Arch. Ganesh Mharolkar SPACE cA/2001 t27254 Architects lnterior Designers 203,2nd f loor, Sh an kar Plaza,Sahaka rNagar Chowk, Opp Bank of Baroda,Dargah Road, Chh.sambhaji Nagar. 431005. Ph:0240 2970299 Cell:94231 49144. E Mail: spacear203@gmail.com. Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:09-04-2022 To, DEEPAK RADHESHYAM JHU NJHU NWAI.A, RAGHUVIR MOTORS, RAGHUVTR COMPLEX, OPPOSITE DISTRICT COURT, ADAI.AT ROAD, AURANGABAD Subject: Certificate of Percentage of Completion of Construction Work of HARIKUNJ having MahaRERA Registration Number P51500000992 being devetoped by DEEpAi RADH ESHYAM JH U NJH U NWAI.A. Sir, I / We SPACE ARCHITECTS AND INTERIOR DESIGNER have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work- of HARII(UNJ having MahaRERA Registration Number P51500000992 being developed by DEEpAK RADHESHYAM JHUNJHUNWALA. Based on the Site lnspection, with respect to the Layout / each Buildingffiing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingAfling of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B, TABLF.A For HARIKUNJ - Building A S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate 1 3 1 Excavation 100 2 X number of Base S and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and \Mndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremrses I Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the BuildingAtVlng 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A For HARIKUNJ - Building B S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100 2 X number of Baseme 4!(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 100 5 X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanita ry Fittings within the FlaUPremises, Electrical 70 Fittings within the FlaUPremises I Stai rcases, Lifts Wells and Lobbies at each Floor level 70 connecting Staircases and Lifts, Overhead and Underqround Water Tanks I The external plumbing and external plaster, elevation, 50 completion of terraces with waterproofing of the BuildingAlVing 10 n stal latio n of ifts water pum ps, Fi re Fig hti ng Fitt tng S 50 a nd AS cFo N o Electrical S to &h^ Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLF-A For HARIKUNJ - Building G S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and \Mndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0 Fittings within the FlaUPremrses 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the BuildingAlVing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLF-A For HARIKUNJ - Building D s. Tasks / Activity Percentage of Actual Work No Done (As on date of the Certificate (1) (3) ElL 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremrses 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the BuildingAtVing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 100 and Equipment as per CFO NOC, Electricalfittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLF-A For HARIKUNJ - Building E S Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, E ectrical 0 Fittinqs within the Fl aVPremises I Stai rcases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external umbi and external plaster, elevation, 0 -- completion of terraces with waterproofing of the BuildingANing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environmenl ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate TABLF-A For HARIKUNJ - Building F S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 0 2 X number of Basement(s) and Plinth 0 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 0 6 lnternal walls, lnternal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0 Fittings within the FlaUPremrses 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the BuildingMing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occu pation /Completion Certificate TABLE.A For HARIKUNJ - Building G S. Tasks / Activ !ry Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 0 4 Stilt Floor 0 5 X number of Slabs of Super Structure 100 6 lnternal walls, lnternal Plaster, Floorings within 100 Flats/Premises, Doors and \Mndows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100 Fittings within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 70 completion of terraces with waterproofing of the BuildingAlVing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 30 and Equipment as per CFO NOC, Electricalfittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAlVng, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (lnternal & External Development Works) For HARIKUNJ - Building A to G S. No. Common Areas & Facilities Proposed Percentage of actual Work Done Details (Yes / N0) (As on date of Gertificate) (1) (21 (3) (4) (5) 1 lnternal Roads & Footpaths Yes 10 Filling And Levelinq 2. Water Conservation, Rain water Yes 0 To Be Done Harvesting : 3. Energy management No 0 Na 4. Fire Protection And Fire Safety No 0 Na Requirements : 5. Electrical Meter Room, Sub- Yes 0 To Be Done Station , Receiving Station 6 Aggregate area of recreational Yes 0 To Be Done Open Space: 7 Open Parking : Yes 0 To Be Done 8 Water Yes 0 Gram Panchayat Connection 9 Sewerage (Chamber, Lines, Yes 0 To Be Done Septic Tank , STP) : 10. Storm Water Drains : No 0 Na 11. Landscaping & Tree Planting ' Yes 10 100 Trees Planted 12. Street Lighting : Yes 0 To Be Done 13. Community Buildings . No 0 Na 14. Trealment And Disposal Of No 0 Na Sewage And Sullaoe Water Yours faithfully, F0R SPACE ARCHITECTS AND lt'llERl0R DESIcNER Gonasfr filfuoftgn ARCH GANESH MHAROLKAR ' RRCHITEST Signature & Name (lN BLOCK LETTERS) of Land Surveyor / Architect cAl2ootl27234 License Number CA I 2001 127254 Agreed & Accepted by: (.{- Signature of Promoter Name: DEEPAI( RADHESHYAM JHUNJHUNWALA Dale:09-052022