Nishigandh C, Disha Shrushti, Rana Nagar, ft, AKW Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir J \ \-,ASSOCIATES- Osmanpura, Aurangabad. FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:04/07 /2078 To IWs Devanand Narayanrao Kotgire (filJF) Disha Square Sutgirni Chowk, Garkheda Aurangabad 43 I 000 I Subject: Certificate of Percentage of Completion of Construction Work of 2 No. of Building D1 D2 D3 & D4 D5 of the Project DISHA KUNJABAN PHASE - 3 [Registration No. - P515000015371 situated on Gut No. 5212 part, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad demarcated by its boundaries ( latitude and longitude of the end points) To the North - Building 85, 86 & C6N To the South - Setback of Building & MIDC Residential Area To the East - Approach To the West - Approach Of Division Aurangabad village Wadgaon Kolhati Waluj taluka Aurangabad District Aurangabad admeasuring 3405.93 sq.mts for Phase - 3 comprising Building Dl D2, D3 D4 D5 and Open Space for Phase - 3 is 343.98 sq. mtrs area being developed by Promoter IWs Devanand Narayanrao Kotgire (I{[IF) Nishigandh C, Disha Shrushti, Rana Nagar, K, AKW Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir J \ \--,ASSOCIATES- Osmanpura, Aurangabad. Sir, I Manish Kale Partner of AKW ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Phase - 3 of the project comprising Building Dl D2, D3 D4 D5 of the Project Disha Kunjaban, situated on the plot bearing Gut no Gut No. 5212 part, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad admeasuring 3405.g3 sq.mts for Phase - 3 comprising Building Dl D2, D3 D4 D5 and Open Space for phase - 3 is 343.9g sq. mtrs area being developed by Promoter M/s Devanand Narayanrao Kotgire GilJF) 1. Following technical professionals are appointed by owner / promoter:- (i) AKW Associates as Architect; (ii) CORE Consultants as Structural Consultant (iii) Shri Sachin Baburao Bagade as Site Supervisor Based on Site lnspection, with respect to each of Wing of the aforesaid Real Estate project, I certifu that as on the date of this certificate, the Percentage of Work done for Phase - 3 comprising Building Dl D2 D3 & D4 D5 of the Real Estate Project - Disha Kunjaban as registered vide number P51500001537 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. ti; 4s(r!ll-- Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. (Y, AKW \ \-,ASSOCIATES- Telefax: 0240 -2451616 Anand Building, Opp. Sant Eknath Rangmandir Osmanpura, Aurangabad. -/ Table A DISHA KUNJABAI{ PHASE _3 Dl D2 D3 & D4 D5 S. No. Tasks / Activity Percentage of Work 7 Excavation IO0o/o 2 X Number of Basement(s) and Plinth rco% 3 X Number of Podiums NA 4 Stilt Floor IOO% 5 X number of Slabs of Super Structure 100% Internal walls, lnternal Plaster, Floorings within Flats / 6 L00% Premises, Doors and Windows to each of the Flat / Premise Sanitary Fittings within the Flat / Premises, Electrical 7 t00% Fittings with the Flat / Premises Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- 100% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building rco% / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to 10 98.5% entrance lobby/s, plinth protection, paving of area appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Com pletion Certificate Overall Percentage of Completion of the work done for the It entire Building / Wing 98.25% t]I -,'- r.]-\t).':o .. ., .4-\L-s --:. >- Nishigandh C, Disha Shrushti, Rana Nagar, Opp. HotelAtithi, Jalna Road, Aurangabad. ---,/ /Y, \ AKW \-,ASSoCIATES- Anand Building, Opp. Telefax: 0240 -2451616 Sant Eknath Rangmandir Osmanpura, Aurangabad. TABLE.B Internal & External Development Works in Respect of the entire Registered Phase DISHA KUNJABAN PHASE _3 Dl D2 D3 & D4 D5 Common Areas and Facilities, Amenities Proposed Percentage of Details Completion Internal Roads and Footpath Yes rcj% RCC & Paver Blocks Water Supply Yes !00o/o Cidco Water Connection Sewerage (Chamber, Line, Septic, Tank, STP) Yes \ooo/o Chamber Line & Drainage Line Only Storm Water Drains NA Landscaping & Tree Planting Yes 100% Regular Tree Plantation in Open Space Street Lighting Yes LOO% General Tube Lights Community Buildings NA Treatment and Disposal of Sewage and Sullage NA Water Solid Waste Management and Disposal NA Water Conversation, Rain Water Harvesting Yes rcj% Ground water recharge of Terrace Water through Bore well Energy Management NA Fire Protection and Fire Safety Requirements NA Electrical Meter Room, Sub-station, Receiving Yes 700% Completed Station Aggregate Area of Recreational Open Space Yes 98% Open Space Development is almost completed for the registered Open Parking NA Yours Faithfully , >\ H)t .*;"/ G'rPr'a- - RT.ffRI.IISH V. KALE Reg.No.CA -93/15610