BALKR|SHNADASRAOBHAKRE (8.E. CIVIL - Construction) t roRM-2 [see Regulation 3] ENGINEER'S CERTIFICATE of Money from of ongoing Project and for withdrawal (To be submitted at the time of Registration Designated Account- Proiect wise) Date:30'06'2018 To IWs Devanand Narayanrao Kotgire GilJF) Disha Square Sutgirni Chowk, Garkheda Aurangabad 4310001 Subject:CertificateofCost|ncurredforDeve|opmentof[ProjectName]forConstructionof2No. ofBui|ding,DLD|D3&D4D5,,oftheProjectDISHAKUNJABANPHASE_3[RegistrationNo. _p5l50000l537lsituatedonGutNo.5212pzrt,walujMahanagar-r,wadgaonKolhati' Building ( latitude and longitude of the end points) Aurangabad demarcated by its boundaries B5,86&C6toJheNorthsetbackofBuilding&MIDCResidentialAreatothesouthApproach margin & Gut no 735 of Division Aurangabad village to the East Approach to the west side WadgaonKolhatiWalujtalukaAurangabadDistrictAurangabadadmeasuring3405.93sq.mts forPhase_3comprisingBuildingD|D2D3,D4D5andopenSpaceforBuildingDlD2D3'D4 area being developed by Promoter lws Devanand Narayanrao Kotgire D5 is 343.98 sq. mtrs (r{trF) . Sir, Estimated cost for the subject r Barkrishna Dasrao Bhakre have undertaken assignment of certifying Rea|EstateProjectregisteredunderMahaRERA(Reg.No._P5150000t537|,beingBUILD|NGDisha KunjabanPhase-3Building'DLD2D3'D4D5"situatedontheplotbearingGutnoGutNo'5212part' WalujMahanaggr-I,Village-WadgaonKolhati,District-Aurangabadadmeasuring3405.93sq.mts. D3, D4 D5 and open Space for Approach & Building Dl for Phase - 3 comprising Building Dl D2 by Promoter M/s Devanand Narayanrao D2 D3,D4 D5 is 343.98 sq. mtrs area being developed Kotgire (I{[JF) BALKRISHNA DASRAO BHAKRE (8.E. CIVIL - Construction) Plot no 49. Shambu Mahadeo Nasar, Near Sahakar Nasar Auransabad.431001 L Following technical professionals are appointed by Owner / Promoter:- i) AKW Associates as Architect ii) M/s Core Consultant (Prop. Rajesh Wargantwar) as Structural Consultant iii) ShriSachin Baburao Bagade as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificde, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Sachin Baburao Bagade Site Supervisor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under r€.ference as Rs. 5,85,89,645.00 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred tilldate is calculated at Rs. 5,79,80,801.00(Total of Table A and B) _. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimatdd Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Aurangabad MunicipalCorporation (planning Authority) is estimated at Nil (Totalof Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completpd on the date of this certificate is as given in Table A and B below : TABLE A BALKRISHNA DASRAO BHAKRE (8.E. CIVIL - Construction) bad.431001 DISHA KUNJABAN PHASE-3 tr Pa rticu la rs l; Total Estimated cost of the building DtsHA KUJABAN pHAsE -3 D1 Rs. 5,85,89,645.00 D2 D3, D4 D5 as on 30.06.2018 is cost incurred as on 30.00.2019 (based on the estirn-ateo cost Rs. 5,79,80,801.00 ) work done in Percentage (as percentage of trre estirn-atea cost ) Cost to be Incurred (Based on Estimated Cost) Rs.6,08,844.00 cost Incurred on Additional/Extra rtems not included in tl"re Estimated Cost (Annexure A) TABIE B (To bp prepared forthe entire registered phase ofthe Real Estate project) Total Estimated cost of the Internaland External Development works including amenities and Facilities in the layout as on 30.06.2018 is cost incurred as on 30.06.2019 (based on the Estimated cost ) workdohe in percentage 1as eercen@ Balance Cost to be Incurred (Based on gstimatea Cost) Cost Incurred on Additional /Extra ttems not included in the Estimated Cost Annexure A J List of Extra /Additional ttems executed with Cost (which were not parts of the originar Estimate of Totarcost) NOT APPLICABLE BEING CERTIFICATE IS FOR ESTIMATED COST