MRuesnl BesrsN tFctat,'Ecrs r rl{rEFrot l}Filclft Annexure A FORM 1 [See Regulation 3] ARCHITECT,S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 05/0412022 To, Mr. Ashok Baheti Plot No.1 Flat No.1, The Rose, Town Center, CIDCO, Aurangabad. Subject: Certificate of Percenta8e of completion of Construction Work of Hrim Ssky City Phase ll , Building called as Hrim Ssky City B-1 Building having MahaRERA Registration Number P51500003253 being developed by Mr. Ashok Baheti. Sir, We M/s Manggal Design have undertaken assignment as Architect / Llcensed Surveyor of Certifying Percentage of Completion of Construction Work of Hrim Ssky City Phase ll , Building called as Hrim Ssky City B-1 Building having MahaRERA Registration Number P51500003253 being developed by Mr. Ashok Baheti Based on the Site lnspection, with respect to the Layout / each Building,/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-8. TABLE-A.1 To Be Preoared For BUILDING B-1 "Hrim Sskv Ciw-Phase ll" March-2022 Sr. Tasks/Activity Percentage of work No done 1 Excavatio n 100% 2 Number of Podiums N.A. 3 Number of Plinth 700% 4 stiltfloor -. PAPE$N+ 700% ry#ffig! -aififfi'ffi -..ar.-iidc6 MnruseRl Eesrsr.r 5 ?O Number of Slabs of Super Structure 1,00% 6 lnternal Masonry walls LOo% 7 lnternal Plaster L00% 8 Flooring within Flats/Premises to)% 9 Doors and Windows to each of the Flat/Premises no% 10 Sanitary Fitting within the Flat/Pre m ises, E lectrica I Fittings L00% within the Flat/Premises 77 Staircases, Lifts Wells and Lobbies at eachFloor level connecting Staircase and Lifts,Overhead and Underground L00% Water Tanks 72 The external plumbing and external p laster,eleva tion, completion of terraces with waterproofing ofthe 700% Building/Wing 13 lnstallation of lifts, water pumps, Fire Fighting Fittingsand Equipment as per CFO NOC, Electrical fittings tocommon Areas, electro, @ cond iti^nc ^f envir^nm9nty'efi++l€C,FiniShing to entrance 700% lobby/s, plinth protection, paving of a reasAp pu rtena nt to Building/Wing, Compound Walland all other requirements as may be required to obta inoccupation / Completion Certificate TABLE.B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Pro.iect Number P51500003253 Common areas and Facilities, Proposed Percentage of Details 5r. Amenities (Yes/tuo) Work done No. I lnternal Roads & Footpaths No NA 2 Water Supply Yes to1% Boring 3 Sewerage (chamber, lines, Yes 100% Drinage Line Septic Tank, STP) Till Corporation Line 4 Storm Water Dra ins NA NA "J#"cHrnMl^ +orcfi oOo&V bortrl.re Mnrussnl Eesrox 5 Landsca ping & Tree Planting Yes LOo% Tree Plantation for internal project 6 Street Lighting Yes 700% For lnternal Project 7 Community Buildings NA NA 8 Treatment and disposal of Yes LOO% Biodigester sewage and sludge water System 9 Solid Waste management & NA NA Disposal 10 Water Conservation, Rain Yes too% Rain Water water harvesting Ha rvesting As per Norms 17 Energy management NA NA 12 Fire protection and fire safety Yes 700% As per Fire requirements Norms 13 Electrical meter room, Yes 100% As per MSEB Substation, receiving station Norms L4 Others( option to add more) Yours faithfully, M/s. Manggal Design ricenserurmuer( Cf-?-'or I - J3I14 ) 6e Agreed & Accepted by: Signatu re of Promoter Name: Mr. Ashok Baheti Darei 05/04/2022