Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir Osmanpu ra, Aurangabad. FORM 1[see Regulation 3l ARCIIITECT'S CERTIF'ICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:24/LO/ZOL8 To IWs Devanand Narayanrao Kotgire (FilJF) Disha Square Sutgimi Chowk, Garkheda Aurangabad 4310001 Subject: Certificate of Percentage of Completion of Construction Work of 2 No. of Building Dl D2 D3 & D4 D5 of the Project DISIIA ITNJABAII PIIASE - 3 [Registration No. - P515000015371 situated on Gut No. 5212 part, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad demarcated by its boundaries ( latitude and longitude of the end points) To the North - Building 85, 86 & C6N To the South - Setback of Building & MIDC Residential Area To the East - Approach To the lilest - Approaeh Of Division Aurangabad village Wadgaon Kolhati Waluj taluka Aurangabad District Aurangabad admeasuring 3405.93 sq.mts for Phase - 3 comprising Building Dl D2,D3 D4 D5 and Open Space for Phase - 3 is 343.98 sq. mtrs area being developed by Promoter IVUs Dev*nand N*rayanrao Kotgire {I{UF) Sir, I Manish Kale Parbrer of AKW ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certiffing Percentage of Completion of Construction Work of the Phase - 3 of the Project comprising Building Dl D2, D3 D4 D5 of the Project Disha Kunjaban, situated on the plot bearing Gut no Gut No. 5212 parl, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad admeasuring3405.93 sq.mts for Phase - 3 comprising Building DI D2, D3 D4 D5 and Open Space for Phase - 3 is 343.98 sq. mtrs area being developed by Promoter iWs Devanand Narayanrao Kotgire GilJF) 1. Following technical professionals are appointed by Owner / Promoter:- \ Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir Osmanpura, Aurangabad. (D AKW Associates as Architect; (ii) CORE Consultants as Structural Consultant {iii) Slri Sachin Baburao Bagade as Site Supewisor Based on Site Inspection, with respect to each of Wing of the aforesaid Real Estate Project,I certifu that as on the date of this certificate, the Percentage of Work done for Phase - 3 comprising Building Dl D2 D3 & D4'D5 of the Real Estate Project - Disha Kunjaban as registered vide number P515OO001537 under Maba RERA is as per table A herein below. Tlre prcentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A DISI{A KT]NJABAII PIIASE _ 3 Dl D2 D3 & D4 D5 S. No. Tasks / Activity Percentage of Work L Excavation IOO% 2 X Number of Basement(s) and Plinth LOO% 3 X Number of Podiums NA 4 Stilt Floor roo% 5 X number of Slabs of Super Structure LOO% Internal walls, Internal Plaster, Floorings within Flats / 6 LOO% Premises, Doors and Windows to each of the Flat / premise Sanitary Fittings within the Flat / Premises, Electrical 7 100% Fittings with the Flat / Premises Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- roo% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building 100% / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to 10 98.s% entrance lobby/s, plinth protection, paving of area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the workdone for the IL entire Building / Wing 98,2_Eyo Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir OsmanPura, Aurangabad. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase DISHA KI]NJABA}I PHASE - 3 Dl D2 D3 & D4 D5 Common Areas and Facilities, Amenities Proposed Percentage of Details Completion lnternal Roads and FootPath Yes LOO% RCC & Paver Blocks Water Supply Yes LOO% Cidco Water Connection Sewerage (Chamber, Line, Septic, Tank, STP) Yes 100% Chamber Line & Drainage Line Only Storm Water Drains NA Landscaping & Tree Planting Yes LOO% Regular Tree Plantation in Open Space Street Lighting Yes LOO% General Tube Lights Community Buildings NA Treatment and Disposalof Sewage and Sullage NA Water Solid Waste Management and Disposal NA Water Conversation, Rain Water Harvesting Yes 100% Ground water recharge of Terrace Water through Bore well Energy Management NA Fire Protection and Fire Safety Requirements NA Electrical Meter Room, Sub-station, Receiving Yes too% Completed Station Aggregate Area of Recreational Open Space Yes 98% Open Space Development is almost completed for the registered Open Parking NA Yours Faithfully Reg.No.CA -93115610 For AKW Associat