BALKRISHNA DASRAO BHAKRE (8.E. CtVtL - Construction) Plot no 49. Shambu Mahadeo Nagar. Near Sahakar Nagar Aurangabad.43L001 FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account- project wise) Date: 03.02.2019 To M/s Devanand Narayanrao Kotgire (HUF) Disha Square Sutgirni Chowk, Garkheda Aurangabad 43 I 000 I subject: certificate of cost Incurred for Development of [project Name] for construction of 2 No. of Building "Dt D2 D3 & D4 D5" of the Project DISHA KUNJABAN PHASE - 3 [Registration No. - P515000015371 situated on Gut No. 5212 part, Waluj Mahanagar I, Wadgaon Kolhati, - Aurangabad demarcated by its boundaries ( latitude and longitude of the end points) Building 85' B6 & C6 to the North Setback of Building & MIDC Residential Area to the South Approach to the East Approach to the West side margin & Gut no 735 of Division Aurangabad village Wadgaon Kolhati Waluj taluka Aurangabad District Aurangabad admeasuring 3405.93 sq.mts for Phase - 3 comprising Building Dl D2 D3, D4 D5 and open Space for Building Dl D2 D3, D4 D5 is 343'98 sq' mtrs area being developed by Promoter M/s Devanand Narayanrao Kotgire (HUF) Sir, I Balkrishna Dasrao Bhakre have undertaken assignment of certifying Estimated cost for the subject Real Estate Project registered under Maha RERA (Reg. No. - p51500001.537), being BUILDtNG Disha Kunjaban Phase-3 Building "Dr D2 D3, D4 D5" situated on the plot bearing Gut no Gut No. 5212 paft, Waluj Mahanagar - I, Village -Waclgaon Kolhati, District-Aurangabad admeasuring 3405.93 sq.mts. for Plrase - 3 comprising Building Dl D2 D3, D4 D5 and open Space for Approach & Builcling Dl D2 D3, D4 D5 is 343.98 sq. mtrs area being developed by Prornoter M/s Devanand Narayanrao Kotgire (HUF) BALKRISHNA DASRAO BHAKRE (B.E. CIVIL - Construction) Plot no 4 hambu Maha ar, Near kar Naear Au abad.431001 1'. Following technical professionals are appointed by owner / promoter:- i) AKW Associates as Architect ii) M/s Core Consultant (Prop. Rajesh Wargantwar) as Structural Consultant iii) Shri Sachin Baburao Bagade as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Sachin Baburao Bagade Site Supervisor appointed by Developer/Engineer, and the assumption of the cost of material, labour ano other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 5,85,89,645.00 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost Incurred till date is calculated at Rs.5,g6,93,52i..O0(Total of Table A and B) The amount of Estimated Cost Incurred is calculated on the base of amount of Total -. Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Aurangabad Municipal Corporation (planning Authority) is estimated at Nil (Total of Table A and B). lcertify that the Cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below: TABLE A BATKRISHNA DASRAO BHAKRE (8.E. CIVIL - Construction) Plot no 49. Shambu Maha o Nagar. Near Sa ar Aurangabad.43100 DISHA KUNJABAN PHASE-3 Pa rticula rs Total Estima,uO .o, D2 D3, D4 D5 as on 31.12. 2OO7 Rs. 5,85,89,645.00 is Cost incurred as on 3 Rs. 5,86,93,521.00 Work done O.r." 'n Balance Cost to be Cost lncurred on Ad Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Rear Estate project) Pa rticu la rs Amounts Total EstimatuO .ost Works inctuding amenities and ff:*ffi?i Facitities in the tayout as on Cost incurred .r on Work donetn Ou* Balance Cost to Add eH.[::'iion Yours Faithfully l'i1i . i.l" g,D. Bhakre SAr- lif.rii; l'; r.;A Il. B1-{;\KRE Annexure A List of Extra /Additional ltems executed with Cost (Which were not parts of the original Estimate of Total NOT APPLICABLE BEING Cost) CERTIFICATC IS rON ESTTMATED COST