Opp. HotelAtithi, Jalna Road, Aurangabad AK IATE$- NN Telefax: 0240 - 2451616 5-6-37,Anand Building, Opp. Sant Rang Mandir, New Usmanpura, Aurangabad, Telefax: 0240 - 2325367,2348634 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 06/05 /2018 To M/s Devanand Narayanrao Kotgire GilJF) Disha Square Sutgirni Chowk, Garkheda Aurangabad 43 10001 Subject: Certificate of Percentage of Completion of Construction Work of 2 No. of Building Dl D2 D3 & D4 D5 of the Project DISHA KfINJABAN PHASE - 3 [Registration No. - P515000015371 situated on Gut No. 5212 part, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad demarcated by its boundaries ( latitude and longitude of the end points) To the North - Building 85, B6 & C6N To the South - Setback of Building & MIDC Residential Area To the East - Approach To the West - Approach Of Division Aurangabad village Wadgaon Kolhati Waluj taluka Aurangabad District Aurangabad admeasuring 3405.93 sq.mts for Phase - 3 comprising Building D1 D2, D3 D4 D5 and Open Space for Phase - 3 is 343.98 sq. mtrs area being developed by Promoter I\[/s Devanand Narayanrao Kotgire (HUF) Opp. HotelAtithi, Jalna Road, Aurangabad. Telefax: 0240 - 2451616 AH\S\$ 5-6-37,Anand Building, Opp. Sant Rang AS$SilIATE$- Mandir, New Usmanpura, Aurangabad, Telefax: 0240 - 2325367 ,2348634 Sir, I Manish Kale Parlner of AKW ASSOCIATES have underlaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Phase - 3 of the Project comprising Building Dl D2, D3 D4 D5 of the Project Disha Kunjaban, situated on the plot bearing Gut no Gut No. 5212 paft, Waluj Mahanagar - I, Wadgaon Kolhati, Aurangabad admeasuring 3405.93 sq.mts for Phase - 3 comprising Building Dl D2, D3 D4 D5 and Open Space for Phase - 3 is 343.98 sq. mtrs area being developed by Promoter M/s Devanand Narayanrao Kotgire (mJF) 1. Following technical professionals are appointed by Owner / Promoter:- (i) AKW Associates as Architect; (ii) CORE Consultants as Structural Consultant (iii) Shri Sachin Baburao Bagade as Site Supervisor Based on Site Inspection, with respect to each of Wing of the aforesaid Real Estate Project, I certify that as on the date of this ceftificate, the Percentage of Work done for Phase - 3 comprising Building Dl D2 D3 & D4 D5 of the Real Estate Project - Disha Kunjaban as registered vide number P51500001537 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Opp. HotelAtithi, Jalna Road, Aurangabad. "tr { N\-ASSOCIATES AK\:S Telefax: 0240 - 2451616 5-6-37,Anand Building, Opp. Sant Rang Mandir, New Usmanpura, Aurangabad, Telefax: 0240 - 2325367 ,2348634 Table A DISHA KUNJABAN PHASE -3 D1D2 D3 & D4 D5 S. No. Tasks / Activity Percentage of Work 1 Excavation 100% 2 X Number of Basement(s) and Plinth 100% 3 X Number of Podiums NA 4 Stilt Floor 1,00% 5 X number of Slabs of Super Structure 100% Internal walls, Internal Plaster, Floorings within Flats / 6 too% Premises, Doors and Windows to each of the Flat / Premise Sanitary Fittings within the Flat / Premises, Electrical Fittings with the Flat / Premises t00% Staircases, Lift Wells and Lobbies at each Floor Level 8 connecting Staircases and Lifts, Overhead and Under- rcj% ground Water Tanks The external plumbing and external plaster, elevation 9 completion of terraces with water-proofing of the Building 100% / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical fittings to Common Areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to 10 entrance lobby/s, plinth protection, paving of area 98.5% appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Overall Percentage of Completion of the work done for the 1t entire Building / Wing 98.25% s€- Opp. HotelAtithi, Jalna Road, Aurangabad &KN\$ Telefax: 0240 - 2451616 5-6-37,Anand Building, Opp. Sant Rang AS$OCfATES- Mandir, New Usmanpura, Aurangabad, Telefax: 0240 - 2325367,2348634 TABLE-B Internal & External Development Works in Respect of the entire Registered phase DISHA KUNJABAN PHASE - 3 Dl D2 D3 & D4 D5 Common Areas and Facilities, Amenities Proposed Percentage of Details Completion Internal Roads and Footpath Yes toj% RCC & Paver Blocks Water Supply Yes toj% Cidco Water Connection Sewerage (Chamber, Line, Septic, Tank, STP) Yes 1,00% Chamber Line & Drainage Line Only Storm Water Drains NA Landscaping & Tree Planting Yes L00% Regular Tree Plantation in Open Space Street Lighting Yes 100% General Tube Lights Community Buildings NA Treatment and Disposal of Sewage and Sullage NA Water Solid Waste Management and Disposal NA Water Conversation, Rain Water Harvesting Yes too% Ground water recharge of Terrace Water through Bore well Energy Management NA Fire Protection and Fire Safety Requirements NA Electrical Meter Room, Sub-station, Receiving Yes toj% Completed Station Aggregate Area of Recreational Open Space Yes 98% Open Space Development is almost completed for the resistered Open Parking NA Yours Faithfully >t *t \, t-' I \ ,^ \\& \'\.- . E):J-*':=-€ nl. mnnlsH v. KALE . Reg.No.CA -93/15610 For AKW Associates