FORM-2A See MahaRERA order no. of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE To, Deepak Jhunjhunwala Raghuvir Realities, Harikunj housing project, Pharola, Paithan road, Aurangabad. Quality Assurance Certificate (Certificate no CRT/QUA/RR/HK-21 for the quarter ending 31.3.2021) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the Work of 2 No. of Building(s) D and G and A and B Wings(s) of the Phase of the project situated on the plot bearing C. S. No./C.T.S. No./ Survey No./Final plot no. 1 demarcated by its boundaries (latitude and longitude of the end points) 194346, 751746 to the North 194342, 751747 to the South 194344, 751747 to the East 194344, 751745 to the West of Division Farola village Paithan taluka Aurangabad District 431 105 PIN admeasuring 7119.69 sq.mtrs. area being developed by Raghuvir Realities, Deepak Jhunjhunwala. Reference: MahaRERA Registration Number- P51500000992. Sir, / We Kishore Ashok Mareadiya have undertaken an assignment of supervision of this real estate project. 1.Our Responsibility: To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work and 1. Material Testing I/we, have applied following mandatory checks on the basic materials, used in the construction. i. Cement It has been tested for its fineness, soundness, setting time, compressive strength etc. as per IS code 3535:1986 or as per other relevant IS/85/NBC code, or as per industry standards and its results are within the permissible limits. ii. Coarse aggregate- It has been tested, for deleterious materials, clay lumps, crushing value, impactvalue as per IS 243011986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. ii. Bricks/ blocks - They have been tested for water absorption, crushing strength etc. as per IS 5454:1978 or as per other relevant IS/85/NBC code or as per industry standards and its results are within permissible limits. iv. Concrete/Ready-mix Concrete It has been tested for compressive strength for various periods as per 15 456:2000 and IS 1199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v. Steel for concrete It has been tested as per IS 2062:2011 or as per other relevant IS/BS/NBC code or as per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials Other materials like sand, crushed sand, floor tiles, fixtures and fittings, pipes and sanitary fittings etc. (List out all items) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the Industry for a particular material. 2. Workmanship: /we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice 3. Electrical Materials and workmanship: installation/other electrical installations works of all the electrical wiring/connections/lift electrical engineer and its records have been carried out under authorized/registered has been maintained. The materials used conform to the relevant I.S/ B.S/ National Building codes or as per industry standards. 4. Structural engineer: -Promoters has engaged structural engineer Mr. Pradeep Mote no cell no. 8855844438. having Licenses no.DDMCB/R/2021/APLI01141 having office The structural design of buildings in this project has been done under his supervision. consultation with soil He has checked the soil report before laying PCC for foundation in Is 10262:20099 consultant. The formwork and concrete mix design has been done as per or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 5. Preservation of records:- Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. to the 6. Please specify materials or any other item of work which were not conforming standard specifications and which were not rejeded. Nil. Yours Faithfully, Signature of Engineer (Site Supervisor) Name: Kishore Ashok Mareadiya Phone no.7385353888 Place: Aurangabad.