FORM-2A See MahaRERA order no. of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASURANCE To, Deepak Jhunjhunwala Raghuvir Realities, Harikunj housing project, Pharola, Paithan road, Aurangabad. Quality Assurance Certificate (Certificate no CRT/QUA/RR/HK-20 for the quarter ending 31.12.2020) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the Work of 2 No. of Building(s) D and G and A and B Wings(s) ofthe Phase of the project situated on the plot bearingC. S. No./C.T.S. No./Survey No./Final plot no. 1 demarcated by its boundaries (latitude and longitude ofthe end points) 194346, 751746 to the North 194342, 751747 to the South 194344, 751747 to the East 194344, 751745 to the West of Division Farola vilage Paithan taluka Aurangabad District 431105 PIN admeasuring 7119.69 sq.mtrs. area being developed by Raghuvir Realities, Deepak Jhunjhunwala. Reference: MahaRERA Registration Number- P51500000992. Sir, /We Kishore Ashok Mareadiya have undertaken an assignment of supervision of this real estate project. 1. Our Responsibility:- with the development permission and as per the To carry out the work in accordance certificate of supervision of work and to carry out material approved plan and submit to ensure quality of work and testingin-situ or in the authorized laboratory and 1. Material Testing checks on the basic materials, used in the Iwe, have applied following mandatory construction. i. Cement It has been tested for its fineness, soundness, setting time, compressive strength etc. as per IS code 3535:1986 or as per other relevant IS/85/NBC code, or as per industry standards and its results are within the permissible limits. ii. Coarse aggregate It has been tested, for deleterious materials, clay lumps, crushing value, impact value as per IS 243011986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. ii. Bricks/ blocks They have been tested for water absorption, crushing strength etc. as per IS 5454:1978 or as per other relevant IS/85/NBC code or as per industry standards and its results are within permissible limits. iv. Concrete/Ready-mix Concrete It has been tested for compressive strength for various periods as per 15 456:2000 and IS 1199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v. Steel for concrete- It has been tested as per IS 2062:2011 or as per other relevant IS/BS/NBC code or as per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials Other materials like sand, crushed sand, floor tiles, fixtures and {ittings, pipes and sanitary etc. (List out all items) used in this project conform to relevant fittings IS/BS/NBC code or as per standards laid down by the Industry for a particular material 2. Workmanship:- out under our supervision. We further /we hereby certify that work has been carried and up to the mark and the work has certify that workmanship and quality is satisfactory limits of deviations as per relevant code of been acceptable within the permissible practice. 3. Electrical Materials and workmanship:- works of all the electrical wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and its records has been maintained. The materials used conform to the relevant .S/ B.S/ National Building codes or as per industry standards. 4. Structural engineer:Promoters has engaged structural engineer Mr. Pradeep Mote having Licenses no.DDMCB/R/2021/APL/01141 having office no cell no. 8855844438. The structural design of buildings in this project has been done under his supervision. He has checked the soil report before laying PCC for foundation in consultation with soil consultant. The fomwork and concrete mix design has been done as per ls 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 5. Preservation of records: Record of all test results this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. 6. Please specify materials or any other item of work which were not conforming to the standard specifications and which were not rejeded. Nil. Ygups Faithfully, Signature of Engineer (Site Supervisor) Name Kishore Ashok Mareadiya Phone no.7385353888 Place: Aurangabad.