BALKRISHNA DASRAO BHAKRE (8.E. CIVIL - Construction) , Plot no 49. Shambu Mahadeo Nagar, Near Sahakar Nasar Aurangabad.43L001 FORM-2 [see Regulation 3] ENGTN EER'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 31.03.2018 To M/s Devanand Nprayanrao Kotgire (FIUF) Disha Square Sutgirni Chowk, Garkheda Aurangabad 43 I 000 1 Subject: Certificate of Cost Incurred for Development of [Project Name] for Construction of 2 No. of Building "Dt DZ D3 & D4 D5" of the Project DISHA KUNJABAN PHASE - 3 [Registration No. - P515000015371 situated on Gut No. 5212 part, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad demarcated by its boundaries ( latitude and longitude of the end points) Building 85, 86 & C6 to the North Setback of Building & MIDC Residential Area to the South Approach to the East Approach to the West side margin & Gut no 735 of Division Aurangabad village Wadgaon Kolhati Waluj taluka Aurangabad District Aurangabad atlmeasuring 3405.93 sq.mts for Phase - 3 comprising Building D1 D2 D3, D4 D5 and Open Space for Building Dl D2 D3, D4 D5 is 343.98 sq. mtrs area being developed by Promoter M/s Devanand Narayanrao Kotgire (HUF) Sir, I Balkrishna Dasgao Bhakre have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project registered under Maha RERA (Reg. No. - P51500001,537), being BUILDING Disha Kunjaban Phase-3 Building "D1- D2 D3, D4 D5" situated on the plot bearing Gut no Gut No. 5212 paft, Waluj Mahanagar - I, Village -Wadgaon Kolhati, District-Aurangabad admeasuring 3405.93 sq.mts. for Phase - 3 comprising Building Dl D2 D3, D4 D5 and Open Space for Approach & Building Dl D2 D3, D4 D5 is 343.98 sq. mtrs area being developed by Promoter M/s Devanand Narayanrao Kotgire ' GilJF) BALKRISHNA DASRAO BHAKRE (B.E. CIVIL - Construction) Plot no 49. Shambu Mahadeo Nagar, Near Sahakar Nagar Auransabad.431001 1. Following technical professionals are appointed by Owner / Promoter:- i) AKW Associates as Architect ii) [1/s Core Consultant (Prop. Rajesh Wargantwar) as Structural Consultant iii) Shri Sachin Baburao Bagade as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity'for the entire work as calculated by Shri Sachin Baburao Bagade Site Supervisor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.5,85,89,645.00 (Total of Table A and B). The estimated Total Cost of project iswith reference tothe Civil, MEP and allied works required to be completed forthe purpose of obtaining occupation certificate / completion certificate for the building(s) from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.5,74,39,181.OO(Total of Table A and B) The amount of Estimated Cost Incurred is calculated on the base of amount of Total -. Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Aurangabad Municipal Corporation (planning Authority) is estimated at Nil (Total of Table A and B). 6. lcertify that the Cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below : TABLE A BALKRISHNA DASRAO BHAKRE Plot no 49. shambu Mahad.o *r*.r, Near Sahaka,. I -r-:t;il::"::;ilIt' DISHA KUNJABAN PHASE-3 Sr. No Pa rticu la rs Amounts 1. Total Estimated cost of the building DISHA KUJABAN PHASE -3 D1 Rs. 5,85,89,645.00 D2 D3, D4 D5 as on 31.03.2018 is 2 Cost incurred as on 31.03.2018 (based on the Estimated cost ) Rs. 5,74,39,181-.00 3 Work done in Percentage (as Percentage of the estimated cost ) 98% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. 11,50,446.00 5 Cost Incurred on Additional /Extra ltems not included in the NIL Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Real Estate project) Sr. Pa rticulars Amounts No 1_ Total Estimated cost of the Internal and External NIL Development Works including amenities and Facilities in the layout as on 31.03.2018 is z Cost incurred as on 31.03.2018 (based on the Estimated cost ) NIL 3 Work done in Percentage (as Percentage of the estimated cost ) NIL 4 Balance Cost to be Incurred (Based on Estimated Cost) NIL 5 cost Incgrred on Additional /Extra ltems not included in the Estimated cost NIL (Annexure A) Yours Faithfully r-.-., i : r\,j. rL" R.D. Bhakre Annexure A List of Extra / Additional ltems executed with Cost (Which were not parts of the original Estimate of Total Cost) NOT APPLICABLE BEING CERTIFICATE IS FOR ESTIMATED COST