Arch. Ganesh Mharolkar SPACE cA12001127254 Architects lnterior Designers 203,2nd floor, Shankar Plaza,SahakarNagar Chowk, Opp Bank of Baroda,Dargah Road, Chh.Sambhaji Nagar. 431005 Ph: 0240 2970299 Cell: 9423'1 491 44. E Mail: spacear203@gmail.com. Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale:10-01-2024 To, DEEPAK RADH ESHYAM JHU NJHU NWAI.A, RAGHUVIR MOTORS, RAGH UVIR COMPLEX, OPPOSITE DISTRICT COURT, ADAI.AT ROAD, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of HARIKUNJ having MahaRERA Registration Number P51500000992 being developed by DEEPAK RADH ESHYAM JH U NJHU NWAI.A. Sir, I / We SPACE ARCHITECTS AND INTERIOR DESIGNER have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of HARIKUNJ having MahaRERA Registration Number P51500000992 being developed by DEEPAK RADHESHYAM JHUNJHUNWALA. Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Buildingffiing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A For HARIKUNJ - Building A S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) l2l (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and Wndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremrses 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the BuildingMing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobbyis, plinth protection, paving of areas appurtenant to BuildingArVing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLF.A For HARII(UNJ - Building B S Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 0 J X number of Podiums 0 4 Stilt Floor 100 E X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and \Mndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks, I The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the BuildingAlling 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100 and E ut ent as CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain /Completion Certificate TABLE.A For HARIKUNJ - Building C s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100 2 X number of Baseme 100 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of S uper Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 90 connecting Staircases and Lifts, Overhead and Underground Water Tanks I The external plumbing and external plaster, elevation, 90 completion of terraces with waterproofing of the BuildingAtVing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 90 and Equipment as per CFO NOC, Electricalfittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wng, Compound Wall and all other requirements as may be required to Obtain Occu pation /Completion Certificate TABLF-A For HARIKUNJ - Building D S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underqround Water Tanks. 9 The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the BuildingAtVing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Electricalfittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLF.A For HARIKUNJ - Building E S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) QI (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Wndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0 Fittings within the FlaUPremrses 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underqround Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of tenaces with waterproofing of the BuildingAA/ing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building&Vng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certiticate TABLF-A For HARIKUNJ - Building F s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 0 X number of Podiums 0 4 Stilt Floor 0 q X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0 Fittings within the FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/VVing IU lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLE-A Fot HARIKUNJ - Building G S Tasks / Activity Percentage of Actual Work @ No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 100 X number of Podrums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 o lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and Wndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the BuildingANing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate T/IBLF-B Common Areas (lnternal & External Development Works) For HARIKUNJ - Building A to G S. No. Common Areas & Facilities Proposed Percentage of actual Work Done Details (Yes / t{0) (As on date of Certificate) (1) (2) (3) (4) (5) 1 lnternal Roads & Footpaths : Yes 10 Filling And Leveling 2 Water Conservation, Rain water Yes 0 To Be Done Harvesting: c. Energy management No 0 Na 4 Fire Protection And Fire Safety No 0 Na Requirements: 5 Electrical Meter Room, Sub- Yes 0 To Be Done Station, Receiving Station : 6 Aggregate area of recreational Yes 0 To Be Done Open Space . 7 Open Parking Yes 0 To Be Done 8. Water Supply : Yes 0 Gram Panchayat Connection o Sewerage (Chamber, Lines, Yes 0 To Be Done Septic Tank , STP) : 10. Storm Water Drains : No 0 Na 11. Landscaping & Tree Planting : Yes 10 100 Trees Planted 12. Street Lighting : Yes 0 To Be Done 13. Community Buildings No 0 Na 14. Treatment And Disposal Of No 0 Na Sewage And Sullaoe Water : Yours faithfully, FOR SPACE ARCHITECTS AND INTERIOR OESIGNER Qanesfi. *{fotoftqr ARCH GANESH MHAROLKAR ARCHITECT Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect cA/2OOr 127254 License Number CAl2001 127254 Agreed & Accepted by: (]. va \-\ Signature of Promoter Name: DEEPAK RADHESHYAM JHUNJHUNWALA Date: 10-01-2024