STP) 100% 4 Storm Water Drains 5 N.A N.A 6 Landscaping & Tree Planting N.A Street Lighting 7 N.A N.A Community Buildings N.A 8 Treatment and N.A N.A disposal of YES N.A sewage and sullage water 100% 9 Solid Waste management & YES Disposal 100% 10 Water Conservation, Rain water YES harvesting 100% 11 Energy Management 12 N.A N.A Fire protection and fire safety N.A N.A requirements N.A N.A 13 Electrical mete room, Sub- YES station, 100% Receiving station 14 Others (Option to Add more) N.A N.A N.A j Youres Faithfully FOR SAKAR Assoc, ARCHrTEcr AR. KE AR AN ~ EDAR PANDe· AurangpuraAurc'{ng.abad Regd.No.CA/98/22817 8i. ame (IN BLOCK LETTERS) of l.s./Architect